Determine the sum or difference of two numbers

Assignment Help Electrical Engineering
Reference no: EM13248463

1. In the simulation run of the four-bit adder, when we performed the additions of 2 + 4 and 3 + 6 we did not immediately have an output of 6 and 9 respectively on SOUT. What could be the cause of this?

2. If we changed the count period to 100ns for AI and BI would this correct the anomalities in Question 1? why or why not?

3. How fast can your 4-bit adder/subtractor determine the sum or difference of two numbers?

4. Use the simulation timing diagram to compare the worse case time to do an operation with your ALU with the worst case using the 74LS381. State which operation takes the longest and list the time required for both ALU's.

Reference no: EM13248463

Questions Cloud

Compare the worse case time to do an operation with alu : Use the simulation timing diagram to compare the worse case time to do an operation with your ALU with the worst case using the 74LS381. State which operation takes the longest and list the time required for both ALU's.
Explain what percent of ammonia dissociates to the elements : A 20L vessel is filled with 1.00 mol of ammonia. NH3. What percent of ammonia dissociates to the elements if equilibrium is reached at 345C
Explain the concepts of the product life cycle : Explain the concepts of the product life cycle and identify the four phases of the product development cycle. Make sure you define the strategies used in each phase.
Define positive direction in the forward direction : You drive your 1,345-kg car at a constant speed of 23 mph a distance of 71 m down a ramp that has a grade of 14 %. Define positive direction in the forward direction
Determine the sum or difference of two numbers : Use the simulation timing diagram to compare the worse case time to do an operation with your ALU with the worst case using the 74LS381. State which operation takes the longest and list the time required for both ALU's.
What component of the project plan will help you : What component of the project plan will help you determine how to manage this request for new requirements? Explain how this component is used to manage project changes.
Determine the second ball after the collision : A 4.4kg ball with a velocity of 5.0m/s in the+x-direction collides head-on elastically with a stationary 2.5kg ball. What is the speed of the second ball after the collision
Determine the stability of the closed-loop system : The loop transfer function L(S) of a single-feedback-loop control system is given below. Sketch the Nyquist plot of L(jw) for w=0 to w=infinity, Determine the stability of the closed-loop system.
How much fuel is required to spin up the asteroid : Consider Iron asteroid (density 7900 kg/m^3) shaped like a cylinder 5.0 km long and 3.0 km in diameter, How much fuel is required to spin up the asteroid

Reviews

Write a Review

Electrical Engineering Questions & Answers

  Calculate the current in the output of the source

Calculate the current in the output of the source before and after the installation of the new device and The temperature sensor output is a voltage which is equal to the temperature sensed by the sensor. Design an electric circuit which can get th..

  How long will it take to exhaust the fossil fuels

For much of the last century, the annual growth rate of energy utilization in the world was 3.5% per year. At present, the rate of global energy usage is approximately 15 TW. When considering only coal, oil, and gas.

  What current will be required for the plating operation

An electronics manufacturer makes corrosion-resisitant, gold-plated connectors. Each connector is cylindrical in shape with a diameter of .100 cm and a length of 1.0 cm. Each connector is to be coated with a 10 -(micrometer) gold layer.

  What does the documentation mean

Using the Internet, a magazine, or a provided list of memory modules, determine the exact part numbers and quantities of memory modules that you would buy. List them with the location of where you obtained the information.

  Determine second order butterworth lowpass filter

Determine the transfer function of a second order Butterworth Lowpass filter with a 3dB cutoff of 5 Kilo Hertz. Design a circuit which realizes this filter using Sallen-Key configuration. Find all the values of the circuit elements and determine t..

  What is the maximum effective data rate of the link

Consider a satellite communication link with a one way propagation delay of 300ms between the sender and receiver, operating at 10Mbps using packets of length 1500bytes. Length of the ACK packet is also 1500 bytes.

  To what value of capacitance pf should the capacitor change

The tuning capacitor of a Wien bridge oscillator is 100 pF and the frequency is 5 kHz. To what value of capacitance pF should the capacitor be changed to if the frequency is to be changed to 2 kHz

  Determine the initial stored charge and energy of capacitor

Determine the initial stored charge. Determine energy of the capacitor. If this capacitor is discharged to 0 V in a time interval of 1 s, find the average power delivered by the capacitor during the discharge interval.

  Estimate the primary current with secondary open

The laminated silicon steel core of a transformer has a mean length of 0.06 m and a cross section of 0.005 meter square. there are 150 turns on primary winding and 450 turns on the secondary. the input is 200 V rms at 50 Hz.

  What annual revenue is required to cover fixed costs

What annual revenue is required to cover fixed costs? What will be the annual variable costs? How much will electricity cost per kWh?

  What is the maximum volume in liters of carbon dioxide

The following equation represents the complete combustion of ethane: 2C2H6(g) + 7O2(g) 4CO2(g) + 6H2O(g)At the same temperature and pressure what is the maximum volume in liters of carbon dioxide

  What is the maximum frequency that an input

An OpAMP has a unity gain frequency (ft) of 10MHz and a slew rate of 10V/us and AVoc = 120dB at DC (f=0).  Assume VCC = -VEE = 15 Volts.a. Approximate the cutoff frequency of the OPAMP itself. b.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd