Develop prediction interval and confidence interval

Assignment Help Operation Research
Reference no: EM13247009

A company that has distribution rights to home video sales of previously released movies would like to estimate the number of units that it can be expected to Sell. Data are available for 29 movies that indicate the box office gross (in millions of dollars) and the number of units sold (in thousands) of home videos. alpha=.01

x=Box Office Gross (millions) 1.10, 1.13, 1.18, 1.25, 1.44, 1.53, 1.53, 1.69, 1.74, 1.77, 2.42, 5.34, 5.70, 6.43, 8.59, 9.36, 9.89, 12.66, 15.35, 17.55, 17.91, 18.25, 23.13, 27.62, 37.09, 40.73, 46.62, 54.70, 58.51

y-Home videos sold (thousands) 57.18, 26.17, 92.79, 61.60, 46.50,85.06, 103.52, 30.88, 49.29, 24.14, 115.31, 87.04, 128.45, 126.64, 107.28, 190.80, 121.57, 183.30, 204.72, 112.47, 162.95, 109.20, 280.79, 229.51, 277.68, 226.73, 218.64, 286.31, 254.58

Format report as follows and label each section as instructed:

1. Label: Problem Definition

2. Label: Scatterplot-Scatterplot with description of relationship between x and y, positive or negative? neither?

3. Label:Correlation Coefficient-Hypothesis test of correlation coefficient for Home Video Units sold and Box office gross-use 6 step process.

4. Label:Regression Equation (show only the equation, not the entire table or output) Define regression coefficients b0 and b1

5. Label: Significance Testing (Regression Coefficient)-T-test for significance of regression coefficient. Use six step process. In interpretation step discuss average amount of change in y for one unit change in x.

6. Label:Significance Testing (ANOVA) F-test to test R-Sqd - Use 6 step process and in interpretation step discuss percentage of variability in y explained by x.

7. Label:Satisfying regression assumptions-Include plots with descriptions in report: NP Plot for residuals-address assumptions; Residuals vs. Fits-description addressing assumptions; Residuals and x variable-graph with description addressing assumptions

8. Label:Confidence Interval for Regression Coefficient-Develop confidence interval for regression coefficient and interpret-Calculations to be done by hand and typed neatly into report. Discuss whether 0 lies in interval and interpret interval using partial regression terminology.

9. Label:Prediction and Confidence interval for fit value of y - develop prediction interval and confidence interval for y for the value of x you select. Interpret both intervals as they relate to y.

Reference no: EM13247009

Questions Cloud

Calculate ni and the concentration of electrons and holes : An unknown semiconductor has Eg = 1.1 eV and Nc = Nv. It is doped with 10^15 cm^-3 donors where the donor level is 0.2 eV below Ec. Given that Ef is 0.25 eV below Ec, calculate ni and the concentration of electrons and holes in the semiconductor ..
Find the potential of the plate on the left : Two infinite, parallel, uniformly charged plates with charge densities +sigma and +3sigma are separated by a distance L, what is the potential of the plate on the left
Find the total electric potential energy of this model : A useful model of a water molecule is sketched in the figure below, with point charges of 5.2 10-20 C at the H sites, What is the total electric potential energy of this model of a water molecule
Determine the weight of the astronaut : an astronaut weighs 1000N on the surface of the earth(radius = 6.38*10^6m) what is the weight of the astronaut at the elevation of 620 km above the earth's surface
Develop prediction interval and confidence interval : Develop prediction interval and confidence interval for y for the value of x you select. Interpret both intervals as they relate to y.
Determine minimum required bandwidth and baud rate : For a 128-PSK modulator with an input data rate equal to 56 Mbps and a carrier frequency of 100 MHz, determine (a) minimum required bandwidth and (b) baud rate.
Determine the value required for any pre-scaling : A PWM is used in 8-bit mode to produce a signal with a 1 msec period and 60% duty cycle. Determine the value required for any pre-scaling, and the values for the period, and duty cycle registers. The E-clock is 24 MHz.
Which is preferred if the target lifetime of the system : (Probability of negative lifetime is negligible) Lifetime of chip 2 is also a Gaussian RV with mean 22,000 and standard deviation 1000 hours. Which is preferred if the target lifetime of the system is (i) 20,000 hours and (ii) 24,000 hours
Express h in standard form for drawing a bode plot : Plot the Bode straight-line approximation phase plot (i.e., f(f) vs. f) for the transfer function over the range f = 10 rad/s to f = 100 krad/s using the 4-cycle semi-log graph paper provided. Label all slopes in degrees/dec and all levels in degr..

Reviews

Write a Review

Operation Research Questions & Answers

  Middle of tanzania two internet routers with routing tables

Somewhere in the middle of the Tanzania are two Internet routers with messed up routing tables. The two routers keep sending their packets back and forth to each other, nonstop. Will an error message ever be generated from this action? If so, who..

  Cost of capital to assess its restaurant capital investments

Considering investing in Facial Laboratories. Assume that Facial is currently undergoing expansion and is not expected to modify its cash dividend while expanding for the next four years.

  What is the resulting total profit

Formulate a linear programming model for this problem and use the graphical method to solve this model. What is the resulting total profit?

  The case international coal

Write a report on International Coal

  Discuss the implications of service outsourcing on employees

Discuss the implications of service outsourcing on employees, stockholders, consumers and host country economy when a company outsource a call center oversees.

  Summarize research on effectively assessing team performance

Discuss the evaluation of teams within an organization in which you address the following: Summarize research on effectively assessing team performance.

  Analyze the code of ethics

Choose a Code of Ethics from your area of interest in your present work or future career and summarize this code and analyze the Code of Ethics you have chosen to determine what you think are its strengths and weaknesses. Explain why for both

  Project specification and plan

The Project Specification is a description of what you are working to achieve, and a Plan is the schedule proposed to achieve it

  Illustrate what communication channels would be appropriate

Illustrate what communication channels would be appropriate and explain why? Illustrate what are some considerations that you must keep in mind given the diversity of the audience?

  Explain the decision dave has to make

Case “A Manager’s Dilemma: Who Gets the Project?” Students will respond to the following: Explain the decision Dave has to make.

  Minimum total time required to finish the jobs

Each mechanic should be assigned to just one of these jobs. What is the minimum total time required to finish the four jobs? Who should be assigned to each job?

  Explain how are those discernments handled-controlled

holding 30% of deal for 4 years at 5% meaning roughly $1,120,000 will be divided, illustrate what should the expected tax impact be and explain how are those discernments handled/controlled?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd