Determine what is the maximum speed attained

Assignment Help Civil Engineering
Reference no: EM13312479

The combined weight of a bicycle and its rider is 190 lbs, and when the rider is on the bike, their frontal area is 5.4 square feet, with a drag coefficient of 1.2. The coefficient of rolling resistance can be taken to be a constant for all speeds, equal to 0.008. If the cyclist is coasting down a 6% grade, what is the maximum speed attained?

Reference no: EM13312479

Questions Cloud

What is the work done by the gravitational force : A person pushes a 20 kg shopping cart at a constant velocity for a horizontal distance of 22 m. What is the work done by the gravitational force
Find the support movements draw sfd and bmd : A fixed beam of span 6m carries point loads 20kN and 15kN at 2 m and 4 m from the left end respectively. Find the support movements draw SFD and BMD
Calculate the ionic packing factor for fcc nacl : Calculate the ionic packing factor for fcc NaCl. Take the atomic radii for Na and Cl as 0.097 and 0,181 nm respectively.
Calculate the average linear velocity : If a discus thrower rotates through the last 46 degrees of a turn in 0.11 seconds and the distance from the axis of rotation to the center of the discus is 1.22m
Determine what is the maximum speed attained : The coefficient of rolling resistance can be taken to be a constant for all speeds, equal to 0.008. If the cyclist is coasting down a 6% grade, what is the maximum speed attained
Determine the normal stress in each portion of the rod : A polystyrene rod consisting of two cylindrical portions AB and BC is restrained at both ends and supports two 6-kip loads as shown. Knowing that E = 0.45 X 106 psi,
Discuss the merits of paying dividends : You just graduated last year (after completing a rigorous corporate finance course) and now you have been asked to discuss Payout Policy with a number of MBA students at Galen University
What is the average angular acceleration of the club : During a drive by golfer, the angular velocity of his club is zero at the top of the backswing and 34 rad/s at the bottom of the downswing just before impact with the ball, what is the average angular acceleration of the club
Determine the flow rate above the pipe : A 2-inch diameter glass pipe is connected to a pipe network in which the pressure is 70 psig. If the length is 300 feet and the outlet is 10 feet above the pipe, determine the flow rate.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find the average time in system

If the time required to pay for parking is exponentially distributed with a mean of 15 seconds, find the average time in system.

  Determine the heat transfer assuming process is reversible

he oxygen is compressed from 95 kPa, 20 C to 300 kPa, isothermally. Determine the heat transfer assuming (a) the process is reversible, (b) the process is irreversible such that 20% more work is required than the reversible case.

  Determine the settlements having stress

The soil properties of the clay are Cc = 0.25, Cr = 0.05, gsat = 18 kN/m 3 , for the sand gsat = 18 kN/m 3 , and the water table is 2 m below the soil surface. Determine the settlements when a stress of 100 kPa is applied by the building over an a..

  What length x must the seaward arm of the breakwater

Consider an L-shaped breakwater that protects a small harbor dredged to a uniform depth of 6 m. For a 2 m high, 10 s period incident wave at the head of the breakwater having incident wave direction of 60 degrees

  Make a list of threats which may be vulnerable to company

Make a list of threats which may be vulnerable to the company's information system.

  Determine the ntu values for each sampling port depth

The packed tower was 30 cm in diameter with sampling ports located at packing depths of 0,2,4,6,8,10, and 12 meters. The loading of water to the tower was 0.039 m^3/(m^2/s), and the temperature of groundwater was 10 degrees celcius.

  Discuss method of investigation upgrading of existing gravel

Discuss the method of investigation upgrading of existing gravel road to bituminous paved standard,40km long.

  What is the concentration of the chemical leaving pfr

We have a batch reactor ( r = -k1) with volume of V1. The concentration entering the batch reactor is Co. The batch reactor is operated from t =0 to t = t1. After that the water exits the batch reactor and enters a PFR (r = -k2C) wi..

  Does our non-destructive test have the required sensitivity

To be sure that the part does not fail, we plan to ensure that the maximum applied stress is only one third of the tensile strength. We use a non-destructive test that will detect any internal flaws greater than 1.25 mm long.

  Determine the work done and the heat transfer

Water, initially dry saturated vapour at 4 bar, lls a closed rigid con- tainer. The water is heated until its temperature is 400C. Determine the work done and the heat transfer.

  What return period must an engineer use in the design

What return period must an engineer use in the design of a bridge opening for a 50% risk that flooding will occur at least once in two consecutive years? Repeat for a risk of 100%.

  Is the state water-quality standard being met downstream

If the state standard downstream is not met, the state has informed town 1 that it must treat its sewage further so the downstream standard is met. Use a mass balance approach to show that the state's request is unfeasible.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd