Determine what is the required pipe size to deliver

Assignment Help Civil Engineering
Reference no: EM13305814

A concrete pipeline is installed to deliver 6m^3/sec of water (10degressC) between two reservoirs 17 km apart. If the elevation difference between the two reservoirs is 12m, what is the required pipe size?

Reference no: EM13305814

Questions Cloud

How many days will fish hatchery have to contain river water : If the initial concentration of parathion in the runoff from the agricultural field is 3 ppb, the velocity of the river is 2.3 miles/day, how many days will the fish hatchery have to contain river water in holding tanks until the parathion concent..
Estimate the orbital period of the satellite : A satellite is in orbit at a height of 600 km above the Earth's surface. Find the orbital period of the satellite
Faith seeking understanding : Identify clearly the topic(s) you have chosen to discuss and discuss the topic in light of the teachings of the Church
How many days will the fish hatchery have to contain water : If for parathion, the activation energy is 15.4 kcal/mole and A = 8.1 x 109 at a pH = 7.8, how many days will the fish hatchery have to contain the river water if T = 15 oC (winter time)
Determine what is the required pipe size to deliver : A concrete pipeline is installed to deliver 6m^3/sec of water (10degressC) between two reservoirs 17 km apart. If the elevation difference between the two reservoirs is 12m, what is the required pipe size
Find is it virtual or real : A 2.0cm tall object is located 18.0cm in front of a converging lens with a focal length of 10.0cm. Is it virtual or real
Situation and the effect of the change request : The situation and the effect of the change request on the schedule, cost, and features.
How to calculate the forces in members ec and ef : Using method of joints, calculate the forces in members EC and EF. Note that the length of the member CD is 3.464 m, the length of member EC is 2m, and angle CDE is 30 degree ( this will cut down a bit of trigonometry effort).
What price must the division charge in order to break even : The division has fixed costs of $10,000 per month, and it expects to sell 42,000 strips per month. If the variable cost per strip is $2.00, what price must the division charge in order to break even?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine what is the carts speed at point b

The cart takes 5.00s to go from point A to point C, and the cart takes 1.90s to go from point B to point C. What is the cart's speed at point B. Express answer numerically to three significant figures in feet per second.

  Determine the maximum allowable tensile force

An aluminum link is subjected to axial tension. The loading is limited by the conditions of not yielding and not elongating excessively. The yield limit is satisfied if the stress remains below 50%of the 325M Payield stress.

  Calculate the pressure in point 1 and the density of fluid

A U manometer reads 20 cm air as operating fluid and a given manometric fluid. A single branch closed tube reads 35 cm connected to point 1. If P2 = 1.2 ATM calculate the pressure in point 1 and the density of the manometric fluid.

  How many 1-inch diameter steel bolts are required to hold

The two cylinder containers are joined by bolting their flanges together. How many 1-inch diameter steel bolts are required to hold the cylinders together when the assembly is subjected to an internal pressure of 200 psi

  Determine the friction angle and shear strength

Normal load at failure was 93.8N with a maximum shear load of 38.7N. Find stresses on the failure plane, sketch a graph showing these on the shear stress and normal stress axes. Find the friction angle and shear strength.

  Determine what is the maximum normal stress in the bar

If the bar is 90 degrees F. If the bar is cooled to 40 degrees F, what is the maximum normal stress in the bar and what is the maximum shear stress alpha = 13*10^-6 /degF, E = 10*10^3 ksi

  Find the average time in system

If the time required to pay for parking is exponentially distributed with a mean of 15 seconds, find the average time in system.

  Determine the required pumping rate

Determine the required pumping rate. the aquifer has T= 1600 m2/day and the wells each have radius of influence of 600m.

  Determine the post construction vertical stress imposed

Determine the preconstruction and post construction vertical stress imposed on the soil at a point 2 m below the center of the foundation area (assume westergaard conditions applied)

  Calculate available water capacity

given bulk density as 1300kg/cubic meter and field capacity as 22% by weight and permanent wilting point as 10% by weight calculate available water capacity.

  Determine the basin dimensions

Determine the basin dimensions (width, length, depth) for a detention time of 3 hours and a length to width ratio of 4 to 1. (use English units)

  Calculate enthalpy that has been added by burning fuel

Exhaust gas from a chemical process flows at a rate of 8,000 actual cubic feet per minute (acfm) from point A at 250°F and 1 atm pressure. It flows through a circular duct to a fan

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd