Develop a techno-economic analysis

Assignment Help Chemical Engineering
Reference no: EM13943638 , Length: word count:10000

Subject:Chemical Engineering Phd level Software involve (Aspen Plus) around 40 pages (10000 words).

Topic: Waste Wood Biomass and Energy Issues (Wood waste biomass as potential feed stock for power generation: A case study of Nigeria)

Aim:

The main aim of this project is to develop a techno-economic analysis of Thermo chemical processing route for the conversion of wood waste biomass in Nigeria to energy. The bio-energy scenarios will be modelled using Aspen Plus.

Objectives:

(i) To accurately determine of the amounts and locations of wood waste in Nigeria, together with estimation of the fraction available for collection and the cost of collection and transport to suitable central locations

(ii) To carry out comprehensive literature review of literature related to wood waste conversion processes. Existing experimental will also be collected from literature

(iii) To develop a process model of wood waste conversion process using Aspen Plus software

(iv) To validate the process model developed in (iii) using experimental data collected in (ii)

(v) To carry out process and economic analysis using the model developed

(vi) Complete an economic assessment of waste treatment options using the processing model developed

This technological implication could help in gathering such options which would decrease the level of dependence on conventional power generation processes. The development through various biomasses have been tested yet by the scientists. The reason for using the wood waste or the ashes is its potential presence in Nigeria electricity efficiency, the economic feasibility and positive environmental impact it could be providing.

Concerning the amount of wood waste present in Nigeria, it has been found from various studies that about from 1.8 million tonnes per year of saw dust (wood waste) are produced from lumber industries in Nigeria, about 1.3 TWh of electricity can be generated from 1000 MW power plant. Power generation via the utilization of this biomass prove to be a possible path to Nigeria's economic, social and environmental sustainability but the extent to which this can achieved is strongly dependent institutional framework, investment, incentives and information policies.

Reference no: EM13943638

Questions Cloud

Analyse legal issues and relebvant case law : In June 2013, theft happened in company and Dozey got hurt when he try to find some stock back. The company is insolvent and has liquidation due to financial crisis. Analyse legal issues, relebvant case law, legal principles and legal reasons
What bid price should you submit on contract : Consider a project to supply 115 million postage stamps per year to the U.S. Postal Service for the next five years. You have an idle parcel of land available that cost $2,050,000 five years ago; if the land were sold today, it would net you $2,250,0..
Services to three different types of technologies : Asynchronous Transfer Mode (ATM) offers services to three different types of technologies: Constant Bit Rate (CBR), Unspecified Bit Rate (UBR) and Available Bit Rate (ABR). Each technology has its pros/cons when dealing with ATM.
Annual salary through payroll deduction and matches dollar : Kristin Caldwell has just graduated from college and is considering job offers from two companies. Although the salary and insurance benefits are similar, the retirement programs are not. The other firm has a contributory plan that allows employees t..
Develop a techno-economic analysis : Waste Wood Biomass and Energy Issues and develop a techno-economic analysis of Thermo chemical processing route for the conversion of wood waste biomass in Nigeria to energy.
Information and communication technology infrastructure : In this Group Project, assume that you and the members of your group are top managers of a big international company spread over several continents. You decide to rebuild/expand your company's Information and Communication Technology infrastructur..
The discount rate and the time increases-the future value : Other things equal, as the discount rate and the time increases, the future value:
Value chain designs and structures : Task Identify two organisations in an industry of your choice. These organisations must have clearly different value chain designs and structures.
Portfolios should have the most systematic risk : Which one of the following portfolios should have the MOST systematic risk?

Reviews

Write a Review

Chemical Engineering Questions & Answers

  Why a substance heated at a fast rate

Why a substance is being heated at a fast rate the temperature of decomposition

  Design variables necessary for sizing equipment

Assist with the setting of design variables necessary for sizing equipment

  Solve the initial value problem

Use Laplace transformation to solve the initial value problem

  Baffled tank with a six blade turbine agitator

Equal rates of mass transfer for the production of the fine chemical are required. This is often required for certain types of organic synthesis.

  Adsorption and membranes processes

Application of reverse osmosis principles for the desalination of sea water

  Evaluation of a new chemical manufacturing process

Prepare the design and evaluation of a new chemical manufacturing process.

  Adsorption and membrane processes

Adsorption and Membrane Processes

  Draw t-s diagram of the cycle

Draw T-S diagram of the cycle.

  Materials chemistry find potential energy between two atoms

The potential energy between two atoms A and B are constants and r the interatomic separation distance.

  Implications of the future of fabrication for international

Implications of the future of fabrication for international trade, transportation, and logistics

  Evaluate the work done by the gas

The atmospheric pressure of 100k Pa acts on the other side of the piston. The gas is heated until the volume is doubled and the final pressure is 500 kPa. Calculate the work done by the gas.

  Evaluate particle diameter at different gas velocities

Evaluate particle diameter at different terminal gas velocities

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd