Develop a proto-type for the project

Assignment Help Civil Engineering
Reference no: EM133438715

ASSIGNMENT:

Scenario

An engineer, who develops a proto-type for the project, loses it due to a mishap exactly the day before the submission. Is it morally correct to outsource the prototype of the project and reduce the risks of job insecurity? What should he do?

Reference no: EM133438715

Questions Cloud

Benefits of blogging is the personal : If one of the benefits of blogging is the personal, intimate style of writing, is it a good idea to limit your creativity.
Limitations of resources in a higher education setting : Student affairs professionals must recognize the limitations of resources in a higher education setting.
What are your thoughts on gender-awareness : The idea of gender specific needs and/or treatment is being challenged today. What are your thoughts on gender-awareness?
What were the short and long-term effects of us economic : What were the short and long-term effects of U.S. economic, political, and military intervention in Guatemala and El Salvador?
Develop a proto-type for the project : An engineer, who develops a proto-type for the project, loses it due to a mishap exactly the day before the submission.
How do the authors operationalize postcolonial perspective : In documenting health disparities experienced by underserved or marginalized communities, how important is being able to count and document ethnicity?
Explain critical thinking : Explain what critical thinking means to one. Education for nurses to enhance critical thinking is done through case studies, clinical practice, and simulation.
How is processes-climbing a mountain-growing a plant : How is writing like one of these processes: climbing a mountain, growing a plant, training a dog, or learning a song?
What is an insurance copulation : What is giant water bug and why do we say their sex roles are 'reversed'? What is an 'insurance copulation'?

Reviews

Write a Review

Civil Engineering Questions & Answers

  A segment of urban four-lane two lanes in each direction

nbspa segment of urban four-lane two lanes in each direction has a 3 upgrade that is 1500 ft long followed by a 1000-ft

  What is the cost per metric ton of nox removed

An emission control system for a new car costs $800 and reduces NO_x emissions from 0.4 g/mile to 0.23 g/mile. Assume the car is driven 10000 miles per year, and the life of the emissions control system is 11 years with zero scrap value.

  Analyse the properties of building material

Identify, and analyse the properties of building material - Discuss structural behaviour of the materials on An building components.

  Calculate the steady state concentration of inorganic n

Colette Lake has a surface area of 103 ha and a mean depth of 8 m. The pH of the water is 7.6. The lake receives surface water from a lake upstream, rainfall, and diffuse groundwater input. Atmospheric inorganic N deposition is insignificant.

  What flowrate can be expectedthrough the line

An 18 in. newriveted steel pipe 1000 ft long runs from elevation 150 ft toelevation 200 ft. If the pressure at elevation 150 ft is 100 psiand at elevation 200 ft is 72 psi, what flowrate can be expectedthrough the line? (use e = 0.003 ft)

  Which pipe size is more economical at an interest rate

A chemical engineer is considering two styles of pipes for moving distillate from a refinery to the tank farm. A small pipeline will cost less to purchase (including valves and other appurtenances)

  Modefication of hydraulic lift to operate electrically

Prepare a bachelor thesis about the modification of (WG 300/2000) hydraulic lift to operate electrically - Explain the possible methods

  Explain how the difference in piezometric pressure

A manometer is used to measure the pressure difference between points A and B in a pipe. Water flows in the pipe, and the specific gravity of the manometer fluid is 2.8. The distances and manometer deflection are indicated.

  Determine the acceleration of the boxes

Boxes are placed on a slope at uniform intervals of time trelease and slide down the slope with uniform acceleration. Knowing that as a box B is released, the preceding box A has slid 6 meters down the slope and that 1 second later they are 10 meters..

  Write a c program for that writes the value to memory

Write a C program for a HCS12 microcontroller that writes the value, 0x78, to Memory Location VAR1 and then calls a delay function. The delay function should generate a delay of 0.25 milliseconds.

  What true stressis necessary to produce a true plastic

A coal mine's entry and breakthrough centers are set at 60ft with 20ft-wide openings.  The 6ft coal seam lies 1,000ft below the suface, and the specific gravity of the overburden is 2.4.  If the compressive strength of 4in.

  Stable matching algorithm

Suppose S is a stable matching for a given instance I of the Stable Matching algorithm, not necessarily the one produced by the Gale-Shapley algorithm.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd