A dense sand has an effective friction angle of 43 and c'=0. A dry, 2.8-inch diameter sample is tested in drained triaxial shear with a confining pressure of 2500 psf. What axial load, P (in pounds), will be required to fail the sample?
Set up life cycle diagram for both alternatives and calculate net present value (NPT) and annual cost for the life time.
Use the bisection method to find the root of the equation f(x) = x 2 - 4sin(x) = 0. For initial bracketing interval [a,b] , take a=1 and b = 3.
the maximum degree of curvature can be at most 6.0 and the superelevation can be at most +6.0%. Design the ramp for the highest horizontal curve design speed given the constraints.
Critical review the decision making of a failed major construction/property project within the UK in the last ten years.
A soil borrow material in its natural state in the ground has a unit weight of 118pcf. Its natural water content is 7%. What is the dry unit weight of this material?
Determine the corresponding error in the computed discharge
Pore water pressure is to be observed during the construction of the embankment. Calculate the pore water pressure which must not be exceeded at any point in the clay layer 9 m below the surface of the embankment to ensure a shear strength of 100 ..
Calculate the tensile modulus of elasticity for a 10 laminated composite consisting of 62 percent by volume of unidirectional carbon fibers and an epoxy matrix under isostress conditions.
Consider a cantilever mass-less beam subjected to a concentrated mass at the tip of the beam. Assume, length L, flexural stiffness EI, and mass m.
what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?
Measure the distance PA, PB, PC etc. from p to various point with chain or tape and plot them to scale along the co responding rays. Join the points a, b, c, etc. to give outline of survey.
Land is extremely valuable in this area therefore to win this job you need to consider innovative approach to reduce the waste areas
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd