Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A hollow square pyramid side of base 50mm and height 70 mm, is resting on HP on its base with all the sides of its base inclined equally to VP. A square hole of side 22 mm is drilled through the pyramid. Sides of the square hole are equally inclined to HP. Axes of the pyramid and the hole intersect at right angle 22mm above the base of the pyramid. Axis of the hole is perpendicular to VP. Draw elevation, plan and development of the lateral surfaces of the pyramid.
Compare and contrast the purpose and scope of the Federal Insecticide, Fungicide, and Rodenticide Act with the provisions of the Federal Food, Drug, and Cosmetic Act.
A condition where there are no net external forces acting upon a particle or rigid body and the body remains at rest. ... forces acting upon a particle or rigid body and the body remains at rest or continues at a constant velocity.
Also, at the failure cross sections the diameters are found to be 0.731 in., 0.645 in., and 0.587 in., respectively. Determine the percent elongation and percent reduction in area of each specimen.
What is the concentration of tracer in the reactor 1 h after tracer addition is terminated? The reactor had an initial concentration of tracer of 1.0 mg/L when tracer addition commenced.
The calculation and layout of horizontal and vertical curves should be done only by experienced surveyors and differential leveling measurements
Briefly describe the measures that should be considered for the control of corrosion of embedded steel in concrete.
a force is specified by the vector F=160i+80j-120k N.calculate the angles made by F with the postive x y and z axes.
The temperature was 200C, and the void ratio (e) of the soil was 0.43. Calculate the "Coefficient of Permeability" in "centimeters per second" (Given, k = (QL)÷(A Δh t)).
The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..
The void ratio of soil in the borrow pit is 1.12. Estimate the volume of soil (cubic meters) that must be excavated from the borrow pit.
Air can be assumed as a di-atomic ideal gas. Find the final temperature and the amount of work ( in kW) required for air compression at a rate of 100 mol/s , from an initial condition of 1 bar an 25 C to 10 bar; for the following ways.
Knowing that the coefficient of kinetic friction between a sled and the run is 0.10 and that the speed of the sled is 25 ft/s at B, determine the tangential component of the acceleration of the sled a) just before it reaches B, b) just after it pa..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd