Draw elevation, plan and development of the lateral surfaces

Assignment Help Civil Engineering
Reference no: EM13211123

A hollow square pyramid side of base 50mm and height 70 mm, is resting on HP on its base with all the sides of its base inclined equally to VP. A square hole of side 22 mm is drilled through the pyramid. Sides of the square hole are equally inclined to HP. Axes of the pyramid and the hole intersect at right angle 22mm above the base of the pyramid. Axis of the hole is perpendicular to VP. Draw elevation, plan and development of the lateral surfaces of the pyramid.

Reference no: EM13211123

Questions Cloud

Define the structures of the eight isomeric pentyl alcohols : Draw the structures of the eight isomeric pentyl alcohols (C5H11OH) and name them including primary
What were the magnitude and the direction of the velecity : If friction between the cars and the rails is neglected, what were the magnitude and the direction of the velecity of the cars after the collision?
Explain beginning with propanol as the only organic compound : Beginning with propanol as the only organic compound (expcept solvents) available,
Find the net present worth of the project : find the net present worth of the project,and the internal rate of return ,and the annual worth of the project?
Draw elevation, plan and development of the lateral surfaces : Axis of the hole is perpendicular to VP. Draw elevation, plan and development of the lateral surfaces of the pyramid.
State go per mole of dichromate ions for the reduction : What is Go per mole of dichromate ions for the reduction of dichromate ions, Cr2O72-, to Cr3+ by bromide ions, Br-, in acidic solution?
Accounting for issuance and forfeiture of shares : Provide the accounting journal entries with explanations necessary to account for the above business transactions and events.
How the total volume of both metals is measured : The total volume of both metals is measured by the displacement of water to be 419cm3 and the total mass is 4.34kg. What percentage of the spheres are copper?
Define a simulated 1h nmr spectrum : Construct a simulated 1H NMR spectrum, including proton integrations, for CH3OC(CH2OCH3)3. Drag the appropriate splitting patterns to the approximate chemical shift positions;

Reviews

Write a Review

Civil Engineering Questions & Answers

  Compare and contrast the purpose and scope

Compare and contrast the purpose and scope of the Federal Insecticide, Fungicide, and Rodenticide Act with the provisions of the Federal Food, Drug, and Cosmetic Act.

  Net external forces acting upon a particle or rigid body

A condition where there are no net external forces acting upon a particle or rigid body and the body remains at rest. ... forces acting upon a particle or rigid body and the body remains at rest or continues at a constant velocity.

  Percent elongation and percent reduction in area

Also, at the failure cross sections the diameters are found to be 0.731 in., 0.645 in., and 0.587 in., respectively. Determine the percent elongation and percent reduction in area of each specimen.

  Concentration of tracer in the reactor

What is the concentration of tracer in the reactor 1 h after tracer addition is terminated? The reactor had an initial concentration of tracer of 1.0 mg/L when tracer addition commenced.

  Survey with construction applications

The calculation and layout of horizontal and vertical curves should be done only by experienced surveyors and differential leveling measurements

  Briefly describe the measures

Briefly describe the measures that should be considered for the control of corrosion of embedded steel in concrete.

  Calculate the angles made by f with the postive x

a force is specified by the vector F=160i+80j-120k N.calculate the angles made by F with the postive x y and z axes.

  Calculating coefficient of permeability

The temperature was 200C, and the void ratio (e) of the soil was 0.43. Calculate the "Coefficient of Permeability" in "centimeters per second" (Given, k = (QL)÷(A Δh t)).

  What is the maximum height

The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..

  Estimating the volume of soil in cubic meters

The void ratio of soil in the borrow pit is 1.12. Estimate the volume of soil (cubic meters) that must be excavated from the borrow pit.

  Find the final temperature and the amount of work

Air can be assumed as a di-atomic ideal gas. Find the final temperature and the amount of work ( in kW) required for air compression at a rate of 100 mol/s , from an initial condition of 1 bar an 25 C to 10 bar; for the following ways.

  Tangential component of the acceleration of the sled

Knowing that the coefficient of kinetic friction between a sled and the run is 0.10 and that the speed of the sled is 25 ft/s at B, determine the tangential component of the acceleration of the sled a) just before it reaches B, b) just after it pa..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd