Reference no: EM132362615
Complex Project Management Discussion Assignment -
Following the Radar Diagram you have produced for DF2, you are invited to discuss the level of complexity within the GERD dam in more details.
Your tasks as follow:
1- Refer to slide No. 8 in Week 5 lecture slides, you need to discuss the applicability of the complexity characteristics to the case of GERD dam. This means you need to analyse and discuss the following:
A) Do you agree with the defining characteristics of complexity in projects as it is? Or you think these characteristics have different order in the case of GERD?
B) Explain why do you think so? What is your rationale and how do you see these characteristics in the case of the GERD.
2 - After defining the characteristics of the GERD, you need to sum up similar characteristics in one of the main four complexity types (Structural, Technical, Temporal or Directional) and identify what is the most significant complexity type in the GERD.
3 - You are requested to initiate a scorecard (using any of the complexity estimation tools) to ROUGHLY estimate the complexity of the GERD project. This requires you to do the following:
A) Conduct a survey to assign weights for each complexity factor. You may need to ask your peers (students from your tutorial and class), lecturers.. to take part in this survey (minimum of 15 volunteers)
B) Your discussion should include a list of all interviewees with their contact details/ name.
Attachment:- Lecture Slides.rar