Discuss the reasons for conducting a design review

Assignment Help Computer Engineering
Reference no: EM132095178

Please do not copy or paste from the web or book.

Summarize and discuss the reasons for conducting a design review and how you would select the attendees.

Also, who would you NOT select to attend and why?

Also include your expectations as the PjM of the outcome of the design review.

CONTRACT ANNOUNCEMENT

Inventory Specialists Inc. (ISI) has recently been awarded a $9M contract by OK.COM to design, produce, and demonstrate a prototype automated inventory picker and mailer for their company. OK.COM is attempting to rival Amazon in its ability to quickly get orders in the hands of their customers as quickly as possible.

The system architecture is based on inventory management hardware and software (IMS) developed by ISI and must take inputs from the Automated Order Taking (AOT) software developed for OK.COM by SAP Software and Solutions. AOT can take orders from both customers on-line as well as from company customer service personnel.

If the merchandise is in stock, AOT then generates an order output that the PickPOCIT system must be able to process. PickPOCIT will then automatically locate the product in the warehouse; select the product off the warehouse shelve; box it if necessary, and, depending on the customer selected shipping method (2-day or standard delivery), generate and paste a UPS or USPS mailing label on the box before delivering it to the shipping department.

If the shipment is less than 5 lbs, and it is being delivered to an address within 15 miles of the shipping facility, the package will be prepared for delivery to the customer using a drone that ISI will purchase from Drone Delivery Systems, Inc. If the package is to be delivered by the drone, it must be delivered within 30 minutes of the customer's order. OK.COM will provide the AOT software as "customer furnished equipment (CFE) at no cost to ISI.

ISI proposed the PickPOCIT System concept based on the adaptation of its well-proven and low cost IMS hardware and software, and a well-planned OK.COM system integration and performance demonstration program. Previous versions of IMS have been able to:

Take in and process 200 orders a minute

Utilizing "First-In/First-Out" logic, process, locate, package, and prepare for Shipping an order within three minutes

Mean Time Between Repairs - 2500 hours of continuous operation

Software will run on existing OK.COM computer hardware

These performance specifications are not to be compromised as a result of this application for the PickPOCIT Project.

In short, ISI proposed a Commercial Off-The-Shelf (COTS), Best Commercial Practices, Event Driven approach to the development, production, and demonstration of the prototype system. OK.COM stipulated in their Request for Proposal (RFP) that industry specifications and standards be used and that the prototype system must accept input form the AOT software provided as CFE from OK.COM. ISI is formally certified ISO9000 compliant.

ISI proposed a project of twelve (12) months duration and was the lowest price bid. The contract is fixed price ($9M) with a potential additional award fee of 3%, split 60/40 on schedule and performance.

STATEMENT OF OBJECTIVES

OK.COM seeks to acquire, install, and test an automated stock picker and mailer capability to get orders to their customers via a drone,  UPS, or USPS depending on the size of the package and/or the delivery time the customer selects. The system must be installed, tested, and operational by next spring in its Baltimore, Maryland warehouse in time for an operational test already coordinated and scheduled for month 11 providing validation two months in advance of "Black Friday" 2017. .

If this prototype capability works, OK.COM will purchase 50 PickPOCIT systems for each warehouse, of which there are 50 warehouses around the United States and Canada, in time for the "Black Friday" sales rush in 2018.

PROJECT PLAN SUMMARY

ISI will develop, install, train operators and administrators, and support the demonstration test of the PickPOCIT system.

The PickPOCIT project will consist of:

1. Software refinement in order to implement the SAP AOT software.

2. PickPOCIT installation and test at the OK.COM warehouse in Baltimore, Maryland.

3. System Administrator Training.

4. Providing technical and training support during of an operational test during month 11.

Major Milestone Events for the PickPOCIT project are:

Event Date

Contract Award August 31, 2016

Project Baseline 1 month after award

SEMP (System Engineering Master Plan) 2 months after award

TEMP (Test & Evaluation Master Plan) 3 months after award

PDR (Preliminary Design Review) 4 months after award

CDR (Critical Design Review) 6 months after award

System Integration Tests 7 months after award

Full System Demonstration Tests 8 months after award

System Installation 9 months after award

Operator and System Administrator Training 10 months after award

Support Operational Test 11 months after award

Contract Test Report and all Final Documentation 12 months after award (31 Jul 2017)

Reference no: EM132095178

Questions Cloud

Compute the depreciation expense : The cost of this machine was €150,000. Compute the depreciation expense under the activity method for 2015, assuming that machine usage was 800 hours
Write a program that simulates this environment : Write a program that simulates this environment and asks the customers if they have finished or require more time with a consultant.
Create a problem hamming code probelmyourself : Create a problem hamming code probelmyourself, solve it, and explain HOW/WHY this method works for error detection and correction.
Prepare a bank reconciliation for jamison company : Prepare a bank reconciliation for Jamison Company for July which reconciles the balance per books and the balance per bank to their adjusted correct balances
Discuss the reasons for conducting a design review : Summarize and discuss the reasons for conducting a design review and how you would select the attendees.
How much will this investment in automation cost : An additional $4 per point of automation applies to any new capacity. How much will this investment in automation cost?
What is meant by sustainable management practices : Question - What is meant by sustainable management practices and what examples of such practices can be found in New Zealand
What impact does a person life experiences : What impact does a person's life experiences have on perception of situations, people and things? Give an example of how one of your life experiences
Write a matlab program using while loop : Write a Matlab program using WHILE loop that computes the sum of the elements of an array Load the lab.

Reviews

Write a Review

Computer Engineering Questions & Answers

  Mathematics in computing

Binary search tree, and postorder and preorder traversal Determine the shortest path in Graph

  Ict governance

ICT is defined as the term of Information and communication technologies, it is diverse set of technical tools and resources used by the government agencies to communicate and produce, circulate, store, and manage all information.

  Implementation of memory management

Assignment covers the following eight topics and explore the implementation of memory management, processes and threads.

  Realize business and organizational data storage

Realize business and organizational data storage and fast access times are much more important than they have ever been. Compare and contrast magnetic tapes, magnetic disks, optical discs

  What is the protocol overhead

What are the advantages of using a compiled language over an interpreted one? Under what circumstances would you select to use an interpreted language?

  Implementation of memory management

Paper describes about memory management. How memory is used in executing programs and its critical support for applications.

  Define open and closed loop control systems

Define open and closed loop cotrol systems.Explain difference between time varying and time invariant control system wth suitable example.

  Prepare a proposal to deploy windows server

Prepare a proposal to deploy Windows Server onto an existing network based on the provided scenario.

  Security policy document project

Analyze security requirements and develop a security policy

  Write a procedure that produces independent stack objects

Write a procedure (make-stack) that produces independent stack objects, using a message-passing style, e.g.

  Define a suitable functional unit

Define a suitable functional unit for a comparative study between two different types of paint.

  Calculate yield to maturity and bond prices

Calculate yield to maturity (YTM) and bond prices

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd