Discuss your first individual variable, using graphical

Assignment Help Basic Statistics
Reference no: EM13929152

SALESCALL Inc. has thousands of salespeople throughout the country. A sample of 100 salespeople is selected, and data is

collected on the following variables.

1. SALES (the number of sales made this week)

2. CALLS (the number of sales calls made this week)

3. TIME (the average time per call this week)

4. YEARS (years of experience in the call center)

5. TYPE (the type of training, either group training, online training of no training)

The data file can be found in Doc Sharing titled Course Project Data.xlsx.

This project is due in three parts, at the end of Weeks 2, 6, and 7 respectively.

PROJECT PART A: Exploratory Data Analysis

1. Open the file Course Project Data.xlsx from the Course Project Data Set folder in Doc Sharing.

2. For each of the five variables, process, organize, present, and summarize the data. Analyze each variable by itself using

graphical and numerical techniques of summarization. Use Minitab as much as possible, explaining what the printout tells you.

You may wish to use some of the following graphs: stem-leaf diagram, frequency or relative frequency table, histogram,

boxplot, dotplot, pie chart, or bar graph. Caution: not all of these are appropriate for each of these variables, nor are they all

necessary. More is not necessarily better. In addition, be sure to find the appropriate measures of central tendency and

measures of dispersion for the above data. Where appropriate, use the five number summary (the min, Q1, median, Q3,

max). Once again, use Minitab as appropriate, and explain what the results mean.

3. Analyze the connections or relationships between the variables. There are 10 pairings here (SALES and CALLS, SALES and

TIME, SALES and YEARS, SALES and TYPE, CALLS and TIME, CALLS and YEARS, CALLS and TYPE, TIME and YEARS, TIME and

TYPE, YEARS and TYPE). Use graphical and numerical summary measures. Explain what you see. Be sure to consider all 10

pairings. Some variables show clear relationships, while others do not.

4. Prepare your report in Microsoft Word (or some other word processing package), integrating your graphs and tables with text

explanations and interpretations. Be sure that you have graphical and numerical back up for your explanations and

interpretations. Be selective in what you include in the report. I'm not looking for a 20-page report on every variable and every

possible relationship (that's 15 things to do). Rather, what I want you do is to highlight what you see for three individual

variables (no more than one graph for each, one or two measures of central tendency and variability, and two or three

sentences of interpretation). For the 10 pairings, identify and report only on three of the pairings, again using graphical and

numerical summary (as appropriate), with interpretations. Please note that at least one of your pairings must include TYPE,

and at least one of your pairings must not include TYPE.

All DeVry University policies are in effect, including the plagiarism policy.

Project Part A report is due by the end of Week 2.

Project Part A is worth 100 total points. See the grading rubric below.

Submission: The report from Part 4, including all relevant graphs and numerical analysis, along with interpretations.

Format for Report:

Brief introduction

Discuss your first individual variable, using graphical, numerical, summary, and interpretation.

Discuss your second individual variable, using graphical, numerical, summary, and interpretation.

Discuss your third individual variable, using graphical, numerical, summary, and interpretation.

Discuss your first pairing of variables, using graphical, numerical, summary, and interpretation.

Discuss your second pairing of variables, using graphical, numerical summary and interpretation

Discuss your third pairing of variables, using graphical, numerical, summary, and interpretation.

 

Reference no: EM13929152

Questions Cloud

Why cost estimation important component of project planning : Why is cost estimation such an important component of project planning? Discuss how it links together with the Work Breakdown Structure and the project schedule.
Calculate the average days to collect accounts receivables : Calculate the average days to collect accounts receivables for AutoZone and BorgWarner.
Probability of an event not occurring : 02. The Complement rule states that the probability of an event not occurring is
Explain more on the production possibility frontier graph : Can you explain more on the production possibility frontier graph? I'm confused by your answer on the points. Under points c and d it says 60,50,40 and 30 i believe. Can you explain please?
Discuss your first individual variable, using graphical : Discuss your second individual variable, using graphical, numerical, summary, and interpretation.
Management careers and diversity : A company has experienced several lawsuits as a result of equal employment opportunity (EEO) infractions. No diversity training has occurred within the company to date.
Most recent month of operations : 1  Sunshine Company, which has only one product, has provided the following data concerning its most recent month of operations   Selling price............................................................. $120     ..
Tariff on imported cheese : A country raises the tariff on imported cheese in order to increase its price above the price of domestically produced cheese. This is an example of ________.
How could cpm and pert assist you : Assume that your organization is implementing a new Employee Orientation training and you are responsible for organizing it. How could CPM and PERT assist you?

Reviews

Write a Review

Basic Statistics Questions & Answers

  Calculate the current value of travel time

What is CPI? Given that the CPI trends for travel time for 2010 and this year are 183.42 and 191.35 respectively, calculate the current value of travel time if it was $24.50 per hour in 2010.

  A random variable x follows a normal distribution with a

a random variable x follows a normal distribution with a mean of 10 and standard deviation of 3. a standardized value

  Lp model to find how many sailing lessons be scheduled

Generating at least $1500 in revenue and honoring all reservations. Formulate the LP model to determine how many Raft trips and how many Sailing lessons should be scheduled.

  A fair dice is tossed let x denote the number that appears

a fair dice is tossed. let x denote the number that appears and let y1 if an odd number appears and y3 if an even

  Find the probability that the customer

If you choose a customer at random, then find the probability that the customer-was new and paid in cash.

  Population of normal distribution

Assume that the process is in control and that the population of all jar fills is normally distributed.

  To construct a normal distribution the measurements needed

to construct a normal distribution the measurements needed area. the mean and the medianb. the mode and the standard

  Information about statistical inference

Describe a hypothesis upon which the manufacturer might wish to conduct a test concerning the relative effectiveness of the new fertilizer.

  Approximate of cameras sold

The camera department of a large department store sells three different brands of cameras: Proxima, Yakima, and Tetron. Approximately 60% of the cameras sold are Yakimas with Tetrons accounting for 30% of sales and Proxima the remaining 10%.

  Create a cumulative percentage distribution

Form the cumulative percentage distribution and plan a cumulative percentage polygon.

  Identify the appropriate hypothesis for analyzing this data

the average age for licensed drivers in a county is micro 42.6 ? 12 and the distribution is approximately normal. a

  What is the probability that at most 3 cars arrive

What is the probability that exactly 5 cars will arrive in a given hour and what is the probability that at least 3 cars arrive in a given hour ?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd