Linear Programming

SM Furniture Ltd manufacturestwo models of display cabinets, Basic(X) and Superior (Y). On a weekly basis the firm must produce at least 2 of each type, but not more than 5 Basic or more than 6 Superior. It takes 4 hours to produce the Basic model and 5 hours for the Superior model in a 40 hour working week. At least 12 workers are needed with 2 working on the Basic model and 3 on the Superior model at any one time.

Tasks

Part 1

1. Represent the above information as a system of inequalities.

2. Draw a graph of the system and indicate the feasible region clearly.

3. If the profit (P) on the Basic model is £800 and on the Superior model is £1000, write down the objective function in the form P = ax + by

4. Enter the relevant information into an Excel spreadsheet paying particular information to the layout of the sheet. It is important that this must be readable

5. Determine the number of each type that must be produced each week to make a maximum profit. Determine the maximum profit.

Part 2

1. Critically reflect on the use of Excel to provide a solution to this problem detailing any issues in either formulating the problem or determining the solution.

2. Critique the model which you have used in solving this using Excel. In particular comment on the setting used in setting up Solver.

3. Investigate the use of other software in solving linear programming problems in general.

Reference no: EM13512999

Questions Cloud

Compute the return on investment for each division : Assume that each division is provided with an investment opportunity that could produce 20 percent return on investment. Which divisions would accept or reject it?
Culminated in the theory of cultural materialism : A very influential anthropologist, Marvin Harris, focused his research on trying to understand why societies responded to issues the way they did. His work culminated in the theory of cultural materialism,
Explain the reaction of the appropriate strong acid : Write a balanced chemical equation showing the formation of the salt, Na3PO4, from the reaction of the appropriate strong acid and strong base, and name each compound in the equation.
Find the force on an electron passing between the plates : The metal plates of a TV tube are parallel and 12 mm apart. The potential difference between them is 12 kV. Find the force on an electron passing between the plates
Draw a graph of the system : Draw a graph of the system and indicate the feasible region clearly - Critically reflect on the use of Excel to provide a solution to this problem detailing any issues in either formulating the problem or determining the solution.
Which is the more successful division in terms of koi : Using 16 percent as the minimum required rate of return, compute the residual income for each division. Which division is more successful under this rate?
Explain the size of hydrocarbon molecules : Give a theoretical explanation for the difference between the boiling point of propane and wax. Describe and explain the relationship between the size of hydrocarbon molecules and their boiling point
How much total work is done on the box in moving : Dirk pushes on a packing box with a horizontal force of 52.0 N as he slides it along the floor. How much total work is done on the box in moving it 3.20 m along the floor
Conversation analysis is a methodological approach : Conversation Analysis is a methodological approach that considers talk-in-interaction only, without resorting to contextualization, interviews or any ethnographic methods.

Reviews

Write a Review

Project Management Questions & Answers

  Machine breakdown and repair in a twelve machine factory

Machine breakdown and repair in a twelve machine factory having three repair mechanics would develop which type of queuing system line structure concerning machine breakdowns?

  Project management of applications

Project Management of Applications - Show the role of the project manager in the in-house development of a customized application.

  Project management

Project Management - As the newly appointed manager for this team, what actions would you take, and why would you take those actions?

  Show the aspects of project management

Aspects of project management and the most time consuming - In your organization, what aspects of the change management process are the most time-consuming?

  Discuss a situation from your own experience

discuss a situation from your own experience, in which that objective should be given more importance than the other two

  Aggregate planning for a bottling company

Aggregate Planning for a Bottling Company

  Calculate the per day costs for crashing

Calculate the per day costs for crashing each activity and which is the most attractive activity to start crashing? Why - How would you ensure that the construction workers do not delay the project or decrease the quality of work due to lethargy and..

  Determine the critical path and project duration in days

Determine the critical path and project duration in days and given that each resource is assigned 100% to each task, identify the resource constraints.

  Operating cash flow for a proposed projectestimate the

operating cash flow for a proposed projectestimate the first-year operating cash flow at t1 for a proposed project. the

  Project management for acme development corporation

project management for acme development corporation procurement processacme development corporation adc a developer of

  Emotional intelligence importance for project managersone

emotional intelligence importance for project managersone of the measurements of leadership is the eq emotional

  Justify the influence of stakeholders in the project

justify the influence of stakeholders in the project management plan and their role in communication

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd