Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
An equal-tangent crest vertical curve is designed for 70 mi/hr. The high point is at elevation 1011.4 ft. The initial grade is +2% and the final grade is -1%. What is the elevation of the PVT? Solve this problem with the parabolic equation rather than by using offsets.
A simply supported steel 'I beam' is made of three 1"*8" plates with a mass of 898.4 lbmass each as shown in I beam form. Steel has a modulus of elasticity of 30*10^6 psi. The beam is allowed to deflect 1.05 inch.
An activated sludge process receives 4000m^3 / day containing 120 mg BOD /L from the primary settling tank and 3500 m^3/day Containing 25mg BOD/L from the secondary settling tank.
A gas solution has the following composition, Oxygen = 35 g Nitrogen = 40 g Neon = 25 g Calculate mass fractions of all components. If you remove Neon, how much you have to remove to reduce mass fraction to 0.1
The average slope distance of 500m was measured with utilizing infrared light with wavelength = .91 um has a modulating frequency at 24.5 MHz. At the time of the measurement, the temperature was 27 degrees C and the atmospheric pressure was 755.1 ..
You are to design a chlorination tank for killing microorganisms in the effluent from a wastewater treatment plant. It is necessary to remove 99% of active bacteria in a wastewater flow of 120 m 3 /hr.
AGNO 3 is added to a solution containing 0.001 mol Cl - amd 0.001 mol Br- per liter.What are the concentrations of Cl - and Br- remaining when AgCl just begins to precipitate?
a tension member with cross-sectional area 3 in2 resists a load of 10 kips. How do you Calculate the normal and shear stress on planes making a 0, 20, 45, and 60 angle with the transverse section.
A. List of all possible resistance combinations that can be formed with these springs. indicate drawings and calculation of each unique configuration. B. How many unique combinations can be formed
Determine the effective annual interest rate for a nominal rate of 8% per year, in which is compounded quarterly.
Given the following data for a vertical curve of a road; G1=-2.5%, G2=+5.5% and station of PVI=250+50.At station 252+50, the vertical curve must intersect an existing road at elevation 48.48ft. the elevation on the tangent section at station 256+5..
The initial investment is $12,000 , there is no annual maintenance cost for the first 3 years , however , it will be $2,000 in each of years four and five , and then $4,500 in the sixth year and increasing by $2,500 each year thereafter .
A rural freeway has an ideal free-flow speed of 120 km/h and two 3.6 m lanes in each direction, with right shoulder lateral clearance of 1.2 m. Interchanges are spaced approximately 5 km apart. Traffic consists of 10 percent trucks and buses and 8..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd