Develop a work break down structure for project scheduling

Assignment Help Other Engineering
Reference no: EM131875076

Engineering Project Management and Lean Methodology Assessment

Project CASE STUDY: Chinese OEM Reduces Returns with Improved Product Testing

For original equipment manufacturers (OEMs) supplying the automotive industry, a product can be returned well before the car it's in reaches the end customer. A key metric suppliers often use in tracking the performance of their products is therefore the number of defective parts per million (ppm) occurring while the car still has 0 kilometers (km) on the odometer.

When Continental Automotive Systems, Tianjin, China, began producing an electronic component known as the silver box for a General Motors subsidiary, the 0 km return goal was less than 100 ppm; the actual return rate, however, was 1,200 ppm.

Company personnel launched a Six Sigma improvement project to make process improvements that would achieve the 100 ppm goal within a year.

Questions -

Question 1: A. As a project manager of 'GM Holden 0 km Return Reduction' project, develop an activity sheet by using the following table:

B. As a project manager of 'GM Holden 0 km Return Reduction' project, develop a Work break down structure (WBS) for project scheduling from activity sheet by using bottom up approach.

C. As a project manager of 'GM Holden 0 km Return Reduction' project, develop Gantt chart for the project.

Question 2: As a project manager of 'GM Holden 0 km Return Reduction' project, develop Network diagram by using Activity Sheet, WBS and Gantt chart, as developed in Question 1.

Question 3: As a project manager of 'GM Holden 0 km Return Reduction' project, , run Critical Path Method (CPM) analysis tool on network diagram(of Q4) to find

A. Each activity duration (D), earliest start (ED), earliest finish (EF), latest start (LS), latest finish (LF) and slack time (S).

B. As a project manager of 'GM Holden 0 km Return Reduction' project, determine Critical path of the project.

Question 4: A. As a project manager of 'GM Holden 0 km Return Reduction' project, identify potential risks that may occur in this project. (At least five risks need to be identified)

B. By using the following matrix grids, evaluate the identified risks in 'GM Holden 0 km Return Reduction' project.

Rating for likelihood and seriousness for each risk

L

Rated as low

E

Rated as extreme (used for seriousness only)

M

Rated as medium

NA

Not assessed

N

Rated as high

 

 

 

Grade: Combined effect of likelihood/seriousness

 

Seriousness

Likelihood

 

Low

Medium

High

Extreme

Low

E

D

C

A

Medium

D

C

B

A

High

C

B

A

A

C. As a project manager of 'GM Holden 0 km Return Reduction' project, develop and apply risk mitigation strategies and monitor their impact. (Use following strategies and their impact tables)

Recommended actions for grades of risk

Grade

Risk Actions

A

Actions to reduce the likelihood and seriousness to be identified and implemented as soon as the project commences.

B

Actions to reduce the likelihood and seriousness to be identified and appropriate actions implemented during project execution.

C

Actions to reduce the likelihood and seriousness to be identified and costed for possible action if funds permit.

D

To be noted - no action is needed unless grading increases over time.

E

To be noted - no action is needed unless grading increases over time.

Question 5: A. Explain factors that could affect the reliability of 'silver-box'. Categories factors according to production, assembly and operation.

B. It is sometimes claimed that increasing reliability beyond levels that have been achieved in the past is likely to be uneconomic, due to the costs of the actions that would be necessary. Present the argument against this belief in context of given project case study.

Question 6: As a project manager of 'GM Holden 0 km Return Reduction' project, recommend quality assurance and quality control in terms of the production systems.

Question 7: Evaluate key steps that Continental Corporation should follow while performing quality audit of 'GM Holden 0 km Return Reduction' project.

Question 8: As a part of lesson learned report of the 'GM Holden 0 km Return Reduction' project, make a diagram that should suggest cost of quality to Continental Corporation in the development of their products. It should include:

  • Failure Cost curve
  • Prevention cost curve
  • Cost of quality curve

Question 9: As a project team member of 'GM Holden 0 km Return Reduction' project , compare Pareto chart, Trend chart and Cause and effect (Fishbone) diagram and identify the solutions that should lead to reduction in number of defects of produced parts.

Question 10: A. Identify the various lean methodology approaches that have been implemented in the 'GM Holden 0 km Return Reduction' project.

B. As a project manager of the 'GM Holden 0 km Return Reduction', propose two other lean methodology techniques that can be implemented after the project for further improvement or Kaizen, on the manufacturing process. Justify your answer and indicate the expected improvement.

C. Explain how the Principles of lean can be applied to any part of the whole process in the electronic component production process. Be specific in your discussion.

Question 11: A. Critique on how the 6 Sigma approach has been implemented by the team in the project.

B. As a team member of 'GM Holden 0 km Return Reduction' project, analyse Pareto chart that is identifying defects in various categories of the 'silver box', and suggest a lean strategy to reduce internal and external failure.

C. As a project manager of 'GM Holden 0 km Return Reduction' project, suggest steps for data collection that Continental Corporation needs to follow for effective quality measurement process in the project.

Question 12: A. Identify three challenges the team faced in managing the project and how the team have managed to overcome them.

B. For each of the challenges stated in (A), suggest other alternative approaches that the team could use to overcome the challenges. Explain your answer.

Attachment:- Assignment File.rar

Reference no: EM131875076

Questions Cloud

How the developments changed societys understanding : Identify the developments and how they impact individuals or larger groups/cultures.Describe how the developments changed society's understanding.
What is an audio codec and what is an audio container : What is an audio codec? What is an audio container? Why would an audio element include more than one source element?
Explain the fundamentals of entrepreneurship : Choose a business idea for this Assignment and locate the key types if information you'll need to gather in order to evaluate the potential for the venture.
Explain the behavior of an input element with the email type : Explain the behavior of an input element with the email type. What is the purpose of the placeholder attribute of an input element?
Develop a work break down structure for project scheduling : DME600 Engineering Project Management and Lean Methodology Assessment. Develop a Work break down structure (WBS) for project scheduling from activity sheet
Identify a management problem faced by todays leaders : Summarize the problem and describe the manager's role in resolving this problem in today's health care environment using information from your text.
What is the default size of a text controls text box : What is the default size of a text control's text box? What is the difference between the size and maxlength attributes of input for text controls?
What is the most challenging step in the listening process : What is the most challenging step (not type of listening!) in the listening process and why? How would struggling with this step impact someone's daily life?
What would you do if an employee divulged information : Based on your readings and research, discuss why it is important to "fill in" the gaps in employment when interviewing a candidate.

Reviews

len1875076

2/22/2018 6:52:51 AM

General Instructions for the Students - This open-book Assignment is a part of the final mark of this paper. You must complete this Assignment if you wish to be eligible to pass this paper. Due Date/Time: A hardcopy of your assignment should be handed to your lecturer or to reception before the due date and time specified. If you require an extension (for valid reasons only), you must consult your lecturer before the due date. It is too late after the due date. Late submission and resubmission: If you do not hand in the tasks by the due date & time, you will incur a deduction of 10% of the total awarded marks per week. The assessments will not be accepted after two weeks from the due date. Generally you may not be awarded more than 50% of the total marks for a resubmission, except in the case where a genuine reason is provided.

len1875076

2/22/2018 6:52:45 AM

Submission and assessment writing: All assignment submissions must have a front cover sheet which includes a title, the course code and course name, and Student Name and ID number(s). Completed assessments must be word processed and printed on A4 paper. Handwritten assignments will not be accepted. Word-processed assignments must be typed using 1.5 spacing and font size 12 and have a 1” margin on all sides. Use a consistent format (font and layout) throughout the assignment. Number the pages of your assignment and write the student name and ID number(s) in the footer. Attach a copy of this Assessment to your submission (with the first page duly filled). The final submission must include a completed cover sheet, signed declaration and be stapled. No ring or other types of binding will be accepted.

len1875076

2/22/2018 6:52:39 AM

Assessment Instructions for students - Enter your Student ID number in the space provided above. Write/Type your student ID and the question number on each page. A detailed “Specification Sheet” and “Project Budget” is provided to you in this assessment. You need to carry out project planning, Scheduling, budgeting, resource assignments and risk management by performing analysis as described below.

len1875076

2/22/2018 6:52:32 AM

You need to work either individually or in pair to produce this project schedule using MS PROJECT software. You can use software tools such as MS word, MS Visio and MS project to complete tasks. You can also complete some questions by using hand drawing and writing. Two weeks are allocated to you to complete this task. Your assessment will be done by the tutor during two weeks and will be based on: Participation in the completion of the project, Understanding of the project, Completion of the project. Please go through all questions before attempting the project. It will help you to understand that what performance is required to get maximum marks.

len1875076

2/22/2018 6:52:24 AM

Note: Ms Word can be used to develop work break down structure Develop WBS on the basis of roles and responsibilities of departments involved. Note: At least 8 activities should be identified, planned, scheduled and monitored and Helping note: Ms Word or Hand written methods can be used to develop activity sheet.

Write a Review

Other Engineering Questions & Answers

  The machine will consist of a base or frame

The machine will consist of a base or frame, a rotary actuator (to obtain the 90 degree desired rotation about the x-axis), a linear actuator that will move plates back and forth to obtain the 180 degree axis rotation about the y-axis, and a PLC/HMI ..

  What clock frequency does imply in the given years

Scaling of Wire Delay: Suppose a system has a clock cycle of ten gate delays. What clock frequency does this imply in the years 1990, 2000, and 2010?

  Constant pressure combustion chamber

Saturated liquid butane enters an insulated constant pressure combustion chamber at 25?C, and x times theoretical oxygen gas enters at the same pressure and temperature. The combustion products exit at 3400 K.

  Plot the days to pay off the turbine

Plot the days to pay off the turbine versus the percentage the wind turbine is on. Create functions to: convert from kw to dollars, calculate the amount

  Determine the mass of pressurant

Now, assuming the monoprop system utilizes regulated Helium pressurant (Rgas = 2080 J/kg-K) with a maximum beginning of life operating pressure of 27.6 MPa and temperature of 323K, and corresponding EOL limits of 689 kPa and 293K, respectively, det..

  Understand the pipelining process

CDA3101 Project: Pipeline Simulator - create a program, contained in a single C file called proj2.c, which takes as input a small simplified MIPS assembly program and prints to standard output the state of the pipelined datapath at the beginning of..

  Determine a compensating function

Determine a compensating function Gc(s) such that one of the poles is eliminated. Provide all calculations in detail with explanation

  Question regarding the temperature of the mixture

In a shower, cold water at 10°C flowing at a rate of 5 kg/min is mixed with hot water at 60°C flowing at a rate of 2 kg/min. The exit temperature of the mixture is

  Scientific and electrical engineering principles

It is obvious that you have a top-surface understanding of scientific and electrical engineering principles and a well-developed capacity for technical analysis based on your bachelor degree record. You presented the proficient application technic..

  What negative externality obtaining human food pose for bear

Aggressive bears present a threat to human safety and eventually must be destroyed or removed from the park. Please obey the law and do not allow bears or other wildlife to obtain human food. What negative externality does obtaining human food pos..

  Find the binary and hex values

Find the binary and hex values for the given numbers for an 8-bit system- What is the reason for this erroneous phenomenon? Explain with illustrations.

  The media example of an extraneous variable

Is it a positive or negative correlation? How did you determine this to be the case?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd