1.Two pumping wells 1,000 m away fully penetrate the same confined aquifer. One of the wells pumps at a rate of 1240 m3/ day and the second well pumps at 850 m3/ day. If the aquifer has a transmissivity of 2000 m2/ day and a storage coefficient of 4 x 10^-4, when would the wells start interfering with each other?

2.Vehicles arrive at a tollbooth according to the function h(t)= 5.2-0.2t, where h(t)is in vehicles per minute and t is in minutes. The toll booth operator processes 3 vehicles per minute. Determine the total delay, maximum queue length, and the time it takes the 20th vehicle to arrive waits from its arrival to it departure

Reference no: EM13562470

Questions Cloud

What is the orbital velocity of particles : If you observe light reflected from Saturn's rings, youshould see a redshift at one edge of the rings and a blueshift atthe other edge. what is the orbital velocity of particles at the outer edge of the rings
Find what is the velocity of cars after they stick together : an car mass 1000kg is traveling east30m/s . it is hit by another car 2000kg whick was travelingnorthwest at 20m/s.the two cars stick together. what is the velocity of the cars after they stick together
Calculate the design rate of super elevation : A simple highway curve is planned to connect two horizontal tangents that intersect at sta. 2500+00.00 at an external angle of 52°.  For a design speed of 60 mi/h and a curve radius of about 1.25 times the minimum allowable
What is the probability in each year that a flood : The annual maximum series of flood magnitude in a river has a normal distribution with a mean of 6000 m^3/s and a standard deviation of 800 m^3/s
Determine the total delay maximum queue length and the time : Vehicles arrive at a tollbooth according to the function h(t)= 5.2-0.2t, where h(t)is in vehicles per minute and t is in minutes. The toll booth operator processes 3 vehicles per minute. Determine the total delay, maximum queue length, and the time i..
Calculate the circulating load of cleaner tailings : A froth flotation process is used to concentrate copper ore. It is a two stage process with a rougher stage followed by a cleaner stage. The cleaner tailings are returned to the rougher flotation. Both stages are non-reactive unit operations and both..
When is the rider going to reach the stopping point : If we apply a breaking system to a skateboard while the speed of the skateboard is 5Milies per hour, the rider average weights is 180bounds while his height is 170 cm
Calculate the diameter of the cable required : A steel cable is to support an elevator whose total (loaded)mass is not to exceed 3100kg. calculate the diameter of the cable required
What is the maximum queue length : There are 10 vehicles in a queue when an attendent opens a toll booth. Vehicles arrive at the booth at a rate of 4 vehicles per minute. The attendent opens the booth and improves the service rate over time following the function u(t)= 1.1 +0.3t, wher..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find the probability that student smokes but does not drinks

Suppose that in a senior college class of 500 students it is found that 210 smoke, 258 drink alcoholic beverages, 216 eat between meals, 122 smoke and drink alcoholic beverages, 83 eat between meals and drink alcoholic beverages

  Compute the design strengths of a rectangular beam with

Compute the design strengths of a rectangular beam with bw=15 in, d = 36 in, d'=2.5 in, fy= 60ksi, fc'=4ksi, and at the top of the beam are 4 #8 bars, the bottom has two rows of 4 #10 beams

  Determine the rotational speed of the rollers

The distance from the center of the plate to the point of contact between the plate and the roller is 12 cm. The radius of the roller is 0.5 cm. Assuming no slip between the wheels and the plate, determine the rotational speed of the rollers.

  Design a hollow steel shaft with an inside diameter

Design a hollow steel shaft with an inside diameter 1/3 that of the outside diameter. The shaft transmits 200 kW at a speed of 20 Hz. The allowable shearing stress is 55 MPa, and the allowable angle of twist is 1 degree per meter of length.

  Detail description of staircase

Detail description of Staircase with it's plan, design criteria about it for various types of buildings,standerd dimensions of rise & going of stair which is applicable in civil engineering works

  Determine wet unit weight and dry unit weight-wet density

Given the following data for an undisturbed soil sample: Gs = 2.69, e = 0.65, water content = 10% Determine wet unit weight and dry unit weight, wet and dry density

  Determine the hydraulic conductivity of the soil sample

A constant head permeameter has a sediment sample with a cross sectional area of 100 cm^2. The sediment sample is 30 cm long. The porous plates on top and bottom of the sample holding it in place have a vertical hydraulic conductivity of 0.001 cm/s a..

  Determine the arrival rate assuming that it is unchanged

Determine the arrival rate assuming that it is unchanged over the duration of the observation period. An approach to a pretimed signal with a 60second cycle has nine vehicles in the queue at the beginning of the effective green.

  Compute the required stirrup spacing at the given location

At a certain location along the span, a reinforce concrete beam section with d=14 in. and b=10 in. is subject to a design shear of Vu=50k. Using No.4 stirrups, compute the required stirrup spacing at the given location. assume F'c=3 ksi and Fy=40 ..

  Estimate the maximum moment that must be resisted

A 5 cm diameter, 6 m high pole is fixed in concrete. The pole supports a circular 4 m diameter sign. Estimate the maximum moment that must be resisted by the concrete for a wind speed of 30 m/s

  Calculate entropy increase assuming constant specific heat

A paddle wheel, inserted inserted into the volume, does 720 KJ of work on the air. If the volume is 2 cubic meters, calculate the entropy increase assuming constant specific heats.

  Calculate the additional stress as a function of depth

Calculate the additional stress as a function of depth that a temporary construction wall , like that shown in Figure As 1, must take as the result of a crane sustained in the zone above it.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd