Case 1: Architects' Administration

  • This project is a $4Million elementary school remodel that was bid lump sum. There are numerous conflicts in the documents, many of which are associated with matching new to existing work. The project manager for the general construction firm has become frustrated with the lack of paperwork from the architect. The architect appears to have run out of construction administration funds. Some of the problems and responses to request for support are listed below.
  1. Responses to the RFI process include: "I don't want a written question, just give me a call"
  2. The architect will answer written RFI's with a verbal
  3. He will not meet in the field and review actual conditions
  4. Written responses quite often just indicate "see the plans or specifications"
  5. Submittals are late being returned and they often do not include any disposition 
  6. The architect misses many weekly construction meetings, showing up at some late and leaving others early
  7. He never brings his meeting notes and does not acknowledge ever receiving them 
  8. He is also not reviewing change orders in a prompt fashion

Question 1: What should the project manager do to resolve this issue? What could the school have done to prevent this from happening? What risks do both the general contractor and the school incur if this situation is left unchecked? What risks does the architectural firm incur?

Reference no: EM132454433

Questions Cloud

Human development index : In 2008, the United Nations ranked Canada fourth on the Human Development Index (HDI)-- a ranking of the "quality of life" in many countries. Yet in that year
Slide Designs and Visual Aides : Consider the importance of visuals in connecting with an audience. Discuss a moment or experience in your life when a picture,
Leadership skills and develop plan for moving forward : Develop a personal leadership philosophy and support your ideas with material from this course and outside research.
Determine which waste anesthetic gas removal method : Determine which waste anesthetic gas removal method is best and why. Can waste anesthetic gas be removed by standard medical vacuum, why or why not?
Discuss architects administration : What should the project manager do to resolve this issue? What could the school have done to prevent this from happening?Architects' Administration
What is the fair value of the equipment : Lease payment $6,000 at lease inception If the interest rate implicit in the lease is 8%, what is the fair value of the equipment at the inception of the lease
Research the exxon valdez accident : What is sustainability? Describe how LCA (Life Cycle Assessment) helps in developing environmental friendly products? (write at least 2 paragraphs).
Discuss relationship between time and budget : Outline what you believe the action plan should be to bring Project AKU in on-schedule, on-budget and meet the customer requirements.
Compute the labor rate and efficiency variances for April : Corex Company produces several products in its factory, including a karate robe. Compute the labor rate and efficiency variances for April

Reviews

Write a Review

Other Engineering Questions & Answers

  Design a suitable mining system in detail

Mine Planning and Scheduling (ENGIN5505) - Federation University - design a suitable mining system in detail for the shallow part of the deposit.

  Evaluate the time interval required to empty

(a) Show that the time interval required to empty the tank is given by (b) Evaluate the time interval required to empty the tank if it is a cube 0.500 m on each edge, if A = 2.00 cm2, and d = 10.0 m.

  Discuss about installing solar panels to houses

The project is about installing solar panels to houses, which involves designing scheme and project implementation.don't have to include any specific technology

  ME606 Digital Signal Processing Assignment

ME606 Digital Signal Processing Assignment Help and Solution - Melbourne Institute of Technology, Australia. Review of popular signal-processing task

  Determine the temperature rise in metal temperature

Determine the temperature rise in metal temperature due to the increase in scale thickness from 30 microns to 500 microns. The overall heat transfer coefficient is given by [10]:

  Compute the tensile strength for the composite

Compute the tensile strength for the composite of given exercise assuming that all the fibers have the same tensile strength.

  Does the operation of this circuit rely on charge storage

Figure shows a commonly used circuit of a D flip-flop that is triggered by the negative-going edge of the clock φ. (a) For φ high, what are the values of Q and Q in terms of D? Which transistors are conducting? If Dis high and φ goes low, which tr..

  The importance of impedance, rise-time and bandwidth

Discuss the connection between rise-time and bandwidth in amplifier circuits.

  What is the freeways aadt

It is known that 12% of the AADT occurs in the peak hour and that the directional factor is 0.6. What is the freeway's AADT?

  Report on an engineering failure of a consumer product

ENGG100 Assessment A6: Failure analysis. Write a report (max. 4 pages) on an engineering failure of a consumer product. Present the failure analysis in the style of a technical report. Introduce the failure with supporting information

  Implement current network design

MN503 - configure networking devices for a given business case study and understand limitations of a network design - administration and management

  Design a circuit and arduino program that accomplishes

Design a circuit and Arduino program that accomplishes the following. Reads a press of a pushbutton once, and it cycles through all possible brightness values.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd