Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
a soil has a moist buldk density of 1950 kg/m^3, a dry bulk density of 1750 kg/m^3, and a soilds mass density of 2650 kg/m^3. determine the saturation ratio
calculate the depth h of mud for which the 3m concrete retaining wall is on the verge of tipping about its forward edge A. the density of mud may be taken to be 1760 kg/m3 and that of concrete to be 2400 kg/m3.
Shaquille O Neal, who is listed as 7`1" tall is out of the NBA Playoffs and so has time to visit is pool. If he stands vertically in the water, completely submerged
A 45 kg machine is placed at the end of a 1.6 m long cantilever beam of elastic modulus 200 x 109 N/m and cross-sectional moment of inertia 1.6 x 10-5 m4.
The viscosity of the film of oil separating the piston from the cylinder is 0.020 lb.s/ft. Calculate the force required to maintain this motion.
A lab test for specific gravity, G, on two samples of lumber indicate that sample A has G= 0.4 and sample B has G= 0.9. Based on this information alone, which wood sample would you choose as a structural member for your construction project
A particle is moving with a velocity of Vo when s=0 and t=0. If it is subjected to a deceleration of a = (-K)v^3, where K is a constant, determine its velocity and position as functions of time.
calculate departures and latitudes, misclosures in departures and latitude, and traverse relative precision. Balance the departures and latitude using the compass rule, and calculate coordinates of points B, C, and D.
A haul fleet of trucks having a heaped capacity of 15 cy. is to be loaded by a hydraulic backhoe excavator (CT=.48 min.) with a 3 1/2 cy. heaped capacity. Assume the material is a wet loam that weighs 3380 lb/cy in the bank state
The bottom bar is made up of an aluminum bar and a steel bar, each 10 in. long placed in the parallel configuration at 70 F. That is also heated to 300 F.
The sag curve has a 70 mph design speed and G1 = -6% G2=+3%. Determine the minimum necessary clearance height of the overpass and the resultant elevation of the bottom of the overpass over the PVI.
Draw the shear and moment Diagram for a beam that is 10 feet long, supported on the left end by a roler, and the right end by a pin, and has a 1000 lb load placed in the center i.e at 5 feet.
Using the aluminum alloy 2014-T6, determine the largest allowable length of the aluminum bar AB for a centric load P of magnitude (A) 150 kN b=50 mm h=20 mm
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd