A simple highway curve is planned to connect two horizontal tangents that intersect at sta. 2500 + 00.00 at an external angle of 52 degrees. For a design speed of 60 mi/hr and a curve radius of about 1.25 times the minimum allowable, calculate
(a) the design rate of superelevation and (b) the required length of superelevation runoff.
Assume a four-lane undivided highway and 10-ft lanes. Clearly state any other assumptions that you think are needed.

Reference no: EM13297161

Questions Cloud

How to calculate the entropy change for the system : Calculate the entropy change for the system and the surroundings. The heat of fusion of water is 6.02 kJ/mol; Cp (water)=4.184 J/K/g, Cp(ice)=2.094 J/K/g.
Calculate the elevations at the vpc-vpt and high point : A 2000-ft vertical curve connects a +3% grade to a -5% grade. If the vertical tangents intersect at sta. 52 + 60.55 and elevation 877.62 ft, calculate the elevations at the VPC, VPT, high point, and sta. 54 + 00.
Explain the rate of the reverse reaction at equilibrium : Explain how the rate of the forward reaction compares to the rate of the reverse reaction at equilibrium
Compute the change in length of the rod : An aluminum rod is 17.0 cm long at 20°C and has a mass of 350 g. what is the change in length of the rod
Determine the required length of super elevation runoff : A simple highway curve is planned to connect two horizontal tangents that intersect at sta. 2500 + 00.00 at an external angle of 52 degrees. For a design speed of 60 mi/hr and a curve radius of about 1.25 times the minimum allowable
What would be the percentage appreciation on the stock : What would be the percentage appreciation on the stock bought by the venture investors versus the investment appreciation for the founders?
Compute the individual concentrations of c and of d : Calculate the individual concentrations of C and of D in the following unknown mixture: Compound C: Absorbance at 365nm = 0.150 Absorbance at 470nm
What is the value of a put option written on the stock : What is the value of a put option written on the stock with the same exercise price and expiration date as the call option? Round your answer to the nearest cent.
Determine how much air is needed combust the water : Soil material is being assessed as a possible liner for a sanitary landfill. A soil core was collected and brought to the laboratory. A 10-cm tall section of soil has 2 cm of water continuously ponded on it. The area of the core surface is 78 cm^2..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Explain about atterberg limits and cohesion for shear test

What relationship between Atterberg limits and cohesion for Shear test

  Calculate the normal and shear stress on planes making angle

a tension member with cross-sectional area 3 in2 resists a load of 10 kips. How do you Calculate the normal and shear stress on planes making a 0, 20, 45, and 60 angle with the transverse section.

  Define energy transfer in mechanical systems

Energy transfer in mechanical systems, A wheel is 800mm in diamiter and has a mass of 1000kg. on a horizontal surface without skidding, the vehicle accelerates uniformly at 0.5m/s^2 for 5 seconds.

  Duplex system with no redundancy

What is the salt usage for each regeneration if the system regenerated every 10 days? What size resin tanks (diameter, height) would be required for a duplex system with no redundancy?

  Concentration of moles in the tank solution

HOCL is added to water in a tank as a disinfectant. After equilibrium is reached it is found that the pH of the water in the tank is 8.2 and the gas phase partial pressure is the head space of the tank is 0.2E-7 atm.

  Calculate net present value

Set up life cycle diagram for both alternatives and calculate net present value (NPT) and annual cost for the life time.

  Calculate the depreciated portion of the ownership cost

Property taxes,insurance and storage will run 5%.What is the owning cost for the dozer?Use the time value method to calculate the depreciated portion of the ownership cost.

  Draw all aldehyde and ketone isomers of c6h12o

What is the reaction that occurs with hexanal and propanol (give both the hemiacetal and acetal products)?

  Maximum safe speed around the curve

What is the maximum safe speed around the curve? If the speed limit on the roadway is 60mph, what action should be taken by the engineer?

  How long the train blocked the crossing

Assuming constant acceleration, determine how long the train blocked the crossing. Dis- regard the width of the crossing.

  Travel of two particles problem

Two particles start from the same point along the same straight line and at the same instant. The first particle travels with a constant velocity v and the second with a constant acceleration.

  Where the maximum ground level concentration would occur

a power plant burns 150,000 tonnes (1 tonne = 1,000 kg) of coal each year. The coal has 2.5% sulfur content, and the air pollution control equipment removals approximately 94% of sulfur. Assume 10% of the sulfur content ends up in the ash.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd