Develope mrp planning schedule

Assignment Help Operation Management
Reference no: EM13228962

Product A is and end item and is made from 2 units of B and four of C. B is made of 3 units of D and two of E. C is made of two units of F and two of E. A has a lead time of 1 week. B,c, and E have lead times of two weeks, and D and F have lead times of 3 weeks. a. show the Bill of Materials (product structure tree) b. if 100 units of A are required in week 10, develope MRP planning schedule, specifying when items are to be ordered and received. There are currently no units of inventory on hand.

Reference no: EM13228962

Questions Cloud

Define the rate constant for the reaction : The rate constant for the reaction 2A ? 2B + C is 1.72 M -1min-1. Find the time, in seconds, needed to decrease the concentration of A from2.45 M to 1.22 M.
What is the maximum temperature the device : A GaAs device is doped with a donor concentration of 3e^15/cm^3 . For the device to operate properly, the intrinsic carrier concentration must remain less than 5% of the total electron concentration
What elements are needed to make them successful : Discuss why variable pay-for-performance plans have become popular and what elements are needed to make them successful.
Compute the ph after the volumes of titrant : Consider the titration of 30.0 mL of 0.035 M NH3 with 0.030 M HCl. Calculate the pH after the following volumes of titrant have been added.
Develope mrp planning schedule : develope MRP planning schedule, specifying when items are to be ordered and received. There are currently no units of inventory on hand.
How much gain in decibels will be required of the amplifier : a sound distribution system has the following outputs 10 watts at 8ohms,5watts at 4 ohms, 15 watts at 16 ohms and 2 watts at 4 ohms if the input to the amplifier is 20 millivolts at 600 ohms how much gain in decibels will be required of the amplif..
What is the hourly production rate of the current process : What is the hourly production rate of the current process Customer demand is 90 units per hour. What does the cycle time need to be to be able to meet demand (what is the takt time)?
Give the impulse responses of lti systems : Impulse Responses of LTI systems can be physically found by inputting \(x[n] = \delta[n]\)to the system and measuring the output. Assume that during the process, we inadvertently input\(x[n] = \delta[n] + \delta[n-1]\)
Explain what is the concentration of urea in the solution : The decomposition of urea in 0.1 M HCl is first order in urea and first order overall. When [urea] = 0.200 M , the rate at 61.0 °C is 8.56 x 10-5 M/s. What is the concentration of urea in this solution after 4751 s if the starting concentration is..

Reviews

Write a Review

Operation Management Questions & Answers

  Description of linear programming

The dean of the Western College of Business must plan school's course offerings for the fall semester. Student demands make it necessary to offer at least 30 undergraduate and 20 graduate courses in the term.

  The probability mass function should be written as a table

The probability mass function should be written as a table with the first column representing the possible values of the random variable and the second column representing the

  Legacy systems and improvements

"Legacy Systems and Improvements" Please respond to the following, From the e-Activity, discuss the challenges legacy systems pose for enterprise system integration.

  How many units should r c

The holding cost is 10 percent of the purchase cost. How many units should R. C. order to minimize his total annual inventory cost?

  Define scalability

A key factor that affects technology decisions is scalability. Define scalability. Explain the difference between high scalability, infinite scalability, and low scalability.

  A recent trend among mnes is to replace expatriates

A recent trend among MNEs is to replace expatriates in foreign subsidiaries with local managers. What are the implications of that policy from the standpoints of

  Operations planning is to specify the optimal combination

The main purpose of aggregate operations planning is to specify the optimal combination of which of the following?

  Differentiate between a long hedge and a short hedge

Differentiate between a long hedge and a short hedge. What are long hedgers and short hedgers seeking to achieve.

  What is the maximum effective capacity of the system

What is the maximum effective capacity of the system in number of passengers per hour?

  What challenges have managers faced in terms of managing

What challenges have managers faced in terms of managing human resoucres? How do managers at some technology companies recruit experienced hires?

  Estimate the least squares regression line

Determine the least squares regression line using Excel. Determine the MSE for the trend line (in a) and the 3 month moving average (in c.) Which forecasting method is better? Explain.

  Illustrate what is most significant event in evolution

Elucidate how has structure of today's organization changed from organization of past. Illustrate what is most significant event in evolution of organizational structure. Defend your response.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd