The figure shows a distribution substation with a 25MVA (max), 69/12.47kV, Dyn1 transformer whose short-circuit impedance is 9% with an X/R=15. The three-phase short-circuit current at the 69kV is known to be 7kA and the equivalent impedance of the transmission system can be assumed to have X/R=5. The phase and ground relay element settings have been partially calculated, as shown in the table. All relays have a U3 type curve (given in the class handout). You can use CI=0.3 sec.
You are requested to perform the following tasks:
1. Calculate the current for a three-phase and single-phase-to-ground fault at a point close to one of the feeders' breakers.
2. Determine the time dial and instantaneous setting of the ground relay element associated with the main circuit breaker.
3. Determine the time dial and instantaneous setting of the phase relay elements associated with the 69kV circuit breaker.
4. Assuming that the transformer damage curve given in class can be applied, plot the transformer damage curve and the phase relay elements you calculated in part 3. The current axis must be in amps referred to 69kV. Indicate -graphically- all significant elements (times, currents) used to determine your settings in part 3.
PHASE
GROUND
CTR
Ipu (A)
TD
INST (A)
Feeders
4
2
25
1
28
600/5
Main CB
5.5
2.5
Disabled
1.5
?
1600/5
69kV CB
0.5
400/5
The paper includes Lithium ion battery technology with its advantages and disadvantages. The paper discusses about the Lithium air battery in which detailed reactions of Lithium with air including nonaqueous as well as aqueous are given.
Construction of different types of power transformer, significant energy savings
This document is shown a paper on Orthogonal frequency-division multiplexing with advantages, disadvantages and uses.
This assignment contains electronics engineering questions like State the commonly found components of a SCADA (Supervisory control and data acquisition) system. and decribe the function of the HMI in a SCADA system.
Prepare an Excel graph showing the individual components and summated resultant waveform of the odd harmonic series resulting in an approximate square wave.
Explain the function of the HMI in a SCADA system.
Design a 2-digit 24 second "shot-clock" countdown timer with pushbutton controller.
To understand dierent signal models To be able to model a discrete-time system and design simple signal processing algorithms.
Draw a relay construction diagram and briefly explain the operation of a relay.
Write a short technical report on Frequency Division Multiplexing
Briefly discuss the impact of electron energy, electron current and target on the Bremsstrahlung generated.
The schematic of the traffic light controller
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd