Develop an it project management framework

Assignment Help Software Engineering
Reference no: EM133670453

Project Management

Assessment - Case-based Response

Learning Outcome 1: Develop an IT project management framework that integrates security analysis and risk mitigation throughout the project's lifecycle.

Learning Outcome 2: Critically appraise, analyse, refine and document system requirements to solve real-time problems in software or cybersecurity systems.

Purpose The purpose of this assessment is to measure your ability to analyse a case study for project constraints for the project specifics. This assessment will measure your ability to:
Demonstrate understanding of the concept of IT projects.
Demonstrate understanding of the theory and interdependencies behind the time quality cost triangle.
Demonstrate understanding of the role of project manager and the specific requirements of the case study.
Write and reference to an academic standard.

Specific Instructions To complete the assessment, you will write 1500 words addressing three questions. Key tip: students who excel in this assessment are able to demonstrate an understanding of the project management theory taught in the subject and can connect this to the specific aspects of the case study.
Students can reference the theory covered in the subject as well as the information outlined in the case study description. You do not need to source additional external references. If you choose to do so, please ensure your reference connects specifically to what you are discussing or quoting.
You must complete this individually. Do not collaborate or share your work with another student.


Format This assignment should be written in a neat, professional, and engaging manner using report format, meaning that you need to develop coherent, well-supported and logical arguments following a basic report structure.


Case Study

Background:
ABC Biopharmaceuticals Ltd. is a manufacturing company that specializes in in vitro diagnostic rapid test kits. The company supplies antibody, rapid antigen, PCR, and fast PCR COVID-19 tests, and also offers tests for dengue, influenza, syphilis, and hepatitis A, B, and C. The company currently has an inventory system that is outdated and inefficient. The company has contracted a consultant to upgrade the inventory management system of the company. This project aims to improve operational efficiency, reduce costs, and ensure regulatory compliance. By implementing an advanced inventory management system, the company can enhance inventory control, streamline procurement processes, minimize stockouts, and optimize inventory levels. This project will focus on designing a customized inventory management solution tailored to the specific needs of the biopharmaceutical industry. The team at ABC Biopharmaceuticals Ltd. cannot agree on the best methodology for building this

system. The managers at ABC Biopharmaceuticals Ltd. want to make sure the advanced inventory management system is performing as expected after the upgrade. Managers from the finance team also want to ensure there are no cost overruns.
You are the consultant in this case, review the case study above and provide a written response to the following.

Questions

Provide a short explanation to the board outlining the characteristics of projects and how projects differ from business as usual (5 marks).
Evaluate the time-quality-cost triangle for this project and explore how adjusting one arm of the triangle (time, quality or cost) would impact the other arms of the triangle and the overall project (15 marks).
Evaluate and reason which project management strategy you believe should be applied to this project (20 marks). Your response should include:
an assessment of each project management methodology covered in this subject and its suitability to the specific requirements of the project.
your recommendation on the project management methodology you believe would best suit.
your reasons why you believe this to be the best approach.
There are risks with any methodology and, as the project manager, you understand this. Outline some of the key risks with your preferred project management methodology. Ensure the risks you identify are connected to the specific requirements of this project (10 marks).

Research and references
Please use APA 7th edition as your referencing style. For more information, see the Academic Referencing Tool of the Library.

Reference no: EM133670453

Questions Cloud

How the condition is diagnosed monitored and treated : The incidence and prevalence of this condition in the US. How the condition is diagnosed, monitored, and treated in individuals with this condition?
Review of the pharmacological agents used for treatment : Review of the pharmacological agents used for treatment and important information related to advanced practice nurse.
Write a persuasive essay : Write a persuasive essay. Another way to say that is find something you would like fixed and then convince those who can fix it that it in their best interest.
Define intimate partner violence : Define intimate partner violence and its prevalence within families in the United States.
Develop an it project management framework : CSE3PM Project Management, La Trobe University - Critically appraise, analyse, refine and document system requirements to solve real-time problems in software
Creation of social welfare programs and policies : What two conflicting things impact the creation of social welfare programs and policies?
Three responsibilities of sick role behavior : Are the three rights and three responsibilities of sick role behavior easily and always realized? Why or why not? Are these concepts realized in your life?
What is compulsory sexuality : What is compulsory sexuality and how does it impact both asexual and sexual people?
What the author is saying about null hypothesis testing : What the author is saying about null hypothesis testing, given how much time we spend on hypothesis testing in psychology statistics courses.

Reviews

Write a Review

Software Engineering Questions & Answers

  Research report on software design

Write a Research Report on software design and answer diffrent type of questions related to design. Report contain diffrent basic questions related to software design.

  A case study in c to java conversion and extensibility

A Case Study in C to Java Conversion and Extensibility

  Create a structural model

Structural modeling is a different view of the same system that you analyzed from a functional perspective. This model shows how data is organized within the system.

  Write an report on a significant software security

Write an report on a significant software security

  Development of a small software system

Analysis, design and development of a small software system.

  Systems analysis and design requirements

Systems Analysis and Design requirements

  Create a complete limited entry decision table

Create a complete limited entry decision table

  Explain flow boundaries map

Explain flow boundaries map the dfd into a software architecture using transform mapping.

  Frame diagrams

Prepare a frame diagram for the software systems.

  Identified systems and elements of the sap system

Identify computing devices, which could be used to support Your Improved Process

  Design a wireframe prototype

Design a wireframe prototype to meet the needs of the personas and requirements.

  Explain the characteristics of visual studio 2005

Explain the characteristics of Visual Studio 2005.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd