Determine the work done during this process

Assignment Help Civil Engineering
Reference no: EM131031136

Nitrogen at an initial state of 300 K, 150 kPa, and 0.2 m3 is compressed slowly in an isothermal process to a final pressure of 800 kPa. Determine the work done during this process.

Reference no: EM131031136

Questions Cloud

Least-squares regression line of final-exam scores : (i) What is the slope of the least-squares regression line of final-exam scores on pre-exam total scores in this course? What is the intercept? (ii) Use the regression line to predict Julie's final-exam score.
Slattery company income statement for year ending december : The company issued no-par common stock on that date for $240,000 cash. The product costs $14 to make, all of which is paid in cash at the time of production.
How do they affect the organizations operations : What disadvantages arise from them? What strategies and actions does the organization employ to maximise the benefits and minimise the problems associated with them.
Slope and intercept of the regression line : What are the slope and intercept of the regression line of the husband's height on the wife's height in young couples?
Determine the work done during this process : Nitrogen at an initial state of 300 K, 150 kPa, and 0.2 m3 is compressed slowly in an isothermal process to a final pressure of 800 kPa.
Making steps in the ethical cycle from a global perspective : List and discuss the decision making steps in the ethical cycle from a global perspective.
Relationship between price and number of carats : (I) What does the slope of this line say about the relationship between price and number of carats? (II) What is the predicted price when number of carats =0? How would you interpret this price?
What are the three potential conflicts of interest : What are the three potential conflicts of interest that can take place during the auditing process? Explain.
What were the stated goals of the policy makers : What were the stated goals of the policy makers (the fed and/or the US federal government) at the time? What specific policies were used to address the problems seen during the year?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate total co2 emissions from two polices from 2011

A more conservative increase from 27.5 mpg in 2011 to 35 mpg by 2020 is supported widely in Washington. California and 13 other states + the District of Columbia hope to increase that stander to 35 mpg by 2017 and 40 mpg by 2020.

  Determine the pressure difference between a and b

Fluids A and B ave specific gravities .75 and 1.00 respectively. If the mercury is used as manometer liquid determine the pressure difference between A and B

  Calculate temperature of the air at the exit of the nozzle

Assuming that the nozzle is well insulated and operating at steady state and that the air behaves as an ideal gas, calculate (a) the mass flow rate of air in kg/s, (b) the exit area of the nozzle in m^2,

  What is the concentration of cod in the effluent

The maximum specific growth rate of the organisms driving this reaction is 5.0 days -1 and the growth rate is 0.54 day-1. The activated sludge tank has a volume of 40 m3 and the flow rate into it is 400 m3/day.

  Compute magnitude of the load that is necessary to produce

A brass alloy has a yield strength of 280 MPa, a tensile strength of 390 MPa, and an elastic modulus of 105 GPa. A cylindrical specimen of this alloy 12.7 mm in diameter and 250 mm long is stressed in tension and found to elongate 7.6 mm.

  Concrete pier is loaded on top with a uniformly

Concrete pier is loaded on top with a uniformly distributed load of600 lbs per square foot.  Investigate the state of stressat a level of 4 ft. above the base.

  Calculate volume of thickened sludge with solids recovery

A gravity thickener receives 33.000 Lpd of wastewater sludge and increases the solids content from 3.0% to 7.0% with 90% solids recovery. Calculate the volume of thickened sludge.

  Find what will speed of the object be in meter per second

total energy (E) of a projectile is the sum of its kinetic and potential energy: E= 1/2 mV^2 +mgz where m is mass of projectile, V is speed, g is gravitational constant and z is height. 5.0 kg object, dropped from rest (V=0 at time t=0)

  What was the no2 concentration in parts per million

A 1 m3 sample of air was found to contain 88 mg/m3 of NO2 .The temperature and pressure were 25.0°C and 103.2 kPa when the air sample was taken. What was the NO2 concentration in parts per million

  Find the hydraulic conductivity of the aquifer

Drawdown at an observation well 15m from the pumped well is 3.0 m and a drawdown at a second observation well 150 m away is 0.30 m. Find the hydraulic conductivity of the aquifer.

  Find the top width of a v-notch capable of discharging

Find the depth and the top width of a v-notch capable of discharging a maximum of .7m^3/s and such that the head shall be 75mm for a discharge of 5.6 liters per second.

  What is the maximum step height

An open rectangular channel is 50 feet wide, flowing at a depth of 5 feet, and is carrying 1000 cubic feet per second. What is the maximum step height than can be placed into the flow without disturbing the upstream depth, without acting as a chok..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd