Air enters a turbine operating at steady state at 8 bar, 1127 C and exits at 1.5 bar, 347 C. The heat transfer from the turbine to its surroundings is 10 kJ/kg of air flowing through the turbine. Neglecting kinetic and potential energy changes and assuming the ideal gas model for the air, determine the worked deeloped, inkJ per kg of air flowing through the turbine

Reference no: EM13550428

Questions Cloud

Calculate the hydraulic conductivity k of the soil sample : A falling head permeability test was carried out on a 15 cm long sample of silty clay. The diameter of the sample and the standpipe were 9.8 cm and 0.75 cm, respectively. The water level in the standpipe was observed to fall from 60 cm to 45 cm in 12..
Which chemical will be transported the farthest downgradient : Groundwater has been contaminated with three chemicals: benzene (log Kow 2.13), pentachlorobenzene (log Kow 5.03), and naphthalene (log Kow 3.36). The aquifer (rs = 2.3 g/cm3; h = 0.4; foc = 0.02)
Determine the mass flow rate of the cooling water : Refrigerant 134a is compressed at steady state from 2.4 bar, 0 degrees celcius, to 12 bar, 50 degrees celcius. Refrigerant enters the compressor with a volumetric flow rate of 0.38m^3/min, and the power input to the compressor is 2.6 kW.
Nighttime traffic on a single lane of rural highway is light : Nighttime traffic on a single lane of rural highway is light, with a flow of 40 vehicles/hour , and is well described by a Poisson arrival process.
Determine the worked deeloped : Air enters a turbine operating at steady state at 8 bar, 1127 C and exits at 1.5 bar, 347 C. The heat transfer from the turbine to its surroundings is 10 kJ/kg of air flowing through the turbine. Neglecting kinetic and potential energy changes and as..
Water is observed to be seeped through this slope at a rate : The relative density of a sloped sand deposit is known to be 75%. Water is observed to be seeped through this slope at a rate such that the discharge velocity is 0.6 m/day.
Formulate an optimization problem to help the company find : Three parallel rural routes connect two cities A and B.  Traffic on these routes mainly consists of heavy trucks for a logging company, and passenger vehicle flow can be neglected.  The performance functions of these three routes are
Determine the maximum moment that can be carried : Find the nominal flexural strength from part (d.) to the service capacity from part (c.). e.) Compute the ratio of the flexural strength from part (d) to the service capacity from part (c).
Calculate the height of the model : An ogee spillway of a gravity dam is to be modeled using water. The spillway section is 40 feet high, its crest length is 60 feet and the maximum discharge is 3,000 CFS when the head on the crest of the spillway is 5 feet. Using a model scale of 1:10..

Reviews

Write a Review

Civil Engineering Questions & Answers

  How to sketch the hgl and the egl for the system

What power must the pump supply to the system to pump the oil from the lower reservoir to the upper reservoir at a rate of .2 m^3/s. Sketch the HGL and the EGL for the system.

  Is the head loss too great for the design to work

The design parameters are: • Q = 65 m3/d, • Wetland area (A) = 0.23 hectares (2,300 m2) (including the safety factor), • Aspect ratio = 8:1 • Average water depth (d) = 0.5 m • Bed slope = 1% (0.01 m/m) Given that the Manning's resistance factor

  A 2000-mw electric generating station burns 278 tonnes of

a 2000-mw electric generating station burns 278 tonnes of residual fuel oil per hour. the fuel contains 2.6 s and 1.2

  Determine is there a chance that cavitation will occur

Temperature is 20°C. A constriction in the pipeline causes velocity to increase to 13 m/s within the constriction. Assuming that Bernoulli's equation applies (i.e. p + ½ ? v2 = constant), is there a chance that cavitation will occur

  The pavement currently exhibits low to medium and localized

The pavement structure consists of 160 mm of hot-mix asphalt (HMA), 150 mm of granular base and 450 mm of subbase placed over silty clay subgrade. The pavement is 20 years old and its current PCI is 50. The pavement currently exhibits low to medium a..

  Determine the flow depth velocity and froude number after

In 2006, the united states emitted 6,000 million metric tons (Mt) of CO2, 26.6 MtCH4, and 1.2 MtN2O. using 100 year global warming potentials, whats is the equivalent CO2 emission rate of the total for these three gases, in GtC-eq/yr

  Find the position where the net electric field is zero

Given that the seperation distance between the charges is 5m, q1 = -3q2, find the position where the net electric field is zero. Do not use infinity.

  Find bod reaction rate constant of a municipal waste water

If the BOD5 of a municipal wastewater is 310 mg/L and the BODU is 340 mg/L, determine the BOD reaction rate constant (base e). What would be the 3 day 30°C BOD Assume, temperature coefficient = 1.047.

  Calculate the surface area and hydraulic retention time

Calculate the surface area (m2), diameter (m), volume (m3), and hydraulic retention time of a 3 m deep circular, primary clarifier that would remove 50 percent of suspended solids. Assume the surface overflow rate (SOR) used for design is 60 m3/m2-..

  The displacement x of package relative to the belt as the

A package is at rest on a conveyor belt which is initially at rest The belt is started and moves to the right for 1.3s with a constant 'a' and comes to a stop after a total displacement of 2.2m.

  Determine the normal depth yo and critical depth yc

A 1 m diameter unfinished concrete pipe (n = 0.015) has a slope of So = 0.001 and conveys water at Q = 0.5 m3/s. Find the normal depth yo and critical depth yc.

  Calculate q-w change in u and h for each processes

Cooling at constant pressure followed by heating at constant volume. Calculate Q, W, change in U, and change in H for each of these processes, and sketch the paths of all processes on a single PV diagram.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd