Reference no: EM131400991 , Length: 4
Project Management Assignment
You have been assigned as the Project Manager to oversee the maintenance requirements for The James River Bridge and the Hampton Roads Bridge Tunnel in Virginia. You also have the flexibility to determine the time frame (how long the maintenance will require). The Project Manager will authorize the work that must be done and provide the following project elements in a detailed statement that will explaining each area: The eight maintenance items you need to discuss is for the james river bridge: electrical lighting, grates, inspection structure, greasing hydralic motors, and pot hole repair. For the hampton bridge tunnel: structure inspection, cleaning of the celing and walls, electrical lighting, pothole repairs, emergency broadcasting inspection.
the three elements
Contract requirements: a general structure of mangerial, reporting and performing responsisbilities, , suppliers, subcontractors,managerial requirements and agreements, and reporting requirements.
Schedules: A list of of all major events, tasks, and subschedules, from which a master schedule is devepoled
Resource: The overall project budget for all resource requirements and procedures for budgetary control.
four pages plus reference page.
Estimate the value of r for given distribution
: Estimate the value of r for this distribution. What does r tell you about how pennies go out of circulation? Why the height of the first bar shorter than one is would expect in a geometric distribution?
|
Best oral communication skills
: Describe a time when you had to use best oral communication skills. What was the situation and what was the outcome?
|
Different sources of biographical information
: #1. What are the potential uses of the literature review in research? #2. Name three different sources of biographical information and their advantages and limitations
|
What are the interesting features of given distribution
: Get a copy of the current Handbook of United States Coins: Official Blue Book of United States Coins, and graph the distribution of the number of pennies minted in each year. What are the interesting features of this distribution?
|
Discuss about the project management
: You have been assigned as the Project Manager to oversee the maintenance requirements for The James River Bridge and the Hampton Roads Bridge Tunnel in Virginia. You also have the flexibility to determine the time frame (how long the maintenance w..
|
Describe the type of structure
: You own a new resort on a small Caribbean island that is scheduled to open the following year. Draw up an organizational chart for your new venture. Draw up an organizational chart for your new venture, describe the type of structure and explain w..
|
Design a noninverting amplifier
: Design a noninverting amplifier with an appropriate closed-loop voltage gain of 150 and a minimum input impedance of 100Ω using a 741 op-amp. Include bias current compensation.
|
Sketch the sampling distribution of the sample mean
: The distributions you constructed for samples of size 1, 5, 10, and 25 are called sampling distributions of the sample mean. Sketch the sampling distribution of the sample mean for samples of size 36.
|
Describe the change that you propose and defend
: Using the same organization that you selected in Week 1, propose a change that your organization could implement that would aid it strategically. The proposed change might relate to some area of need, performance deficiency, or other opportunity t..
|