Develop a communication plan related to project stakeholders

Assignment Help Project Management
Reference no: EM133279482

Assignment:

Case Study - Development of Syringes (Class II Medical Device)

The demands for designing safe and effective medical devices have significantly increased over the past decades. For example, medical experts expressed demand for improving current medical devices by illustrating and discussing the uses, general properties, and limitations of orthopedic biomaterials. The emergence of fraudulent devices drove the need for regulations. Countries all over the world have established laws and regulations to systematically manage medical devices in their respective markets. In the United States, for example, to assure the safety and effectiveness of medical devices in its market, the FDA (Food and Drug Administration) has established three regulatory classes based on the level of control: Class I General Controls (with or without exemptions), Class II General Controls and Special Controls (with or without exemptions), and Class III General Controls and Premarket Approval. For Class I and some Class II devices, simple controls will suffice for FDA clearance. Class III medical devices are subject to quality system requirements and stringent adverse event reporting and post-market surveillance. 

For companies that produce Class III medical devices, a premarket approval (PMA) will be required before the devices can be marketed. This is because the risk to the user or patient determines that a mass of trials must be done before approval. All device manufacturing facilities  are expected to be inspected every two years.

Imagine you are asked to develop around 30,000 syringes (class II medical devices) that comply with industry and government standards. The basic components of a syringe would be a plunger, a barrel, and a needle hub. The budget associated with the project is 90M and the timeline is 3 years. These devices have medium to higher risks to patients or end users. The majority of medical devices (over 40%) fall into this device classification. These are the catheters that are surgically placed in patients who need to receive intravenous infusions of medication, blood products, or nutrition or who may require frequent blood sampling.

Medical device development should be set to meet the requirements of the area the device is to be used in, but there are some general steps in the medical device product development lifecycle that are followed across the board. The milestones include initial concept, product design, prototyping, device testing, device manufacturing, and product launch.

During the initial concept phase, the company needs to complete a basic market analysis, identifying the need for the product, competitive assessment, and plan for risk and regulatory assessment plans.

During the design phase, the project core team is formed to define the project timelines, generation of customer requirements, connect generations, and subdivide the contractual tasks which may include the modeling, drafting, and documentation work to some contractual company.

During the prototyping phase, the basic prototype is built to verify the customer requirements are met and that the concept is meeting the engineering requirements and plan for regulatory actions. 

During device testing, the engineering requirements are analyzed and then the change order is raised to order the components from vendors before device manufacturing.

During the product launch phase, training is planned and all the risk management and regulatory plans are maintained. Standards are updated if necessary, and the lessons learned document is created for upcoming projects.

Stakeholders are integrally involved in the healthcare system and would be substantially affected by reforms to the system. The major stakeholders involved in the development and usage of these devices include patients, physicians, employers, pharmaceutical firms (vendors and competitors), and the government. Apart from them, there would be an internal team working in a company indirectly responsible for the development and they are responsible for the product quality, product design, product manufacturing, process documentation, getting regulatory clearances, and supply chain for monitoring the required components and plan for change orders, marketing team to generate the sales in the market. All the stakeholders have duties and responsibilities.

A Communication plan is established for the project communications and helps to identify howthe information is shared with all the stakeholders and what is expected from each stakeholder as part of project execution. This plan consists of Milestones, Deliverables at each milestone, communication methodology, frequency of communication, priorities, and the participants. 

Typically for these projects, weekly meetings are preferred in all the phases of product development and a quality associate joins all the meetings along with the project manager Regulatory associate joins during the initiation, verification, and review phases. All these are included in the project work breakdown structure. The WBS is a structure to see the milestones and the sub-tasks associated with the milestones and the executive responsible to complete the task. Generally, in a WBS, Level 1 is the project, Level 2 is the milestones, Level 3 is the tasks, Level 4 is sub-tasks and Level 5 is activities.

Case Study Questions:

1. Identify the stakeholders required for the development of the medical device. (Classify the internal and external stakeholders using a context diagram).

2. Once the stakeholders are identified, classify the impact of each stakeholder throughout the product development process. (Make sure to justify your responses or ratings)

3. Develop a communication plan related to project stakeholders (Include all the essential elements required for a typical project communication plan)

4. Based on your understanding, Developing plan for the entire project that includes the budget for each phase, start and end date, responsible stakeholder(s), and milestones. (Make sure the durations are reasonable).

5. Develop a milestone plan for the project.

6. Design the network diagram and identify the critical path for the project. Based on your assumptions for most likely, pessimistic and optimistic times for each of the phases, what is the total project time?

7. What is the duration and probability of getting the project completed within 1, 2, and 3 of the total project time both from an optimistic and pessimistic point of view?

8. make project work breakdown structure to show the milestones and tasks.

9. Develop a detailed work package for two of the WBS items at two different levels. For the same WBS elements in the project at two different levels, identify the inputs and project success factors.

10. What are the project success factors according to your analysis? Do you see any perceived risks?

Read through the case study.

Reference no: EM133279482

Questions Cloud

Define the concept of a change agent : Define the concept of a change agent, including the traits and characteristics that best represent a change agent in today's organization
Reading and listening to the contents presented : SOCIOLOGY 1 University of California, reading and listening to the contents presented in the link above, share your analysis and critique of the contents
Functions of management in place of employment : How are you currently using the four functions of management in your place of employment or at a previous employer.
Describe the roles of the nurse for the program : Describe the roles of the nurse for the program you are currently enrolled. Identify the scope of practice for the nurse in state where you intend to practice
Develop a communication plan related to project stakeholders : Develop a communication plan related to project stakeholders (Include all the essential elements required for a typical project communication plan).
Why is there ongoing poverty in the u.s. : SOWK 3200 University Of Connecticut Why is there ongoing poverty in the U.S. in spite of the fact that this is the most prosperous country in the world?
What score did you get : SOCI 1005 Carleton University Draw from some aspect of this week's readings or lecture to help explain your score
Describe what a phantom stakeholder may be : Describe what a phantom stakeholder may be? Throughout a project, do random, new, people, want to become a stakeholder
How can employees benefit from a survey intervention program : How can employees benefit from a survey intervention program which is drafted by you? Describe new developments in the design of pay structures

Reviews

Write a Review

Project Management Questions & Answers

  Why did the court reverse the boards decision

What factual difference existed between the Buffalo Linen case referred to in the text and the Brown case?- Why did the Court reverse the Board's decision?

  Effect of applying total quality management

Project on The Effect of Applying Total Quality Management on Project Management

  What is the result of the critical path analysis

What is the result of the Critical Path Analysis on the revised Work Breakdown Structure? What information should Raef include in his presentation to management

  Professor wants to upload a video of talking horses

Your professor wants to upload a video of talking horses, and he/she wants it to go "viral" (i.e., spread very quickly to many people).

  Speculate whether you would hire experienced project manager

Speculate whether you would hire an experienced project manager or a consulting company to facilitate the starting of the PMO. Support your rationale with at least two advantages of hiring your selection.

  Enterprise risk management

How does ERM (Enterprise Risk Management) adoption and implementation in the higher education environment differ from the for-profit environment?

  What you have learned to date of va/ve

Applying what you have learned to date of VA/VE - how would you proceed with implementing this thought process where you work? At least one apa style reference

  What are the opportunities and challenges for ikea

Based on your analysis, what are the opportunities and challenges for IKEA in their market operations in (a) China; and (b) Japan?

  Identify events that could delay the closing of a project

Identify events that could delay the closing of a project or phase. Evaluate which event you believe would cause the longest delay and explain why. Provide an example to justify your answer

  Organisational chart to reflect organizational structure

SIT374/764 Project Management - Develop a project charter using template available in the template folder outlining the purpose, background, justification, definitions and abbreviations, and objectives.

  How can you maintain leverage over both your suppliers

What are the chances of other donut shops entering your market over the next year? Two years? Five years? How can you minimize the threat?

  ?what is a black swan

?What is a Black Swan and how can you prepare for these risks in projects? Give an example.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd