Develop a capacity to conduct the analytical studies

Assignment Help Electrical Engineering
Reference no: EM132015195

The objective of this study is to develop a capacity to conduct the analytical studies sufficient to allow valid and responsible engineering decisions to be made in the context of system planning and operation. To do this we will study the behaviour of a simple (but representative) 17 bus power system, as illustrated in figure 1. The various capabilities of the Power World software will provide sufficient analysis tools for our purpose.

This project is to be conducted on an individual basis.

The study specification provided below is flexible and its intent is to expose students to a realistic system and to observe and interpret its behaviour, rather than simply obtain results for a prescribed set of scenarios. Each student may use a different approach to the factors studied.

1. Begin by entering your "Base Case" system as given into Power World. The Base Case represents the normal high load condition. Examine the power flows and the voltage profile of the network. All load buses should be within normal system tolerances (i.e. 0.95
p.u - 1.06 p.u.). Use caution when entering the tap-settings for the transformers.

2. Observe the system behaviour under the condition where any line or transformer is taken is out of service. This represents the N-1 contingency test. Are there any lines or transformers that can not be taken out of service without the system voltages departing from the acceptable limits (i.e. 0.95 p.u - 1.06 p.u.), or overloading of the remaining transformers and lines? In particular, are there sections of the network that are marginal? Power World has a Contingency function which may help. You can tabulate and summarise your results.

3. Define a light load case where the loads are about 40% of those shown. Power World has a Scale Case function which may be useful here. Are there any voltages that are unacceptably high or low (and why)? Suggest a remedial strategy to compensate for any voltages that are out of spec. and verify the effectiveness of the strategy (Note: this should not normally require any additional capital expenditure). Discuss the nature and source of problems associated with a lightly loaded system.

4. For the light load case repeat the N-1 contingency test. How does the system behaviour compare to the normal high load case? Maintenance schedules which require a transmission line or transformer to be taken out of service are often performed at times where the system is lightly loaded. What capacity does the system have to withstand another line or transformer tripping with one element already out of service for maintenance. This represents the N-2 contingency test.

5. If the system does not possess sufficient redundancy to tolerate the loss of any line or transformer, suggest a remedial course of action (this may include additional infrastructure), and verify the effectiveness of the approach. The anticipated load growth for the system is an additional 20% over the next ten years, distributed throughout the network. Can the modified system meet this new demand? Will the modified system be N-1 tolerant when the new load is placed on the system?

6. A new industrial client is to be connected to the system. The client has premises located in the vicinity of bus 7 (the distance to the client is approximately twice that between bus 7 and bus 8), and has an anticipated 32kV demand of 20MVA at 0.8pf lagging. Plan a connection for the new load with redundancy so that the client can still be supplied even if one line feeding it is lost. What effect will the new load have on the system performance? Can the system tolerate the loss of any line or transformer under the new conditions?

7. What is typical of real power loss in the system? Choose whatever case you wish, and see what happens to losses when fixed generation is altered. Move some generation away from bus 1 to bus 2, or add a generator at a bus elsewhere.

8. Return to the base case, and develop a PV and VQ curves for bus 15. Discuss potential voltage stability issues for this bus, and suggests ways to mitigate them.

9. Please note that there will be an additional task for the Project, based on the second Computer Lab session (in week 7). This task will be given to the students later. It is relatively small compared to the tasks 1...8.

Your project submission must consist of a report submitted electronically (via Turnitin). The report should be kept to 15 pages maximum, not including appendices. As you will generate large amounts of data in this study it is imperative that you devote time to the development of an effective way to present results. The report should describe the tasks and discuss the results. Compact data representation with the help of tables, figures and plots is appropriate in the body of the report. Large tables with data generated by PowerWorld should appear in Appendices. It is insufficient to simply provide 15 pages of simulation results. Correctness of the solutions, quality of discussion, quality of presentation, engineering judgement, use of the material studied in the course, and use of external material (for High Distinction mark range) will be assessed.

2224_Bus Power System.jpg

Figure Bus Power System

Attachment:- project.rar

Verified Expert

This project analyses the power flow of a 17 bus test system using Power World Simulator. The load flow using NR method visualizes the voltages at all the buses and the buses which violate the voltage limits are identified. This also describes the impact of inclusion of new load in the system and generation variation. The voltage stability of the system is analysed using PV and VQ curves. The results will be different for users depending upon the power world data that we choose.

Reference no: EM132015195

Questions Cloud

What would be an effective communication plan : A controversial statement made in 2005 by Harvard University's President Howard Summers ignited a national conversation about the role of women in science.
How many of these are likely to be heterozygotes : Based on Hardy-Weinberg expectations, how many of these are likely to be heterozygotes?
What pricing model has best buy adopted : Case studies are an important learning strategy in business classes as they provide an opportunity for you to critically analyze events that have taken place.
Explain the risks and benefits to using hrt : Describe a patient who may benefit from HRT. Explain the risks and benefits to using HRT
Develop a capacity to conduct the analytical studies : ELEC 4100 - ELECTRICAL SYSTEMS - POWER SYSTEMS STUDY PROJECT - develop a capacity to conduct the analytical studies sufficient to allow valid and responsible
How will these fractions change next year : How will these fractions change next year if target duration is now 2 years and the interest rates do not change?
What can affect the function of enzymes : What can affect the function of enzymes? Why do enzymes change with ambient temperature?
What happen when the pancreas stops producing insulin : What happen when the pancreas stops producing insulin. What happen when the pancreas stops producing glucagon.
If you were in rus shoes what would you do and why : What Rocket Man did was simple: they billed subcontractor work at the higher in-house rate.

Reviews

inf2015195

12/20/2018 11:28:55 PM

Thanks The solution you have provided is very good. I sent my wishes to the expert when I received the solution from your team but now I have received the grading as well. I am very much impressed with the work. This is worth buying the assignment. thanks once more.

inf2015195

8/18/2018 3:21:41 AM

hi can i know where the progress is ? i like to request if u have any draft available i give you all the data in the folder . there is no more data left to provide . pls update if u needed futher the all requirement data is already in the question paper nut this is some reference only available 100684_1Archive.zip hope this will help if u need any further information pls let me know . 100684_1IMG 7383.jpg HI thanks for the drawing can you finish also this requirement for the questions ? 100684_1pj.PNG

len2015195

6/11/2018 3:08:24 AM

The objective of this study is to develop a capacity to conduct the analytical studies sufficient to allow valid and responsible engineering decisions to be made in the context of system planning and operation. To do this we will study the behaviour of a simple (but representative) 17 bus power system, as illustrated in figure 1. The various capabilities of the Power World software will provide sufficient analysis tools for our purpose. This project is to be conducted on an individual basis.

Write a Review

Electrical Engineering Questions & Answers

  Lithium ion battery technology

The paper includes Lithium ion battery technology with its advantages and disadvantages. The paper discusses about the Lithium air battery in which detailed reactions of Lithium with air including nonaqueous as well as aqueous are given.

  Power transformers and tariffs

Construction of different types of power transformer, significant energy savings

  Paper on orthogonal frequency-division multiplexing

This document is shown a paper on Orthogonal frequency-division multiplexing with advantages, disadvantages and uses.

  Function of the hmi in a scada system

This assignment contains electronics engineering questions like State the commonly found components of a SCADA (Supervisory control and data acquisition) system. and decribe the function of the HMI in a SCADA system.

  Resultant waveform of the odd harmonic series

Prepare an Excel graph showing the individual components and summated resultant waveform of the odd harmonic series resulting in an approximate square wave.

  Explain scada system

Explain the function of the HMI in a SCADA system.

  Design a 2-digit 24 second shot-clock

Design a 2-digit 24 second "shot-clock" countdown timer with pushbutton controller.

  Model a discrete-time system

To understand di erent signal models To be able to model a discrete-time system and design simple signal processing algorithms.

  Draw a relay construction diagram

Draw a relay construction diagram and briefly explain the operation of a relay.

  Frequency division multiplexing

Write a short technical report on Frequency Division Multiplexing

  Impact of electron energy

Briefly discuss the impact of electron energy, electron current and target on the Bremsstrahlung generated.

  Traffic light controller

The schematic of the traffic light controller

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd