Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Consider two identical 80-kg men who are eating identical meals and doing identical things except that one of them jogs for 30 min every day while the other watches TV. Determine the weight difference between the two in a month
A semiautomated system has been developed as an alternative. The costs for the proposed method are $40,000 for equipment and $1.00 per manufacturing cost per unit. What is the break-even number of units per year
The ordinate of a5-hr unit hydrograph of a basin is determined equal to 300 cfs at atime 4 hours after the beginning of net rainfall. What would be therunoff rate after 4 hours if a storm of uniform intensity
Tacoma Narrows Bridge. Conduct either a qualitive and quantitive risk assessment on this project. Identify the risk factors that you consider most important for the suspension bridge construction. How would you assess the riskiness of this project..
Annual rainfall over the watershed is 36 inches and the annual runoff from the catchment is 12 inches. Evaporation from the reservoir averages 40 inches per year. The municipal water demand equals 100 million gallons per day
A water line to a home is usually 3⁄4" copper tube. What is the flow rate that can be delivered and still maintain laminar flow in the tube?
Determine the peak outflow rate when the inflow hydrograph is routed through this basin and what is the design storage and water surface elevation at the peak outflow rate.
Three point loads 10,000, 7500 and 9000 kN act in line 5m apart near the surface of a soil mass. Calculate the vertical stress at a depth of 4m vertically below the centre (7500kN) load.
Nighttime traffic on a single lane of rural highway is light, with a flow of 40 vehicles/hour , and is well described by a Poisson arrival process.
At the end of year 1 the piece of equipment is worth $15,000 and at the end of year 2 $13,000, and at the end of the third and final year the salvage value is equal to $9,000.Applying the straight line depreciation, calculate the depreciation expe..
you measure the average headway and average spacing of passing vehicles as 3.2 seconds and 165 ft, repsectively. calculate the flow, average speed, and density of the traffic stream in this lane.
A 3m deep layer of clay is underlain by impervious rock. An extensive area of fill is to be placed over the site. How long would it take for the clay layer to achieve 90% of its total final settlement.
Over the course of 3days, she added another 6lbs of water and at the end of 3days, there was 67lbs of water remaining. A nearby rain gage recorded 0.4 inches of precipitation over the period.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd