Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Lead time Audio Max Electronics Company manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) card assembly, final assembly, testing, and shipping. In the PC card assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 80 printed circuit boards. Each board requires 5 minutes of assembly time. After each batch is completed, the operator moves the assembled cards to the final assembly area. This move takes 10 minutes to complete. The final assembly for each stereo unit requires 20 minutes and is also done in batches of 80 units.
A batch of 80 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 30 minutes. The units wait while the setup is performed. In the final test, the 80-unit batch is tested one at a time. Each test requires 7 minutes. The completed batch, after all testing, is sent to shipping for packaging and final shipment to customers. A complete batch of 80 units is sent from final assembly to shipping. The Shipping Department is located next to final assembly. Thus, there is no move time between these two operations. Packaging and labeling requires 8 minutes per unit. Instructions: 1. Determine the amount of value-added and non-value-added lead time and the value-added ratio in this process for an average stereo unit in a batch of 80 units. Round percentages to one decimal place. Categorize the non-value-added time into wait and move time. Value-added minutes min Non-value-added minutes: Wait time minutes min Move time minutes min Total non-value-added time min Total lead time min Value-added ratio (as a percent) % 2. How could this process be improved so as to reduce the amount of waste in the process? The input in the box below will not be graded, but may be reviewed and considered by your instructor.
Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest. How much control does the Fed have over this longer real rate?
Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.
Accounting problems, Draw a detailed timeline incorporating the dividends, calculate the exact Payback Period b) the discounted Payback Period. the IRR, the NPV, the Profitability Index.
Term Structure of Interest Rates
Write a report on Internal Controls
Prepare the bank reconciliation for company.
Create a cost-benefit analysis to evaluate the project
Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR
Distinguish between liquidity and profitability.
Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.
Simple Interest, Compound interest, discount rate, force of interest, AV, PV
CAPM and Venture Capital
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd