Determine the upper and lower control limits of the x bar

Assignment Help Operation Management
Reference no: EM13251969

Thirty-five samples of size 7 each were taken from a fertilizer bag filling machine. The results were: overall mean = 57.75 kg, average range = 1.78 kg. Use 3 decimal points.

A) Determine the upper and lower control limits of the X bar chart where the standard deviation is = 3.
B) Determine the upper and lower control limits of the R chart where the standard deviation is = 3.

 

Reference no: EM13251969

Questions Cloud

Design a single-ended amplifier with a low frequency gain : The available circuit components are NMOS transistor, PMOS transistor, resistors, capacitors and inductors. Ideal sources can only be used to generate the supply voltage VDD & GND.
What is the cpk for this process : The process is known to operate at a mean thickness of 3.0 mm. What is the Cpk for this process? About what % of all units of this liner will meet specifications?
Create a new vi with a lighthouse control to the front panel : Begin with a breadboard, wire, an RGB LED and some resistors. Using the forward voltages given in the RGB LED datasheet, calculate the correct current-limiting resistors needed to light each color of the LED (assuming VDD = +5V).
Calculate the cp and cpk and draw a conclusion : Is this process capable of producing DRAM chips to specifications? In other words, calculate the Cp and Cpk and draw a conclusion with explanation.
Determine the upper and lower control limits of the x bar : Thirty-five samples of size 7 each were taken from a fertilizer bag filling machine. The results were: overall mean = 57.75 kg, average range = 1.78 kg. Use 3 decimal points.
Considered a benefit of flowcharting : Which of the following would NOT be considered a benefit of flowcharting?
What conclusions can you draw from the analysis : A list of 7 defects that lead to defects and the number of occurrences in a printed-circuit-board assembly line appear below.
Solve using n rectangles and the limit process : (a)using 4 rectangles find the area of the region bounded by f(x)=x^2 +1, the axis from x=0 to x=2,(b) solve part (a) using n rectangles and the limit process as n -> infinity.
Explain what mass of carbon dioxide was produced : When carbon is burned in air, it reacts with oxygen to form carbon dioxide. When 16.8g of carbon were burned in the presence of 57.4g of oxygen, 12.6g of oxygen remained unreacted. What mass of carbon dioxide was produced

Reviews

Write a Review

Operation Management Questions & Answers

  Which force has contributed to which shift

Consider the broad shifts in marketing and answer the following questions.

  In what way can improper incentives lead to a lack

In what way can improper incentives lead to a lack of coordination in a supply chain? What countermeasures can be used to offset this effect?

  Formulate the linear programming problem

Formulate the linear programming problem to maximize the profit during the coming month.  Write all of the constraints that are indicated by the above description of the problem.

  Will any action notices be generated

Develop a material requirement plan for the next 7 weeks for Item B and C. Will any action notices be generated? If so, explain what they are and why they must be generated.

  How many miles of pipeline arctic oil must install

Create a spreadsheet model to determine how many miles of pipeline Arctic Oil must install if it runs separate pipelines from each oil well to the T&R center. How much pipe will be needed? Use Solver.

  Compute total cost per year

A grocery store orders paper grocery bags from a distributor. The store uses 2,300 cases of bags per year, and its ordering cost is $65 per order.

  Organization recently developed a new compensation system

An organization recently developed a new compensation system, which has moved the organization from a static grade-based salary to a performance-based compensation system with possible yearly increases determined by yearly performance reviews.

  Develop material requirement plan

The MPS for product A calls for 100 units to be completed in week 4 and 200 units in week 7 (the lead time is 1 week). Spare part demand for Item B is 10 units per week.

  Improve processes on a continual basis

Analyze Fukuda's approach to developing and testing the CEDAC approach to continual improvement. Discuss the areas in which it has been most successful at the aspects of process improvement while it has not successfully addressed.

  What annual rate of interest is being earned on this fund

On January 1, 2005, a person's savings account was worth $200, 000. Every month thereafter, this person makes a cash contribution of $676 to the account. If the fund is expected to be worth $400,000 on January 1, 2010, what annual rate of interest..

  What is the maximum number of defectives allowed

In a double sampling plan the two acceptance numbers are: c1 = 8 and c2 = 12. The number of defectives found in the first sample is 9. Therefore, a second sample is taken. What is the maximum number of defectives allowed in the second sample for t..

  What team performance readiness might look like

Provide an example of what team performance readiness might look like at various readiness levels.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd