a 30-acre field received 4 inches of rain with 35% runoff.Determine the volume of water infiltrated on the field ( assume all the water that doesn't runoff infiltrates )
Calculate the pH of a 1-L solution containing 0.01 M sodium acetate after the addition of 3 mL 0.5 M H2SO4
A cross section of a cottage, 20 ft wide, is an isosceles triangle. If the slope of a side is 1.75 and there is a second floor 8 ft above the ground floor, what isthe width of the second floor?
A car travelling at 60 mph in a construction area skids into a stack of concrete barriers. Skid marks leading to the crash measures 150 ft .
What is the bulk modulus of a liquid that has a density increase of 0.02 percent for a pressure increase of 1000 lb/ft^2
A separate hopper-bottomed grit storage tank has a usable volume of 3 cubic yards. Compute the detention time in the aerated unit and the estimated length of time required to fill the storage tank with grit.
You should provide the structural engineer with a formal typed report that will include all of your analyses and final size of the footing. You should also include all of your design assumptions in your report.
Investigate the possibility of environmental problems that faced by the area of disaster.
If a flow of 5.0 cfs is to be carried by an 11000 ft cast-iron pipeline without exceeding a head loss of 137 ft, what must the pipe diameter be
Determine the required thickness of the pipe wall if the operational pressure head (pressure head in the pipe under regular flow conditions) is 40 m and if the flow control valve on the downstream end closes suddenly, developing a water hammer in ..
A rectangular concrete channel (n=0.015, S_o = 0.005) has a bottom width of 6.0 m and a discharge rate of 25 m^3/s. 1) Compute the normal depth y_n 2) Compute the critical depth y_c 3) Compute the minimum specific energy E_min
Estimate the machines production under these conditions using the travel time curves given in the Caterpillar Performance handbook.
The posItIon of a particle along a straight line is given by s = (t 3 - 9t 2 + 1St) ft, where t is in seconds. Determine its maximum acceleration and maximum velocity during the time interval 0 :5: t :5: 10 s.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd