Develop a risk assessment analysis

Assignment Help Project Management
Reference no: EM132285597

Risk analysis and mitigation project

Assessment Description

You are a project analyst at a large construction company. You have been asked to develop a risk analysis and mitigation plan for one of the below five projects:

1. Sydney Metro Northwest
2. Cross River Rail, Brisbane
3. Hudson Yards, New York
4. North East Link Melbourne
5. Western Sydney Airport

The project you will analyse will depend on the LAST digit of your student number

o 0 and 1 = Project 1
o 2 and 3 = Project 2
o 4 and 5 = Project 3
o 6 and 7 = Project 4
o 8 and 9 = Project 5

There are three parts to the Analysis

Part A - in which students discuss their allocated project case study (you are allocated one based on your last name) and outline rationale, key features, funding and stakeholders

Part B - in which students develop their risk analysis framework

Part C - in which students identify mitigation measures and proposals for overcoming the risks identified in their case study

There are three parts to the Analysis

Part A: Project Overview

For each student's allocated case study students must be able to identify the following information through their own research:
• The overall budget for the project (real or projected)
• Social and economic rationale: Including benefits and drawbacks for the project
• Key Statistics: Provide key information about the project
o Scope and Size
o Budget and estimated cost
o Time required to complete the project
o Key construction elements or phases (e.g. if you are building a toll road one key element may be the tunnel segment or bridge segment)
o Environmental costs or benefits
• Funding mechanisms: How the project makes money or provide return to its promoters
• Identify the Key Stakeholders in the project
Required word count is between 800-1,000 words.

Part B: Risk Analysis

In this part students develop a risk assessment analysis in which they use both qualitative and quantitative measures to identify potential risks in the project and determine how they should be weighted.

The risk analysis should draw upon principles outlined in the Project Management Body of Knowledge (PMBOK) and material discussed in class in weeks 1 -5.

Students would be expected to produce a risk matrix where the likelihood of potential risks events are mapped against their possible consequences. Other risk assessment and analysis activities might focus on a range of financial measures associated with the project.

Required word count is 600-800 words.

Part C: Risk Mitigation Plan

In this part students will use the information collected and analysed in the previous two parts to develop a risk mitigation plan and strategy. Based on information identified in the risk analysis students will be expected to develop a plan for how they deal with the various identified risks. The mitigation plan should outline which risks need to be address and in what order. The plan should also identify and potential risks that they believe do not require attention.

The plan should then explain how risks might be addressed and by what means. Where possible places should include the reference to time and resource (costs) implications. Students need to take into account commercial considerations when constructing the plan and identify whether the plan is cost effective or has any implementation issues.

Required word count is 800-1000 words.

Attachment:- Risk analysis and mitigation project.rar

Verified Expert

In the current assignment, the project of North East Link Melbourne has been analyzed. The various aspects of the project have been discussed. The risks associated with the project have been identified and suitable mitigation plan has been developed.

Reference no: EM132285597

Questions Cloud

What are the strengths weaknesses opportunities and threats : Case - The sustainable development of the company A. Case Co. What are the strengths, weaknesses, opportunities and threats? Make a SWOT analysis
Capacity planning is important step in strategic planning : Capacity planning is a very important step in strategic planning.
Define how does information assurance applied : In financial industry, how does information assurance applied, in assuring that debit and credit card information and other financial information is protected.
Explain the concept of humanistic management : Explain the concept of humanistic management. Summarize the work of Mary Parker Follett and Elton Mayo.
Develop a risk assessment analysis : MBA643 - project analyst at a large construction company. You have been asked to develop a risk analysis and mitigation plan for one of the five projects
Ethical responsibilities do business communicators : What legal and ethical responsibilities do business communicators have? Do audiences also have responsibilities? If so, what are they?
What is the difference between fraud and misconduct : What is the difference between Fraud and Misconduct? Must have a source where the answer was found.
Really anything about building website : The trouble is that you don’t know anything about creating, hosting, maintaining, the cost, or really anything about building a Website.
Relational database schema design : Build a searching interface that has term form to browse RNA/DNA sequence/FASTA sequence - create an interface that allows the user to interrogate it

Reviews

len2285597

4/16/2019 11:58:47 PM

Part B: Risk Mitigation Plan Formulate a risk mitigation plan by justifying which risks need to be addressed and how i) Risk Evaluation Justify which project risks needs to be addressed, how they need to be addressed and in what order with reference to time and resource cost implications. Distinguish risks which do not need to be addressed. 5 marks Formulate a risk mitigation strategy based on Parts A and B and critique the plan with reference to commercial considerations and cost effectiveness. 4 marks

len2285597

4/16/2019 11:58:36 PM

iii) Funding Mechanisms Analyse the funding mechanism of the project - i.e how does the project make money or derive social benefit to provide return to its promoters 2 marks iv) Key Stakeholders Identify the key stakeholders 1 mark Part B: Risk Analysis Integrate qualitative and quantitative risk measures, with reference to theory, in order to identify and evaluate potential risks to the project i) Potential Risks Identify potential risk using both qualitative and quantitative risk measures with reference to PMBOK principles 4 marks ii) Risk Matrix Construct a risk matrix and assess the likelihood of potential risks as well as their consequences with reference to financial measures 5 marks

len2285597

4/16/2019 11:58:20 PM

Part A: Project Overview Outline key features of the project based on research and interpretation of real-world data and information Criteria Requirement Marks Available i) Overall Budget Summarise the social and economic rationale (including benefits and drawbacks) for the project 2 marks ii) Key Statistics a) Describe project scope with reference to what is being built and provide technical image/map if appropriate b) Outline the budget and estimated cost c) Estimate the time required to complete the project - time line may be provided if available d) Identify the key construction elements or phases (e.g. if you are building a toll road one key element may be the tunnel segment or bridge segment) e) environmental 5 marks

Write a Review

Project Management Questions & Answers

  Discuss at least four of the key decisions made

Identify a project that you worked on in the past (or research one online) and discuss at least four of the key decisions made during the pre-initiating.

  Create a product launch comprehensive strategy

Create a Product Launch Comprehensive Strategy and Professional Reflection to demonstrate proficiency in all areas of operations and project management.

  Where does your organization keep such information

Class what do you do with all of the information you collect at close out in your organization? Where do you go if you want to read about previous projects? Where does your organization keep such information.

  Success fo the team project

Determine the effectiveness of the contribution to the success fo the team project - Reasons for team projects

  Evaluate and discuss airport operator

APA format required responses are 750 words per questionwith in text citations and Reference Page 1 - Evaluate and discuss airport operator and AirportSecurity Coordinator (ASC) security responsibilities.

  File of n samples generated by a matlab program

Develop a postprocessor that has as input a file of N samples generated by a MATLAB program.- The postprocessor is to be menu driven and is to generate a histogram.

  What types of things would you need to do well

As a project manager, what types of things would you need to do well in order for your project to work within a matrix organization? Justify your responses.

  Assistance on project managementyour manager needs your

assistance on project managementyour manager needs your assistance on a major project. he has asked you to set up a

  A child grows up in a rich family

A child grows up in a rich family, yet lives under impoverished conditions as an adult

  Show the cost and time methods

Cost and Time Methods - As a project manager, show the cost and time methods you would chose to work with and why you believe these are the best.

  Summarize stakeholder ideas for potential solutions

Stakeholder Analysis - Summarize stakeholder attitudes about the identified problem and support your summary with specific data from your collection tool

  Features of a range of project control systems

Features of a range of project control systems and their effectiveness in controlling projects - key features of a range of project control systems

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd