Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Two level sections of an east highway (G = 0) are to be connected. Currently, the two sections of highway are seperated by a 4000-ft (horizontal distance), 2% grade. The westernmost section of highway is the higher of the two and is at elevation 100 ft. If the highway has a 60-mi/h design speed, determine, for the crest and sag vertical curves required, the stationing and elevation of the PVCs and PVTs given that the PVC of the crest curve(on westernmost level highway section) is at station 0+00 and elevation 100 ft. In solving this problem, assume that the curve PVIs are at the intersection of G = 0 and the 2% grade, that is , A = 2.
Working a problem where there are two one-story buildings of different heights next to each other. Earthquake imparts a base motion z(t) that is a cosine function. I'm given a shape function for a column of height L when deriving the EOM for each ..
Calculate average figures for tonnes/round and powder factors in kg/tonne and Determine the drill metres required to achieve a production rate from grade control blasting.
The gate is rectangular with a horizontal width of 2m perpendicular to the paper. For a depth h = 3m of water, calculate the required force exerted by the hydraulic cylinder to keep the gate just closed.
The posItIon of a particle along a straight line is given by s = (t 3 - 9t 2 + 1St) ft, where t is in seconds. Determine its maximum acceleration and maximum velocity during the time interval 0 :5: t :5: 10 s.
The aluminum end and the copper end are maintained at temperatures of 50°C and 260°C, respectively. The thermal conductivities of aluminum and copper are 205 and 385 W/m · K, respectively. The temperature of the aluminum-copper junction in the rod..
A runs slope a distance of 156.777 m from one point to another point at a rate of +1.5%. What is the corresponding horizontal distance between the points?
Air can be assumed as a di-atomic ideal gas. Find the final temperature and the amount of work ( in kW) required for air compression at a rate of 100 mol/s , from an initial condition of 1 bar an 25 C to 10 bar; for the following ways:
Draw A flow net. Show flow lines, flow Channels, and Equipotential lines. Using flow nets, please provide an estimate of seepage rate below the dam. Your submittal will provide the basis for an environmental impact statement regarding the construc..
This material is related Geotechnical Engineering, please only answer if you are certain and sure of your answer. An undisturbed soil sample has a dry unit weight of 112 pcf with a specific gravity of solids equals to 2.68.
In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.
Assuming unit surface area, find the conductive heat loss through the furnace wall and the temperature at the interface of the fire clay and red brick.
Find the time for one complete cycle of this motion if the spring constant is 21 N/m. (Assume that once the pendulum ball hits the spring there is no effect due to the vertical movement of the ball.)
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd