Discharged of wastewater to aquifer

Assignment Help Civil Engineering
Reference no: EM1383478

Wastewater is discharged into an aquifer. This wastewater contains 0.1 ppm atrazine (a common herbicide). The MCL of atrazine is 5 ppb, the density is 1.19 g/mL and the solubility is 50 ppm. 500 ft away from the plant effluent there is a permeable reactive barrier filled with activated carbon. The aquifer has a hydraulic conductivity of 100 gpd/sf, an area of 50 sf, porosity of 0.4 and a hydraulic gradient of 0.003.

a. What is the discharge through the aquifer?

b. How long does it take for the wastewater effluent to reach the barrier?

c. How much atrazine must be removed per day to comply with the MCL regulation?

Reference no: EM1383478

Questions Cloud

Average shearing stress : Two strips of a plastics material are bonded together as shown. The average shearing stress in the glue must be limited to 1000 kpa.
Equal-tangent crest vertical curve : An equal-tangent crest vertical curve is designed with a PVI at station 110+00 and a PVC at station 107+43.3. if the high point is station 110+75.5 what is the design speed of he curve?
Well-known architect frank lloyd wright : Many years ago, well-known architect Frank Lloyd Wright designed a mile-high skyscraper, which has never been built.
Problem regarding helium balloons : To float a 160 pound man using helium balloons (assume 0.52 cubic feet per inflated balloon). How many balloons would it take? Assume density of air is 1.29 kg/cubic meter and the density of helium is 0.179 kg/cubic meter.
Discharged of wastewater to aquifer : Wastewater is discharged into an aquifer. This wastewater contains 0.1 ppm atrazine (a common herbicide). The MCL of atrazine is 5 ppb, the density is 1.19 g/mL and the solubility is 50 ppm. 500 ft away from the plant effluent there is a permeable..
Seepage velocity and estimating hydraulic gradient : The dye appears 14 days later in an observation well 75 ft away from the injection point. Compute the seepage velocity and estimate the hydraulic gradient in the aquifer if the porosity of the soil is 42%.
Tightening of bolt in the friction grip : What difference does the tightening of bolt in the friction grip joint make to the load at first slip and the failure load.
Determine the volume flow rate of water : Water with a static pressure of 1.96kN/M 2 flows through an 800 mm diameter pipe. A pitot tube pressure gage in this pipe reads a pressure of 5.88 kN/M 2 . How do you determine the volume flow rate (Q) of the water? (Q = 1.40 M^3/sec, V=2.79 M/se..
Power plant efficiency problem : A 600 MWe power plant has an efficiency of 36% with 15% of the waste heat being released to the atmosphere as stack heat and the other 85% taken away in the cooling water.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the stress state at points a & b

CE 3303 – Solids – MWF – Spring 2014 - Homework Set 23, – The pipe shaft of the auger, rotating at a constant angular velocity, is subject to the axial force and torque shown. Determine the stress state at points A & B and show on a stress element.

  Calculate the total drilling cost

Calculate average figures for tonnes/round and powder factors in kg/tonne and Determine the drill metres required to achieve a production rate from grade control blasting.

  Crystalline or atomic structure

Describe the crystalline or atomic structure of the following minerals: 1) Brucite 2) Gibbsite 3) Bentonite 4) Illite

  Determining axial load of a dense sand

A dense sand has an effective friction angle of 43 and c'=0. A dry, 2.8-inch diameter sample is tested in drained triaxial shear with a confining pressure of 2500 psf. What axial load, P (in pounds), will be required to fail the sample?

  Finding average time in system

If the time required to pay for parking is exponentially distributed with a mean of 15 seconds, find the average time in system.

  Waterline of center of gravity

The ship has a total weight of 155,000 tons, length = 1,600 feet and a beam = 150 feet (assume that it is the shape of a rectangular box). Calculate the height above the waterline of its center of Gravity (G).

  Magnitude of the acceleration of the train

The train passes point A with a speed of 30 m/s and begins to decrease its speed at a constant rate of at = - 0.25 m/s2. Determine the magnitude of the acceleration of the train when it reaches point B, where sAB = 412 m.

  Required to dewater a construction site

It is required to dewater a construction site 80 m by 80 m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m.

  Magnitudes of fac and fad

The 70 m tall tower is supported by three cables that exert forces FAB, FAC, and FAD on it. The magnitude of the force FAB is 2 kN. The x and z components of the vector sum of the forces exerted on the tower by the three cables are zero. What are ..

  Comparative analysis of the types of safeguards

Provide a comparative analysis of the types of safeguards would you suggest for the company's information system.

  Freeways density and level of service

What will the freeway's density and level of service be before and after the ban? (Assume that the trucks are removed and all other traffic attributes are unchanged).

  Force exerted by the hydraulic cylinder

The gate is rectangular with a horizontal width of 2m perpendicular to the paper. For a depth h = 3m of water, calculate the required force exerted by the hydraulic cylinder to keep the gate just closed.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd