Different process planning techniques

Assignment Help Project Management
Reference no: EM13127602

Task 1

Evaluate the use of three different process planning techniques

Select and assess the use of a capacity assessment technique for two different types of process

Explain the use of a range of scheduling techniques

1. Mechanical Option:

Manufacturing processing techniques used for Alloy Wheel manufacturing include the followings:

- Forging
- High Pressure Die Casting
- Low Pressure Die Casting
- Gravity Casting (Permanent mould and sand casting)
- Quality control

2. Electrical Option:

Manufacturing processing techniques used for electric cables manufacturing include the followings:
- Wire drawing
- Wire grouping to make conductor
- Insulation
- Phase wiring
- Outer sheath
- Quality control

Q1: Provide an overview of the specific manufacturing case study that you have selected.

Q2:Discuss and evaluate three process planning techniques (CPM, PERT and MRP) for any of the manufacturing processes relevant to the selected case study.

Q3: Discuss and assess the use of capacity assessment technique for two different processes of the manufacturing processes relevant to the selected case study.

Q4: For one process of the selected manufacturing processes relevant to the selected case study, discuss and explain the use of two scheduling techniques.

Task 2

Explain an application of the principle of inventory management

The process to oversee the constant flow of components or units of a product into and out of an existing inventory is called Inventory Management. Discuss and explain how the principles of inventory management are used in the selected product.

Task 3

Compare and evaluate two different stock control systems

Two bin system and Kanban are two of many stock control systems used in inventory management. Compare these two systems and evaluate the use of either of them in the selected case study.

Task 4 -

Discuss two different shop floor documentation systems

Explain the functions of shop control

Q1: Stock record, works order, job tickets and recording of finished quantities are few examples of the documentation systems that are used in recording and controlling components and product production and stocking in any manufacturing and distribution industry. Discuss and explain the use of two of these documentation systems or any other two that are relevant to your case study.

Q2:;Scheduled release of work orders and data collection and feedback are two types of shop control systems; explain how are they used in stocking and distributing the product of your selected case study.

Task 5

Explain the methods of classifying and coding component parts into family groups

Explain how family groups of components are sequenced for processing through grouped facilities

Q1: The processes of categorizing parts of your selected product into groups is called classification; define and explain two methods that are used in classifying and coding the parts of your selected product into family groups.

Q2: Parts of any product classified into groups and families according to their design, geometrical shape, manufacturing processes and layout. Explain how are parts of your selected product or your products grouped into family groups and how are these family groups sequenced for processing through grouped families.

Task 6

Produce a process plan from a given set of data

Produce a production schedule from a process plan

Q1: Using a computer software (Microsoft project) produce a process plan including the identification of timing, completion dates, material required, equipment and tools required and man power (labours, engineers and management) needed to produce a bundle of 100 units of your selected product. Explain the method of preparing your plan and how it is evolved.

Q2: Provide screen shoots or print out of the Critical Path and the Gantt chart of the process plan and provide costing table for producing 100 units of your selected product.

Verified Expert

Reference no: EM13127602

Questions Cloud

What about a season ski pass to a downhill ski resort : When a company sells a product for cash, it generally recognizes the revenue. However, there are situations when it is not always clear when a company should recognize the revenue. How do you handle season tickets to an NFL or NBA game? What about..
Calculate total expected number of tests necessary : Assume the probability that a person has the desease is 0.1 for all people, independently of each other. Compute the total expected number of tests necessary.
Discuss the different ways client-professional relationship : How could you, as the professional, ensure a smooth transition or ending for your client? What techniques would you use?
Explian were there more frauds or just more discovered : Was there something about this particular time period that lead to the discovery of so many frauds? Were there more frauds, or just more discovered? In either case, why did it happen?
Different process planning techniques : Evaluate the use of three different process planning techniques and produce a production schedule from a process plan
What would be the value of the change in concentration : What would be the value of the change in concentration of C10H12/change in time during the same period of time? Explain why a catalyst for a forward reaction must also be a catalyst for the reverse reaction. Include an energy level diagram
Use visual display to categorical variable-classification : Use a visual display to a categorical variable with four classifications. Which one would you use - the bar chart, the pie chart, or the pareto diagram? Explain"
Explain how could we resolve it : Isn't there a conflict in looking for fraud on the part of the folks who pay you? If there is a conflict, explain how could we resolve it (be imaginative)? If there is not a conflict, why not?
What is the list of the most popular functional currencies : What is the list of the most popular functional currencies and what are the functional currency percentages?

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd