Discuss if you are going or not to stabilize the slope –why

Assignment Help Civil Engineering
Reference no: EM13536750

You are the engineer in charge of a project sitting on the bottom of a hill close to the city Auckland, New Zealand, with a very humid and unpredictable weather. You want to make sure that the hill slope –the earth of which has also been excavated by your teams and the organic soil and vegetation removed- will remain stable for the safety of your workers. A geotechnical inspection let you know that the angle of repose of the hill is slightly lower than that of the natural undisturbed soils in dry conditions. Please discuss if you are going or not to stabilize the slope –why?

Given that that there is no budget to built any type of artificial protection enclosure or retention wall but you still have some allowance for using earthmoving equipment, which of the techniques discussed in class would appropriate in case slope protection was to be built. Clearly name and draw this technique.

Reference no: EM13536750

Questions Cloud

What size galvanized iron pipe is required to carry a flow : What size galvanized iron pipe (e=0.0005ft) is required to carry a flow of 5 cfs of water at 60 degrees F (v=1.217X10^-5) without exceeding a head loss of 5.0 ft/100ft of pipe?
How to write the introduction of the essay : How to write the introduction of the essay.
How many truckloads of trucks hauling an average volume of : How many truckloads of trucks hauling an average volumeof 6 LCY (4.6 LCM) would be required to haul 1 million CCY (764, 600 CCM) of gravel to a dam site?
Strategy affects the organization and type of applicant pool : Discuss non-traditional inducements organizations are using on how this strategy affects the organization and type of applicant pool it
Discuss if you are going or not to stabilize the slope –why : Given that that there is no budget to built any type of artificial protection enclosure or retention wall but you still have some allowance for using earthmoving equipment, which of the techniques discussed in class would appropriate in case slope pr..
Recommend two different solutions that could allow the sites : Your next project site is an old landfill, which reaches a depth of 30 feet. Below, there are many layers of both competent and caving soils, but none of the competent soil layers capable of giving the needed bearing capacity under the 12’’ diameter ..
The cheesecake factory overall market potential : What are your views regarding The Cheesecake Factory's overall market potential?
Write and expression for a in terms of b that makes : For the following velocity profiles state whether they are steady or unsteady and whether they are 1-D, 2-D or 3-D.
Find the inititial population : A 5 cm diameter, 6 m high pole is fixed in concrete. The pole supports a circular 4 m diameter sign. Estimate the maximum moment that must be resisted by the concrete for a wind speed of 30 m/s (wind is assumed normal to the sign; density of air = 1...

Reviews

Write a Review

Civil Engineering Questions & Answers

  Vehicle delay due to queuing

Vehicles begin to arrive at a toll booth at 850 am with an arrival rate of x(t) = 4.1 + .01t (with t in min and x(t) in veh /min.) The toll booth opens at 9am and processes vehicles at a rate of 12 per minute throughout the day. Assuming D/D/1 que..

  What is the efficiency of the device

If a mechanical device requires 450J of work to do 310J of work in lifting what is the efficiency of the device?

  Determine the maximum torque that can be carried by hollow

A 24-in.-wide by 0.100-in.-thick by 140-in.-long steel sheet is to be formed into a hollow section by being bent through 360° and having the long edges welded (i.e., butt-welded) together. Assume a cross-sectional medial length of 24 in.

  Compute azimuths of all lines for aclosed traverse

Compute azimuths of all lines for aclosed traverse ABCDEFGHA that has the following balanced angles tothe right, using Bearing AB = N56º18'42"W.

  What is the level of service on a km long percent upgrade

A rural freeway has an ideal free-flow speed of 120 km/h and two 3.6 m lanes in each direction, with right shoulder lateral clearance of 1.2 m. Interchanges are spaced approximately 5 km apart. Traffic consists of 10 percent trucks and buses and 8..

  What engineering parameter must the joint surfaces possess

The roadway is to be widened which will require a slope face cut at a steeper angle. Assume zero cohesion along the joints. What engineering parameter must the joint surfaces possess (magnitude) to be stable

  Estimate the amount of coal needed to light one 100-w

A 25-W compact fluorescent lightbulb (CFL) produces the light equivalent of a 100-W incandescent bulb. The population of North America is estimated to be about 305 million.

  Calculate the total head loss for water flowing at a rate

Calculate the total head loss for water (25°C) flowing at 100 m3/hr. The total flow length is 250 meters and the pipe is 15-cm diameter cast iron pipe

  Does stitching on ball have any influence on the trajectory

A baseball is hit from home plate and travels over the center field fence. What would the trajectory of the baseball look like if air-resistance was not factored in

  Determine the amount of the energy losses in meters

A rectangular channel carries a discharge of 2.00 m3/sec per meter of channel width over a weir crest that is 1.4 m in height. The energy grade line upstream of the weir measure 2.7 m above the channel bottom.

  Find ratio of he volume in colorado over that in new york

In New york you had a balloon inflated with helium (He) and you measured its temperature, which was 89.6 degree F, and its pressure, which was 100,000 N/m^2. In Colorado, however, you noticed that the temperature of the He was 69.8 degree F and th..

  Find what is the pressure on the soil if theta is 45 degrees

A pipe is to be installed under the ground on a bed of aggregate 6 in. thick. The entire weight on the aggregate from pipe and soil above the pipe is 1800 lbs. per linear foot of pipe. What is the pressure on the soil if theta is 45 degrees

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd