Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A masonry project requires 900 sf repointing. Labor of this activity is given as in the CREW, 1 brick mason and 1 helper. The productivity is 0.5 labor hours per 1 sf. The wages are for the mason $60 and for the helper $45 per hour. what will be The cost of labor in dollars.
Water flows down a spillway at the rate q = 15 m^3/s into a horizontal channel where v1 = 20 m/s. Determine the depth of flow in the channel y2 that will casue the hydraulic jump to occur in the channel. Determine the headloss hL in the jump.
In an attempt to estimate the speed of a vehicle just before it hit a traffic signal pole, a traffic engineer measured the length of the skid marks made by the vehicle and performed trial runs at the site to obtain estimate if the coefficient of f..
why is wood more common in residential construction in the US and concrete more common in commercial construction
calculate the: 1) molar concentration of metal ion in the stock coagulant solution; 2) coagulant feed rate (into the process water flow stream) in units of L/day and L/min; 3) alkalinity consumed (in the process water flow stream) in units of mg/L..
38 mL of 0.02 N HCl is added to neutralize 50.0 mL of lime water (Ca(OH)2). Calculate the hardness of lime water as mg/L as CaCO3 and mg/L as Ca(OH)2.
determine the velocity and acceleration of point C of the belt, (a) immediately before the power is turned off. (b) 9 s later.
A level is set up midway between two wood stakes that are about 300 feet apart. The rod reading on Stake A is 9.65 ft and the reading on stake B is 4.23 ft. The level is then set up 6 feet in front of stake B.
An underground limestone mine with production of 12,000 tons/day will use trucks for the main haulage between an ore pass and a hoist skip pocket. The hauling distance is 5500 ft. The main haulage drift is horizontal and is 12.5 ft wide and 12.5 f..
What are minerals? Sketch different types of mineral crystal forms and list different types of rock forming minerals. Describe with examples the importance of mineral identification in engineering applications.
Cylindrical, steel bar stock (density = 7833 kg/m3, Cp = 0.465 kJ/(kg C)) of 10-cm diameter is heat-treated by drawing it at a velocity of 3 m/min through a 6-m-long furnace maintained at 900C.
A circular sewer is laid on a slope of 0.5%. What diameter is required if the concrete is to carry 25 cfs. If the desired design mean section velocity is between 3 and 7 feet per second, is the design acceptable
Water flows through a horizotal 45 deg reducing bend with a 36 inch. diameter upstream and a 24 inch diameter downstream, at the rate of 20 cfs under a pressure of 15 psi at the upstream end of the bend. Neglecting head loss in the bend, calculate..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd