Discuss the reasons for conducting a design review

Assignment Help Operation Management
Reference no: EM131900478

Please do not copy or paste from the web or book.

Summarize and discuss the reasons for conducting a design review and how you would select the attendees. Also, who would you NOT select to attend and why? Also include your expectations as the PjM of the outcome of the design review.

CONTRACT ANNOUNCEMENT

Inventory Specialists Inc. (ISI) has recently been awarded a $9M contract by OK.COM to design, produce, and demonstrate a prototype automated inventory picker and mailer for their company. OK.COM is attempting to rival Amazon in its ability to quickly get orders in the hands of their customers as quickly as possible.

The system architecture is based on inventory management hardware and software (IMS) developed by ISI and must take inputs from the Automated Order Taking (AOT) software developed for OK.COM by SAP Software and Solutions. AOT can take orders from both customers on-line as well as from company customer service personnel. If the merchandise is in stock, AOT then generates an order output that the PickPOCIT system must be able to process.

PickPOCIT will then automatically locate the product in the warehouse; select the product off the warehouse shelve; box it if necessary, and, depending on the customer selected shipping method (2-day or standard delivery), generate and paste a UPS or USPS mailing label on the box before delivering it to the shipping department.

If the shipment is less than 5 lbs, and it is being delivered to an address within 15 miles of the shipping facility, the package will be prepared for delivery to the customer using a drone that ISI will purchase from Drone Delivery Systems, Inc. If the package is to be delivered by the drone, it must be delivered within 30 minutes of the customer's order. OK.COM will provide the AOT software as "customer furnished equipment (CFE) at no cost to ISI.

ISI proposed the PickPOCIT System concept based on the adaptation of its well-proven and low cost IMS hardware and software, and a well-planned OK system integration and performance demonstration program. Previous versions of IMS have been able to:

Take in and process 200 orders a minute

Utilizing "First-In/First-Out" logic, process, locate, package, and prepare for Shipping an order within three minutes

Mean Time Between Repairs - 2500 hours of continuous operation

Software will run on existing OK.COM computer hardware

These performance specifications are not to be compromised as a result of this application for the PickPOCIT Project.

In short, ISI proposed a Commercial Off-The-Shelf (COTS), Best Commercial Practices, Event Driven approach to the development, production, and demonstration of the prototype system. OK.COM stipulated in their Request for Proposal (RFP) that industry specifications and standards be used and that the prototype system must accept input form the AOT software provided as CFE from OK ISI is formally certified ISO9000 compliant. ISI proposed a project of twelve (12) months duration and was the lowest price bid. The contract is fixed price ($9M) with a potential additional award fee of 3%, split 60/40 on schedule and performance.

STATEMENT OF OBJECTIVES

OK.COM seeks to acquire, install, and test an automated stock picker and mailer capability to get orders to their customers via a drone, UPS, or USPS depending on the size of the package and/or the delivery time the customer selects. The system must be installed, tested, and operational by next spring in its Baltimore, Maryland warehouse in time for an operational test already coordinated and scheduled for month 11 providing validation two months in advance of "Black Friday" 2017. . If this prototype capability works, OK.COM will purchase 50 PickPOCIT systems for each warehouse, of which there are 50 warehouses around the United States and Canada, in time for the "Black Friday" sales rush in 2018.

PROJECT PLAN SUMMARY

ISI will develop, install, train operators and administrators, and support the demonstration test of the PickPOCIT system.

The PickPOCIT project will consist of:

1. Software refinement in order to implement the SAP AOT software.

2. PickPOCIT installation and test at the OK.COM warehouse in Baltimore, Maryland.

3. System Administrator Training.

4. Providing technical and training support during of an operational test during month 11.

Major Milestone Events for the PickPOCIT project are:

Event Date

Contract Award August 31, 2016

Project Baseline 1 month after award

SEMP (System Engineering Master Plan) 2 months after award

TEMP (Test & Evaluation Master Plan) 3 months after award

PDR (Preliminary Design Review) 4 months after award

CDR (Critical Design Review) 6 months after award

System Integration Tests 7 months after award

Full System Demonstration Tests 8 months after award

System Installation 9 months after award

Operator and System Administrator Training 10 months after award

Support Operational Test 11 months after award

Contract Test Report and all Final Documentation 12 months after award (31 Jul 2017)

Reference no: EM131900478

Questions Cloud

Skip campaigning in low- population states : "Presidential Candidates Skip Campaigning in Low- Population States"; "Winner Of Popular Vote Loses Election" These headlines refer to controvemost
Why the are important in todays employment setting : Discuss some of the protected classes covered by Equal Employment Opportunity and why the are important in today's employment setting.
What structure did gustave eiffel design : In ancient history, What structure did Gustave Eiffel design?
What time period were dinosaurs : What time period were dinosaurs roaming the earth and when did they go extinct?
Discuss the reasons for conducting a design review : Summarize and discuss the reasons for conducting a design review and how you would select the attendees.
Declaration of independence : Who influenced the principles of government that Thomas Jefferson included in the Declaration of Independence.
What was the burial site used by egyptian rulers : What was the burial site used by Egyptian rulers of the New Kingdom period (1570-1070 BC) called?
Power of government between the monarch : French Enlightenment philosopher Baron De Montesquieu praised the British political system because it divided the power of government between the monarch
Determine the coefficients for the independent variable : Determine the constant and coefficients for the independent variable. Verify the significance of all variables included in the model.

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd