Develop the work breakdown structure

Assignment Help Business Management
Reference no: EM131382323

Assignemnt: Work Breakdown Structure

According to the PMBOK Guide, "the WBS is a deliverable-oriented hierarchical decomposition of the work to be executed by the project team, to accomplish the project objectives and create the required deliverables." In other words, it lists the project's deliverables and work packages. For this week, you will create a work breakdown structure (WBS) for the project you selected.

Remember that the WBS starts with your major deliverables (that you stated in your scope management plan) at the highest level. The lower levels have the work package required to complete those deliverables. Review the textbook (and the PMBOK Guide, if you have it) for some suggestions on how to create a WBS. From your work breakdown structure, develop a project task list with dependencies and add durations, using MS Project.

Develop the Work Breakdown Structure

• Your WBS should have a minimum of 100-150 line items in MS Project and be three levels deep.
• Make sure to use verb-object task names (for example, "Develop software").
• Enter tasks in MS Project.
• Create the predecessor relationships.
• DO NOT LINK SUMMARY TASKS OR ASSIGN RESOURCES!

Deliverables:

• Statement of Participation and status update
• The MS Project file (.mpp) saved from the Tracking Gantt chart screen.

Attachment:- Attachments.rar

Reference no: EM131382323

Questions Cloud

What could have been done to prevent the chronic condition : What could have been done to prevent the chronic condition? Knowing what you do about different approaches to medicine (traditional and CAM), what practice would you suggest? Would it be a combination of the two? Provide specific details
Write a program that will calculate the euler buckling load : Write a program that will calculate the Euler buckling load for a given column and check whether Euler's formula is applicable.
Design a square or rectangular : Design a square or rectangular (2-in. nominal increments) pinconnected southern pine column (S4S). The unbraced length of the column is 16 ft.
How much more cereal do you expect to be in the large bowl : The amount of cereal the manufacturer puts in the boxes is a random variable with a mean of 16.3 ounces and a standard deviation of 0.2 ounces. Find the expected amount of cereal left in the box and the standard deviation.
Develop the work breakdown structure : Develop the Work Breakdown Structure. Your WBS should have a minimum of 100-150 line items in MS Project and be three levels deep. Make sure to use verb-object task names (for example, "Develop software").
Design square or rectangular pinconnected southern pine : Design a square or rectangular (2-in. nominal increments) pinconnected southern pine column (S4S). The unbraced length of the column is 16 ft.
Find the expected amount of cereal left in the box : The amount of cereal the manufacturer puts in the boxes is a random variable with a mean of 16.3 ounces and a standard deviation of 0.2 ounces. Find the expected amount of cereal left in the box and the standard deviation.
What drug do you feel has been abused : From your signs/symptom chart and the question above answer the following: What drug do you feel has been abused? Why do you feel it is this drug
Design a square pin connected douglas fir column : Design a square pin-connected Douglas fir column (S4S) to support an axial compressive load of 90,000 lb. The unbraced length of the column is 18 ft.

Reviews

Write a Review

Business Management Questions & Answers

  Caselet on michael porter’s value chain management

The assignment in management is a two part assignment dealing 1.Theory of function of management. 2. Operations and Controlling.

  Mountain man brewing company

Mountain Man Brewing, a family owned business where Chris Prangel, the son of the president joins. Due to increase in the preference for light beer drinkers, Chris Prangel wants to introduce light beer version in Mountain Man. An analysis into the la..

  Mountain man brewing company

Mountain Man Brewing, a family owned business where Chris Prangel, the son of the president joins. An analysis into the launch of Mountain Man Light over the present Mountain Man Lager.

  Analysis of the case using the doing ethics technique

Analysis of the case using the Doing Ethics Technique (DET). Analysis of the ethical issue(s) from the perspective of an ICT professional, using the ACS Code of  Conduct and properly relating clauses from the ACS Code of Conduct to the ethical issue.

  Affiliations and partnerships

Affiliations and partnerships are frequently used to reach a larger local audience? Which options stand to avail for the Hotel manager and what problems do these pose.

  Innovation-friendly regulations

What influence (if any) can organizations exercise to encourage ‘innovation-friendly' regulations?

  Effect of regional and corporate cultural issues

Present your findings as a group powerpoint with an audio file. In addition individually write up your own conclusions as to the effects of regional cultural issues on the corporate organisational culture of this multinational company as it conducts ..

  Structure of business plan

This assignment shows a structure of business plan. The task is to write a business plane about a Diet Shop.

  Identify the purposes of different types of organisations

Identify the purposes of different types of organisations.

  Entrepreneur case study for analysis

Entrepreneur Case Study for Analysis. Analyze Robin Wolaner's suitability to be an entrepreneur

  Forecasting and business analysis

This problem requires you to apply your cross-sectional analysis skills to a real cross-sectional data set with the goal of answering a specific research question.

  Educational instructional leadership

Prepare a major handout on the key principles of instructional leadership

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd