Draw the framework of the project life cycle

Assignment Help Project Management
Reference no: EM13560651

As a business project management student, you are expected to. understand the project planning process, making decisions based on techniques,"strategic tools and deploy the necessary techniques to achieve the over-all goal of the project. In view of this, the student can take any manufacturing or construction based . companies in Oman and they should provide the details that show their knowledge, critical thinking, and application of theories and principles in practice. As such, you are required to answer the following questions:

1. Explain the project plan for any construction or manufacturing based companies project in Oman.

(i) Meaning of Project and Project Management

(ii) Definition of Business Project Management

(iii) Draw the framework of the Project life cycle and explain it

(iv) concepts of Business Project Management (time, cost and quality)

2. Explain in detail with charts, matrix, table whereever necessary for the following sub headings:

a) Time Management Plan using Gantt Chart showing the allocation of time for your project and

b) Prepare a matrix chart allocating people to jobs is essential.

3. Explain the work breakdown structure with a WBS Chart.

4. Prepare a cost plan showing the profit calculation and compare the cost with competitor analysis using any one of the following analyses (Payback Period, NPV or IRR)

5. Explain the Change Management Plan and the Risk Management Plan with the help of a table.

Each student has to prepare a questionnaire with a minimum of 7 to 9 questions they are going to ask their stakeholders which will help to draft the outcome of this project work. At least 7 book references should be given as per the Harvard Referencing System.

Verified Expert

Reference no: EM13560651

Questions Cloud

Magnitude of the electrostatic force between the particles : A particle of charge +3.03 x 10-6 C is 10.2 cmdistant from a second particle of charge -1.85 x 10-6 C.Calculate the magnitude of the electrostatic force between the particles.
Explain hydrogen bonds between the complementary bases : The double helix of DNA is partially held together with hydrogen bonds between the complementary bases (A with T and G with C) and partially by base stacking between the aromatic bases.
Find the acceleration and friction force : A lawn mower in the form of a thin-walled, hollow cylinder withmass M is pulled horizontally with a constant horizontal force F applied by a handle attached to the axle, find the acceleration and friction force
A boat moves through the water of a river : A boat moves through the water of a river at 10.0 m/s relative to the water, regardless of the boat's direction. If the water in the river is flowing at 1.5 m/s, how long does it taket he boat to make a round trip consisting of a 300 m displacemen..
Draw the framework of the project life cycle : Draw the framework of the Project life cycle and explain it - Prepare a matrix chart allocating people to jobs is essential.
Find the angular frequency in radians per second : A simple harmonic oscillator takes 20.0 s to undergo sixcomplete vibrations. Find the angular frequency in radians per second
Describe what is the value of the rate constant : A second-order reaction required 53.8s for the concentration to drop from 0.50 M to 0.36 M. What is the value of the rate constant
Cylinder with ovable piston contains gas at a temp : A cylinder with a ,ovable piston contains gas at a temp of 27degree C, a whole volume of 1.50 m cubed and an absolute pressureof 0.200 X 10 ^ 5 pa. What will be its final temp if the gas is compressed to 0.700 m cubed and the absoulte pressure increa..
What is the initial phase angle : A transverse sinusoidal wave on a string has a period T =28.0 ms and travels in the negativex direction with a speed of 25.0 m/s. What is the initial phase angle

Reviews

Write a Review

Project Management Questions & Answers

  Two of your best program managers are in a heated debate on

two of your best program managers are in a heated debate on the best way to resolve the situation to recover a project.

  Developing a cost analysis of items of library project

Develop a cost analysis of the above items relating to the library project so we have hard numbers to work with and have a monetary value for reporting and audit purposes.

  Q1a describe and compute the followingbull designed

q1a describe and compute the followingbull designed capacitybull effective capacitybull actual outputbull

  Show the project schedule variables

Project Schedule Variables - Explain what are the variables that must be considered when developing a project schedule?

  Developing policy for reducing the hazard-incident

Develop a policy that is specific for reducing the hazard/incident.

  Project management - organizational culture amp human

project management - organizational culture amp human behavioral influencesconsider the following scenario you have

  Consulting plan and recommendations

Establish structure within the department to clarify chain of command and set responsibilities for project tasks and prepare computer program to aid as a management tool in processing funding in a timely manner

  Contingency costswhat are contingency costs how can you

contingency costswhat are contingency costs? how can you incorporate them into your project planning? should you as the

  Project evaluation using the marr

You are curious as to how long you should keep the car and you will graduate soon and you do not want to keep the car longer than 4 years.

  Question about project choices

The new financial analyst does not like the paybak approach in - 35091 - and evaluates that the firm's required rate of return is 15

  Accounting project-financial analysis and real life decision

Ideas for situation that would fit this type of analysis other than those already provided

  Materials requirements planning systems

Materials requirements planning systems are advantageous in that they

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd