QUESTION 1: A sales counter at a particular departmental store is open for two hours every evening from 4.00 PM to 6.00 PM. The counter is served by one sales person who provides an integrated service of serving customers, preparing bills and collecting payments. There have been complaints from customers of poor service and long waiting times. Management decided to study the system by simulation. It collected the following data over the two-hour period on a particular day.

784_Determine the revised critical path and project completion.png

QUESTION 2: A manufacturer of screw fasteners found that there was a market for packages of mixed screw sizes. His market researcher advised that two mixtures (A and B) of three screw types (1, 2 and 3), properly priced, would be most acceptable to the buyer. The relevant data is displayed in the table below.

2471_Determine the revised critical path and project completion1.png

The plant capacity and production costs are given in the table below.

1639_Determine the revised critical path and project completion2.png

What production should the manufacturer schedule in order to maximize total profit assuming that he can sell all that he manufactures? Provide complete details of all your calculations.

QUESTION 3 An engineering company has secured a contract to supply a steel fabrication with a target duration of 60 days. The tasks have been analyzed as follows

1735_Determine the revised critical path and project completion3.png

3.1 Draw a simple, activity-on-node, network diagram of this project.

3.2 Prepare an activity schedule (in tabular form) showing the early and late start and finish times as well as the slack times.

3.3 Identify the critical path.

3.4 What is the normal project completion time.

3.5 After completion of work on day 23, a fire broke out and destroyed all work done on task C and the work-in progress on tasks G and H. Fortunately no other completed tasks were affected, but it is estimated that task M will now need 15 days. The project manager thinks that after the fire there will be variability in the task times and has made the following uncertainty estimates.

3.5.1 Draw a network diagram of the revised project. 

3.5.2 Determine the revised critical path and project completion time

3.5.3 Calculate the probability of completing the project on time after the fire.

319_Determine the revised critical path and project completion4.png

Reference no: EM13296056

Questions Cloud

Explain intially the vessel contains 3.0 moles of methane : Intially the vessel contains 3.0 moles of methane, 3.0 moles of xenon, and 4.0 moles of oxygen. What would the partial pressure of methane be if 2.0 moles of methane are added to the vessel? Assume that the volume and temperature of the vessel rem..
Calculate the com kinetic energy of each : A 2 MeV deuteron strikes a 6Li3 nucleus. The compound nucleus splits into identical nuclides. calculate the COM kinetic energy of each
State what is the molar mass of the compound : Elemental analysis is performed on an organic liquid with a fishy odor. Vaporization of 275.0 mg of the compound in a 190-mL bulb at 110°C gives a pressure of 400.0 torr. What is the molar mass of this compound? Enter units.
How long does it take kathy to catch stan : Stan accelerates from a standing start at 2 m/s^2 and one second later Kathy accelerates from a standing start at the same position at 4 m/s^2. how long does it take Kathy to catch Stan
Draw a network diagram of the revised project : Draw a network diagram of the revised project and determine the revised critical path and project completion time
Strengths and weaknesses of your presentation : 1.What did you see as the strengths and weaknesses of your presentation?
Explain liquid helium are added to the bottle : Liquid helium at 4.20 K has a density of 0.147 g/mL. Suppose that a 1.50 L metal bottle at 110 K contains air at 3.0 atm pressure. If 50.0 mL of liquid helium are added to the bottle
Find the resultant force and direction : linda pulls a sled with force 89 newtons at 30 degrees east of north. find the resultant force and direction
Why is the other risk variable not relevant : The capital asset pricing model (CAPM) contends that there is systematic and unsystematic risk for an individual security. Which is the relevant risk variable and why is it relevant? Why is the other risk variable not relevant?

Reviews

Write a Review

Mathematics Questions & Answers

  Compute what is the probability of event

A golf bag contains 6 white balls and 8 yellow balls. What is the probability of each event?

  Find probability of a person keeping in touch with parents

Probability of a person keeping in touch with his or her parents. Please show the formula, and the steps in working the formula, to solve problems.

  Discuss how the financial information is used

Summarize each method, and discuss how the financial information is used to make a particular decision. Provide a scenario in a health care situation in which a given method of analysis might be used.

  Find the volume v generated by rotating the region

find the volume V generated by rotating the region bounded by the given curves about x = 4.

  Find two positive angles and two negative angles

Find two positive angles and two negative angles between -720° and 1080° that are coterminal with the given angle of 95°.

  Calculate the number of bridge hands

Calculate the number of bridge hands which contain and calculate the probability of being dealt each of the hands in parts (a), (b), and (c). Give your answers to 5 decimal places.

  Find the cost of firtilizing the field

the rectangular part of the field is 100 yards long and the diameter of each semicircle is 50 yards.find the cost of firtilizing the field at $0.30 per square yard.

  Equations of straight lines

A line passes through the point (6, -6) and has a slope of -3. Write an equation for this line in (x, y) coordinates. Write equations for the vertical and the horizontal lines passing through the point (6, 1) in (x,y) coordinates.

  A least squares regression line

A least squares regression line.

  Find the value of the constant c

Suppose X, Y, and Z are random variables with joint density function f(x, y, z) = Ce-(0.5x+0.2y+0.1z) if x 0, y 0, z 0, and f(x, y, z) = 0 otherwise.

  Define tree diagram and dice tossing

Develop a tree diagram for tossing two, eight-sided gaming dice to figure out how many possibilities there are. Define Tree Diagram and Dice Tossing

  What is the predicted production of an 18 foot tree

The yearly production of a 5 foot orange tree is 36 pounds of oranges. A 14 foot tree produces 72 pounds. What is the predicted production of an 18 foot tree?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd