Reference no: EM131129453
The department of public works for a large city has decided to develop a Web-based pothole tracking and repair system (PHTRS).
A description follows:
Citizens can log onto a website and report the location and severity of potholes. As potholes are reported they are logged within a "public works department repair system" and are assigned an identifying number, stored by street address, size (on a scale of 1 to 10), location (middle, curb, etc.), district (determined from street address), and repair priority (determined from the size of the pothole). Work order data are associated with each pothole and include pothole location and size, repair crew identifying number, number of people on crew, equipment assigned, hours applied to repair, hole status (work in progress, repaired, temporary repair, not repaired), amount of filler material used, and cost of repair (computed from hours applied, number of people, material and equipment used). Finally, a damage file is created to hold information about reported damage due to the pothole and includes citizen's name, address, phone number, type of damage, and dollar amount of damage. PHTRS is an online system; all queries are to be made interactively.
a. Draw a UML use case diagram for the PHTRS system. You'll have to make a number of assumptions about the manner in which a user interacts with this system.
b. Develop a class model for the PHTRS system.
Prepare the journal entry to record the sale of these bonds
: Assuming instead that the above bonds sold for 104, prepare the journal entry to record the sale of these bonds on January 1, 2010.
|
What influences the purchases that you make
: Have you ever stopped to think about what influences the purchases that you make? What exactly makes you tick? This is a question that marketers spend a lot of time and money trying to figure out.
|
Which directly east of property near intracoastal waterwal
: PBMC II will be built in the lot contiguous to PBMC, which is directly east of the property near the intracoastal waterway seawall. The PBMC condominium association has directed you to draw up a perimeter protection plan that describes the latest ..
|
The manager of a bakery knows
: The manager of a bakery knows that the number of chocolate cakes he can sell on any given day is a random variable having the probability distribution (x) = 1/6 for x = 0, 1, 2, 3, 4, and 5. He also knows that there is a profit of $1.00 for each ..
|
Draw a uml use case diagram for the phtrs system
: The department of public works for a large city has decided to develop a Web-based pothole tracking and repair system (PHTRS).
|
What if prime suddenly increased 200 basis points
: What if prime suddenly increased 200 basis points? The customer enters into a position in June futures to fully hedge her position. When June arrives, the actual exchange rate is $1.725 per pound. How much did she save?
|
The loser pays the winner one dollar
: Mr. Adams and Ms. Smith are betting on repeated flips of a coin. At the start of the game Mr. Adams has a dollars and Ms. Smith has b dollars, at each flip the loser pays the winner one dollar, and the game continues until either player is "ruined..
|
What evidence does she use to support her argument
: Restate Marie Winn's argumentative thesis in "The Plug-In Drug." What evidence does she use to support her argument? Is it valid--why or why not?
|
What is durbin’s net interest for the year after the agrmnt
: A swap agreement calls for Durbin Industries to pay interest annually based on a rate of 1.5% over the one-year T-bill rate, currently 6%. In return, Durbin receives interest at a rate of 6% on a fixed-rate basis. The notional principal for the swap ..
|