Determine the time needed for block a to rise 3 m

Assignment Help Civil Engineering
Reference no: EM13555110

1.A reservoir has been built to supply water during droughts. The design volume is 7.00*10^6 m^3. If the average flow into the reservoir is 3.2 m^3/s and the DNR requires that the discharge from the reservoir be at least 2.0 m^3/s, how many days will it take to achieve the design volume?

2.The motor draws in the cable at c with a constant velocity of vc= 4 m/s. The moto draws in the cable at D with a constant acceleration of aD=8 m/s^2. If vD=0 when t=0, determine:

a) the time needed for block A to rise 3 m

b)the relative velocity of block A with respect to block B when this occurs.

Reference no: EM13555110

Questions Cloud

Find the minimum weight need to keep the gate closed : A plane gate of uniform thickness holds back a depth of water as shown. Find the minimum weight need to keep the gate closed. theta=30degrees L = 3m w = 2m
Determine the magnitude of acceleration when : A particle travels along a path defined by the parabola y=0.5x^2. If the component of velocity along the axis is Vx=6t with t in seconds. determine the particle's distance from the oriigin
Find the nominal flexural strength and the design strength : Consider a singly reinforced concrete beam with a base dimension of b= 12in and d=20in. Assume all bars are located in one row. Use Grade 60 steel and 5ksi concrete. Find the nominal flexural strength and the design strength for the following cases
Determine the pressure (psi) at the bottom of the well pipe : Pressure Variation in a Fluid at Rest 1. In April 2010, the Deepwater Horizon drilling rig experienced a severe explosion and fire and sank off the coast of Louisiana. Eleven persons died, and 17 others were injured. The resulting uncontrolled oil re..
Determine the time needed for block a to rise 3 m : The motor draws in the cable at c with a constant velocity of vc= 4 m/s. The moto draws in the cable at D with a constant acceleration of aD=8 m/s^2. If vD=0 when t=0, determine: a) the time needed for block A to rise 3 m b)the relative velocity of b..
Determine the calculated pressure at each of the 5 pressure : Knowing the submerged depth of each of the 5 pressure taps and the density of water, determine the calculated pressure at each of the 5 pressure taps.
What is the shear strength in terms of effective stress : What is the shear strength in terms of effective stress on a place within a saturated soil mass at a point where the total normal stress is 295 kN/m2^2 and the pore water pressure 120 kN/m^2?
What is the average number of vehicles waiting to be served : An expressway off-ramp consisting of a single lane leads directly to a tollbooth. The rate of arrival of vehicles at the expressway can be considered to be Poisson with a mean of 30 veh/h.
Determine two possible angles theta at which this : A fireman is standing on a hoist and sprays water at a fire. the fire is 35 ft in the x direction and 20ft downward in the y direction. the water flows at 65 ft/s. determine two possible angles theta at which this can be done. assume the angle below ..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Estimate the required removal efficiency of particles in esp

An electrostatic precipitator (ESP) is being designed to collect flue gas particles at a power plant. The following information has been collected: electric field intensity = 100,000 V/m, and average particle charge = 0.30 fC (1 fC = 10-15 C).

  Classify the soils using the given grain size distribution

Classify the following soils using the given grain size distribution (ASTM system) and Atterberg Limits data:

  How many units must the company sell each year to breakeven

the cost and revenue associated with producing a sustainable component are fixed costs = $112,500. Variable costs = $30 / unit. Revenue = $45 / unit. How many units must the company sell each year to breakeven

  Determine mans velocity and acceleration at the instant

While the swing bridge is closing with a constant rotation of 0.5 rad/s, a man runs along the roadway such that when d = 10 ft he is running outward from the center at 5ft/s with an acceleration of 2 ft/s^2, both measured relative to the roadway.

  Calculate the heat transfer required to do quality in btu

A rigid 1ft^3 vessel contains R-134a originally at -20F and 27.7% quality. The refrigerant is then heated until its temperature is 100F. Calculate the heat transfer required to do this, in Btu.

  What do will result if the concentration of the waste

The discharge from the Renenutet sugar beet plant causes the DO at the critical point to fall to 4.0 mg/L. The Meskhenet Stream has a negligible BOD and the initial deficit after the river and wastewater have mixed is zero

  What is the largest number of phases that can coexist

Considering both temperature and pressure to be variables, what is the largest number of phases that can coexist at equilibrium in a binary alloy

  Briefly describe the measures

Briefly describe the measures that should be considered for the control of corrosion of embedded steel in concrete.

  Compute the percent voids in total mix and percent voids

An aggregate blend is composed of 59% coarse aggregate by weight (sp. Gr. 2.635), 35% fine aggregate (Sp. Gr. 2.710), and 5% filler (Sp. Gr. 2.748). The compacted specimen contains 6% asphalt binder

  Calculate the hydraulic conductivity of the clay

A falling-head permeability test was carried out on a clay soil of diameter 10 cm and length 15 cm. In 1 hour the head in the standpipe of diameter 5 mm dropped from 68 cm to 50.2 cm. Calculate the hydraulic conductivity of this clay.

  Determine a composite scs runoff curve number

Determine a composite SCS runoff curve number for a 600-acre basin that is totally within soil group C. The land use is 40 percent contoured row crops in poor hydrologic condition and 60 percent native parture in fair hydrologic condition.

  What are the additional treatment processes required and why

Discuss the role of each physical, chemical and biological unit operations and processes employed in the wastewater treatment facility. If this treatment facility is required to supply class A recycle water to those industries for non-potable use

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd