Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A conical tube of length 8 m fixed vertically with its smaller end upwards. The velocity head and pressure head at upper ends are 1.27 m and 2.50 m respectively. The velocity head and pressure head at lower ends are 0.203 m and 5.407 m respectively. Find the direction of flow.
The posItIon of a particle along a straight line is given by s = (t 3 - 9t 2 + 1St) ft, where t is in seconds. Determine its maximum acceleration and maximum velocity during the time interval 0 :5: t :5: 10 s.
Pore water pressure is to be observed during the construction of the embankment. Calculate the pore water pressure which must not be exceeded at any point in the clay layer 9 m below the surface of the embankment to ensure a shear strength of 100 ..
Set up life cycle diagram for both alternatives and calculate net present value (NPT) and annual cost for the life time.
the maximum degree of curvature can be at most 6.0 and the superelevation can be at most +6.0%. Design the ramp for the highest horizontal curve design speed given the constraints.
Determine the required pumping rate. the aquifer has T= 1600 m 2 /day and the wells each have radius of influence of 600m.
Starting from x = 0 with no initial velocity, the acceleration of a race car is defined by the relation a = 6.8e- 0.00057x , where a and x are expressed in m/s 2 and meters, respectively. Determine the position of the race car when v = 30 m/s.
Land is extremely valuable in this area therefore to win this job you need to consider innovative approach to reduce the waste areas
If the water vapor is removed from the upper tank so that the concentration there remains nearly zero, what mass of water vapor diffuses through the tube each hour?
Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.
What would be the Horizontal and vertical component from this acting force see diagram
Find the time for one complete cycle of this motion if the spring constant is 21 N/m. (Assume that once the pendulum ball hits the spring there is no effect due to the vertical movement of the ball.)
Determine the number of man-hours required to form the structure using data from R. S. Means or other appropriate reference. What is the difference between labor cost and labor pro-ductivity?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd