Determine the speed of the block after it has compressed the

Assignment Help Civil Engineering
Reference no: EM13549289

A 20 kg block slides along the rough surface for which the coefficient of kinetic friction is 0.2. The block strikes a nonlinear spring with a speed of v=4.5 m/s. The spring is termed "nonlinear" because it has resistance of Fs=ks^2 where k = 900 N/m^2. Determine the speed of the block after it has compressed the spring s=0.2m?

Reference no: EM13549289

Questions Cloud

The mechanism that your firm should put in place : Hardly Able Contracting Co., Inc., Contractors and Engineers, has been in business for twenty five years and has been progressively expanding since the firm's inception
At what load would you expect this specimen to fracture if : Three-point bending test was performed on an aluminum oxide specimen having a circular cross section of radius 5.5 mm; the specimen fractured at a load of 850 N when the distance between the support points was 50 mm. Another test is to be performed o..
Explain what processes are required to be put into place to : In this assignment you are a recent graduate and have been hired as an industrial engineer and your job is to set up the plant to produce a new product.
Calculate the current value of the index : A composite price index for the cost of vegetarian foods called eggs, artichokes, and tofu (EAT) was 330 ten years ago and has averaged an annual increase of 12% since. Calculate the current value of the index.
Determine the speed of the block after it has compressed the : A 20 kg block slides along the rough surface for which the coefficient of kinetic friction is 0.2. The block strikes a nonlinear spring with a speed of v=4.5 m/s. The spring is termed
Determine the average shearing stress in the bolts : A composite beam is made by attaching the timber and steel portions shown with bolts of 14-mm diameter spaced logitudinally every 200 mm. The modulous of elasticity is 10 GPa for the wood and 180 GPa for the steel
Describe a realistic investment problem where none of the : Assuming we are still in a world with only discrete investment choice, i.e., option A, option B, etc., describe a realistic investment problem where none of the environments discussed apply without some reframing.
Does the steel have adequate charpy v notch fracture tough : A Charpy V Notch test was conducted for an ASTM A572 Grade 50 bridge steel. the average values of the test results at four different test temperatires were found to be 10ft.lb -(-50 F) 15 ft.lb- 0F 40 ft.lb- 40F 60 ft.lb-100 F
How long would it be before the company could sell the : A multinational engineering consulting firm that wants to provide resort accommodations to certain clients is considering the purchase of a three-bedroom lodge in upper Montana that will cost $250,000.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd