Discuss the managerial implications of the results

Assignment Help Computer Engineering
Reference no: EM131889462

SYSTEMS ANALYSIS AND REDESIGN PROJECT - PHASE

INSTRUCTIONS

Recall the three stages of the project:

Phase 1: Introduction, problem statement, framework, narrative, and project plan
Phase 2: Methodology to compare the old and new systems and thesystems analysis
Phase 3: Results of comparisonof the old and new systems and the systems design

In phase 3 you will use the methodology developed in phase 2 to compare the old information system analysis and design to the new information system that is cloud-capable, highly available, scalable, and secure. You will use the scholarly supported computing framework and standards (e.g. COBIT, NIST, etc) to benchmark the systems analysis and design of the old and new system. One you perform this comparison, you will detail the results.

Phase 2Report Requirements

This report must contain the following elements:

I. See the grading rubric for all minimums.
II. Cover page
III. Table of Contents (TOC)
IV. Every section must be well supported with scholarly information systems journal articles.
V. Executive Summary and conclusion sections

a. You will write an executive summary after the rest of the report. An executive summary is not a narrative version of the TOC. It is a 250 word executive overview that presents the major information from the report so that an executive whose time is limited can quickly understand the essence of the report.

b. The conclusion should be the last heading and conclude the entire project.

VI. Systems analysis and design results

a. Follows a well-supported methodology including at least one framework and appropriate standards from scholarly journal articles

b. Uses objective standards accurately to benchmark the old system and the new system

c. Minimal comparison elements should include system:

i. Cloud/distributed computing capabilities
ii. High availability
iii. Scalability
iv. Security
v. Note, these are projected based upon the benchmarked standards that you compare both systems to

d. A final updated financial analysis that projects associated costs of both systems once the final design is completed

e. Discuss the managerial implications of the results

f. Uses excel spreadsheets, graphs, figures, and tables to show the objective comparisons of the systems

VII. Systems analysis diagrams

a. Screenshots are required for each diagram with a visible operating system date/time and unique desktop element showing that indicates it is your computer

i. No credit will be given for diagrams without screenshots

ii. Include the screenshots in appendices in the project report

b. Describe the systems analysis as you complete it in a narrative form and link in each associated diagram referenced in the narrative using an appendix

c. Each diagram will be assessed according to UML standards and a level of detail that excels beyond textbook examples

i. Note, textbook examples are simpler versions meant to learn and not as complex as industry diagrams often

ii. Our textbook is a graduate version of systems analysis and design. If you need additional undergraduate textbook support we encourage you to use Safari e-books from the Liberty Library. Our undergraduate textbook develops the more foundational SAD learning using the textbook:

1. Dennis, A., Wixom, B. H., & Tegarden, D. (2015). Systems analysis & design: An object-oriented approach with UML (5th ed.). Hoboken, NJ: Wiley and Sons.

d. A minimum of two diagrams are necessary for each required type, one diagram represents the existing system and one diagram represents the new re-designed and improved system

e. The following systems design diagrams are required that compare the old and new systems:

i. Entity relationship data model diagrams
ii. Class diagrams
iii. User interface forms
iv. Distributed computing network and system architecture diagrams

1. Design the complete information system architecture environment for the old and new environments.

Reference no: EM131889462

Questions Cloud

Action that involves communication to staff : Using your implementation plan, choose to either design and deliver a presentation (according to the action that involves communication to staff through a prese
Basic simulation model to simulate tumour growth : Question: Come out with a basic simulation model to simulate tumour growth which follows the paper CPM and LGCA
Menu planning and restaurant themes : 1) What kind of activities should there be for young and old? 2) What special considerations should be established for menu planning and restaurant themes?
Strategies for addressing these issues for the future : List three current challenges to the fashion industry and discuss the strategies for addressing these issues for the future.
Discuss the managerial implications of the results : Discuss the managerial implications of the results. Describe the systems analysis as you complete it in a narrative form and link in each associated diagram.
Discuss mortgage loans in terms of loan amortization : Post a substantive response to the question - Discuss mortgage loans in terms of loan amortization - Reply in a scholarly and substantive manner
Understanding the legal responsibilities under emtala : Understanding the legal responsibilities under EMTALA, what might be the most appropriate way of dealing with the overutilization of Emergency Department
Practice for composing and revising business : Apply best practice for composing and revising business messages and how can you tell if someone is really listening?
Design and deliver a presentation : Using your implementation plan, choose to either design and deliver a presentation (according to the action that involves communication

Reviews

Write a Review

Computer Engineering Questions & Answers

  Mathematics in computing

Binary search tree, and postorder and preorder traversal Determine the shortest path in Graph

  Ict governance

ICT is defined as the term of Information and communication technologies, it is diverse set of technical tools and resources used by the government agencies to communicate and produce, circulate, store, and manage all information.

  Implementation of memory management

Assignment covers the following eight topics and explore the implementation of memory management, processes and threads.

  Realize business and organizational data storage

Realize business and organizational data storage and fast access times are much more important than they have ever been. Compare and contrast magnetic tapes, magnetic disks, optical discs

  What is the protocol overhead

What are the advantages of using a compiled language over an interpreted one? Under what circumstances would you select to use an interpreted language?

  Implementation of memory management

Paper describes about memory management. How memory is used in executing programs and its critical support for applications.

  Define open and closed loop control systems

Define open and closed loop cotrol systems.Explain difference between time varying and time invariant control system wth suitable example.

  Prepare a proposal to deploy windows server

Prepare a proposal to deploy Windows Server onto an existing network based on the provided scenario.

  Security policy document project

Analyze security requirements and develop a security policy

  Write a procedure that produces independent stack objects

Write a procedure (make-stack) that produces independent stack objects, using a message-passing style, e.g.

  Define a suitable functional unit

Define a suitable functional unit for a comparative study between two different types of paint.

  Calculate yield to maturity and bond prices

Calculate yield to maturity (YTM) and bond prices

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd