Reference no: EM13187745
On the basis of the information regarding the risk involved in the two projects, you came up with the following probability distributions for the projects:
Project A Project B
Probability Net Cash Flows ($) Probability Net Cash Flows ($)
0.3 8,100 0.3 500
0.5 9,100 0.5 8,100
0.2 10,500 0.2 16,500
To evaluate the two projects, you decide to use the company's weighted average cost of capital (WACC) for the less risky project (11 percent) and the WACC plus two points (13 percent) for the more risky project.
What is the expected value for each project? What does this value represent?
What is the coefficient of variation for each project? What information does this measure provide to you and to the company?
Which project has the most risk? Why?
What is the risk-adjusted NPV for each project? What do these measures tell you and the company?
Which project would you recommend to management, and how would you justify your selection?
If these two projects were not mutually exclusive, would you select both? Why or why not?
Find the rate of flow outward through the sphere
: A fluid has density 4 and velocity field v=-yi+xj+4zk. Find the rate of flow outward through the sphere x^2+y^2+z^2=16
|
Discuss the apache web server
: Discuss the Apache Web server in regard to cost, functionality, and compatibility. Are there certain implementations were it may not be suitable?
|
Compute the pressure and the temperature
: Calculate the pressure and the temperature of the compressed gas. In a diesel engine the compression ratios are typically much higher; redo the same calculation for the compression ratio of 20:1.
|
What score is required for an applicant to be in the top
: The scores on a psychological prole test given to job applicants at a nuclear facility are known to be normally distributed with a mean of 65 and a standard deviation of 10.
|
Determine which project has the most risk
: On the basis of the information regarding the risk involved in the two projects, you came up with the following probability distributions for the projects: Project A Project B Probability Net Cash Flows ($) Probability Net Cash Flows ($) 0.3 8,100 ..
|
Compute the specific rate constant for the trail
: The observed rate constant(k-observed) for one of the trials was measured to be 0.00400 s^-1. If the concentration of hypochlorite was fixed at 0.134 M, calculate the specific rate constant (k) for the trail.
|
What is the depth d
: A cylindrical container 1.7 {rm m} tall contains mercury to a certain depth, d. The rest of the cylinder is filled with water. If the pressure at the bottom of the cylinder is two atmospheres, what is the depth d?
|
The marketing mix must be a dynamic
: The marketing mix must be a dynamic! Given the changes that occur on a regular basis, it is imperative for marketing managers to scan the environment around them to ascertain what changes are happening (both consumer preferences and competition) and ..
|
State what is the average rate of consumption of dye
: moles of dye in 50 mL of solution is consumed in 188 seconds, what is the average rate of consumption of dye in mol/L.s?
|