Thirty-five samples of size 7 each were taken from a fertilizer bag filling machine. The results were: overall mean = 57.75 kg, average range = 1.78 kg. Use 3 decimal points.
A) Determine the upper and lower control limits of the X bar chart where the standard deviation is = 3. B) Determine the upper and lower control limits of the R chart where the standard deviation is = 3.
Consider the broad shifts in marketing and answer the following questions.
In what way can improper incentives lead to a lack of coordination in a supply chain? What countermeasures can be used to offset this effect?
Formulate the linear programming problem to maximize the profit during the coming month. Write all of the constraints that are indicated by the above description of the problem.
Develop a material requirement plan for the next 7 weeks for Item B and C. Will any action notices be generated? If so, explain what they are and why they must be generated.
Create a spreadsheet model to determine how many miles of pipeline Arctic Oil must install if it runs separate pipelines from each oil well to the T&R center. How much pipe will be needed? Use Solver.
A grocery store orders paper grocery bags from a distributor. The store uses 2,300 cases of bags per year, and its ordering cost is $65 per order.
An organization recently developed a new compensation system, which has moved the organization from a static grade-based salary to a performance-based compensation system with possible yearly increases determined by yearly performance reviews.
The MPS for product A calls for 100 units to be completed in week 4 and 200 units in week 7 (the lead time is 1 week). Spare part demand for Item B is 10 units per week.
Analyze Fukuda's approach to developing and testing the CEDAC approach to continual improvement. Discuss the areas in which it has been most successful at the aspects of process improvement while it has not successfully addressed.
On January 1, 2005, a person's savings account was worth $200, 000. Every month thereafter, this person makes a cash contribution of $676 to the account. If the fund is expected to be worth $400,000 on January 1, 2010, what annual rate of interest..
In a double sampling plan the two acceptance numbers are: c1 = 8 and c2 = 12. The number of defectives found in the first sample is 9. Therefore, a second sample is taken. What is the maximum number of defectives allowed in the second sample for t..
Provide an example of what team performance readiness might look like at various readiness levels.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd