Develop a work breakdown structure for your project

Assignment Help Other Subject
Reference no: EM132350053

Assignment Report

Objectives:
The assignment's overall objective is that the students should acquire an overview of principles, methods and techniques of systems development, and gather experience from a development project in which a specific development method is used. On successful completion of this assignment students should be able to:

  • Define and explain the fundamental concepts methods and techniques used in information systems analysis and design.
  • Apply contemporary information systems analysis and design methods and techniques to real-world case studies.
  • Apply systems analysis and design concepts, modelling and project management techniques to real-world case studies.
  • Effectively communicate systems analysis and design methods and techniques to real world problems.

Students are expected to identify their "real-world" organisation. If some students do not have access to a "real-world" organisation, a fictitious organisation based on a real world organisation will be acceptable.

Finding a "real-world" organisation:

If you are linked to an organisation (government or private organisation for an example) ask what the need for improving the performance level or the process flow (for example; sales, order, or payment process), choose the highest priority and work around that.

Do you have any family or friends involved in the business organisation, or do you know anyone with a business organisation? Ask them about the performance level or the process flow type that they need (keep it simple).

Otherwise, do you have any friends with ideas for a business organisation? What would be the major performance level or the process flow type that they need for this organisation?

Do not try to solve all the problems for the organisation in the few weeks you have and just focus on one problem.

TASK 1: Organisation Background
Briefly introduce your chosen organisation in terms of name, the industry it operates within, products and services, clients, major competitors and competing for products/services, major processes, ownership, key personnel and key issues/challenges.

TASK 2: Time Management Plan
Students are required to provide an effective time management plan that will lead to successful implementation of your project.

TASK 2.1: Work Breakdown Structure
Develop a work breakdown structure (WBS) for your project with date, and summary of project activities. Use a table with columns for activity number, start date, finish date, activity name, activity description, planned action, status, and any other notes. The purpose of WBS is to identify each task in your project and include an estimated duration.

TASK 2.2: Task-Sequencing Approaches
After work breakdown structure (WBS) has been designed, students need to present the project details that are mentioned in the WBS using the following Task-Sequencing Approaches:

PERT Chart
Gantt Chart

TASK 3: Fact-Finding
Develop a fact-finding for planning and analysis in order to determine improvements in organisational processes. This fact-finding plan should include; interviews, documentation review, observation, questionnaires, and research.

TASK 4: Organisation Chart
Review and draw the organisation chart for your chosen organisation. Then, list the individuals (working at various levels of organisational structure) and their roles for those who you would like to interview. Prepare a list of objectives for each of the interviews you will conduct.

TASK 5: "AS IS" Process
Provide an "AS IS" process diagram by using Business Process Modelling Notation (BPMN) or Unified Modelling Language (UML) notation. The "AS IS" diagram should explain the process flow of your chosen organisation. Then, explain which process flow in this diagram that you want to improve.

TASK 6: Report to Top Management
Assume you have completed the planning and analysis phases of your project for your chosen organisation. Write a report to the top management (CEO). This report at a minimum should include the objectives, background, processes undertaken, scope, and recommendations to the top management (CEO).

TASK 7: Presentation/Report Structure
This task includes providing a cover page (title page) for your report and writing up your report details with clarity and professionalism.

TASK 8: References
All documents cited in your assignment must list in a single alphabetical list at the end of the assignment.

Reference no: EM132350053

Questions Cloud

Between big corporation and sun corporation : Between Big Corporation and Sun Corporation who had the risk of loss for this destroyed generator?
What is the accounts receivable turnover : Based on the following data, what is the accounts receivable turnover? Cost of merchandise sold during year 270,000 and Inventory, end of year 110,000
How did you feel after you practiced mindfulness : Often, because of its philosophical roots in Buddhism, practitioners and scholars equate mindfulness with "New Age" beliefs. As a result, some may wonder how.
All the conversation was over phonem : Company-A (Supplier) : contacted Company-B (Buyer) for a Sale of ~1000 food-packets with 10% discount in price
Develop a work breakdown structure for your project : Develop a work breakdown structure for your project with date, and summary of project activities - Develop a fact-finding for planning and analysis
Is there consideration for the promise of c : (a) Is there consideration for the promise of C not the sure for one year? (b) Could the written promise not to sue be subject to any other argument for enforc
Communicating policy analysis : Propose how written and oral communication should be used to ensure public policy analyses are promoted and accepted by the general public.
Briefly discuss the different control strategies : Discuss the difference between risks and threats. Briefly discuss the different control strategies. Define control
Promised to buy the instrument : Siros owned a "Guarnerius," a rare violin made by Guarneri in 1705. He entered into a contract whereby he promised to sell, and Lister promised to buy

Reviews

len2350053

8/1/2019 12:43:44 AM

Organisation Chart Review and draw the organisation chart for your chosen organisation. Excellent meets all the requirements 8-10 Good work (minor issue) 5-7 Requires more work 1-4

len2350053

8/1/2019 12:43:36 AM

Fact-Finding Provide comprehensive develop a fact-finding plan which fully reflect the requirements of the case of your chosen organisation. Excellent meets all the requirements 16-20 Good work (minor issue) 11-15 Requires more work 6-10 Very poor effort 1-5

len2350053

8/1/2019 12:43:26 AM

Task-Sequencing Approaches Selection of the task-sequencing approach and the justification provided for this selection. Demonstrate an understanding of the project activities; and able to identify the priorities in the selected approach. Excellent meets all the requirements 8-10 Good work (minor issue) 5-7 Requires more work 1-4

len2350053

8/1/2019 12:43:16 AM

Work Breakdown Structure (WBS) Professional design of WBS, and present all the relevant details at high level to complete your assignment. Excellent meets all the requirements 3-5 Requires more work 1-2 Not attempted 0 /5

len2350053

8/1/2019 12:43:05 AM

Organisation Background Clarity of the introduction to the organisation selected for assignments in this course in terms of name, the industry it operates within, products and services, clients, suppliers, major competitors and competing products/services, major processes. Excellent meets all the requirements 3-5 Requires more work 1-2 Not attempted 0

len2350053

8/1/2019 12:42:48 AM

Introduction Clarity of the introduction to the organisation selected for assignments in this course. This assignment introduction usually includes the following: Selected organisation background What is the assignment is about? Outline the rest parts of this assignment Time Management Plan Students are required to provide an effective time management plan that will lead to successful submission of your assignment 1 (Report), and the completion of the required activities that included in this assignment. This time management plan including the following: Work Breakdown Structure (WBS): Professional design of WBS, and present all the relevant details at a high level to complete assignment 1. Task-Sequencing Approaches: Selection of the task-sequencing approach and the justification provided for this selection. Demonstrate an understanding of the project activities; and able to identify the priorities in the selected approach.

len2350053

8/1/2019 12:42:41 AM

Abstract is one of the important parts of reports, research papers, and academic assignments. The abstract is often the last item that you write, but the first thing people read when they want to have a quick overview of the whole paper. I suggest you leave writing the abstract to the end because you will have a clearer picture of all of your work. A good abstract should has one well-developed paragraph that is coherent and concise, and is able to stand alone as a unit of information covers all the essential academic elements of the full-length paper, namely the background, purpose, focus, methods, results and conclusions contains no information not included in the paper. Table of Contents The table of contents usually includes the titles of the first-level headers, and often includes second-level or section titles (A-heads), and occasionally even third-level titles (subsections or B-heads).

Write a Review

Other Subject Questions & Answers

  Cross-cultural opportunities and conflicts in canada

Short Paper on Cross-cultural Opportunities and Conflicts in Canada.

  Sociology theory questions

Sociology are very fundamental in nature. Role strain and role constraint speak about the duties and responsibilities of the roles of people in society or in a group. A short theory about Darwin and Moths is also answered.

  A book review on unfaithful angels

This review will help the reader understand the social work profession through different concepts giving the glimpse of why the social work profession might have drifted away from its original purpose of serving the poor.

  Disorder paper: schizophrenia

Schizophrenia does not really have just one single cause. It is a possibility that this disorder could be inherited but not all doctors are sure.

  Individual assignment: two models handout and rubric

Individual Assignment : Two Models Handout and Rubric,    This paper will allow you to understand and evaluate two vastly different organizational models and to effectively communicate their differences.

  Developing strategic intent for toyota

The following report includes the description about the organization, its strategies, industry analysis in which it operates and its position in the industry.

  Gasoline powered passenger vehicles

In this study, we examine how gasoline price volatility and income of the consumers impacts consumer's demand for gasoline.

  An aspect of poverty in canada

Economics thesis undergrad 4th year paper to write. it should be about 22 pages in length, literature review, economic analysis and then data or cost benefit analysis.

  Ngn customer satisfaction qos indicator for 3g services

The paper aims to highlight the global trends in countries and regions where 3G has already been introduced and propose an implementation plan to the telecom operators of developing countries.

  Prepare a power point presentation

Prepare the power point presentation for the case: Santa Fe Independent School District

  Information literacy is important in this environment

Information literacy is critically important in this contemporary environment

  Associative property of multiplication

Write a definition for associative property of multiplication.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd