The two members that make up the frame are separated by a roller at C and connected by a link at B that is pin connected at each end. Member CD is fix connected into a rigid wall at D. Draw the internal bending moment and shear force diagrams for member CD. Determine the value and location from point D of the maximum internal bending moment and shear force for the member. Take x = 2 ft. Be sure to draw complete free body diagram(s) for full credit.
In addition to performing the cut-and-fill operations, the contractor needs to excavate the entire building footprint to a depth of 8 feet for a basement construction made of concrete masonry perimeter walls supported by 2'-0" X 0'-10" continuous ..
a temperature probe moves with the velocity 2i+2j-3k through air. the temperature of air changes as T(x,y,z,t)=(2x^2-3y+z^3)cos(at). Find the rate of change of temperature measured by the probe.
If an alternative base material is available for $5,791.50 per lane-mile per inch depth, to use it, the minimum depth for asphalt has to be increase to 6 inch with no change of base and subbasedepth. What will be the total cost per lane-mile per i..
Knowing that each member has a 2 3 4-in. rectangular cross section and that each pin has a 12 -in. diameter, determine the maximum value of the average normal stress (a) in member BE, (b) in member CF.
A flood control project has a construction cost during the first year of $10 million, during the second year $6 million, and during the third year $2 million. It is completed at the end of the third year and thereafter incurs an annual operating c..
During a 60 minute storm the following amounts of rain fell during successive 15 minute intervals: 33mm, 23mm, 15mm, and 5mm. What is the maximum intensity
if the enginer is mounted floatiing on very weak spring, what is the amplitude of the vertical vibration of the engine? (b) if the engine is mounted solidly on a rigid foundation, what is the alternating force amplitude transmitted? Assume the con..
What are Engineering Societies based upon the research? List at least 10 discipline specific engineering societies along with their website addresses.
A solid steel sphere with a specific gravity of 7.85 and diameter of 0.02 m is falling at its terminal velocity through water at 25 °C. Using either trial-and-error or a graphical approach, determine the velocity of the sphere
Draw A flow net. Show flow lines, flow Channels, and Equipotential lines. Using flow nets, please provide an estimate of seepage rate below the dam. Your submittal will provide the basis for an environmental impact statement regarding the construc..
Runoff from a storm flows into a reservoir with a surface area of 20.0 ha at a constant rate. The reservoir level is observed to rise at 1 mm per minute when water is being released through the dam at a rate of 10 m3 per second.
the structure has a curved face being part of a circle with radius R = 32M. The dam holds water to a height = 28 m. Claculate the magnitude and direction of the resultant force per metre length of the dam wall
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!