Determine the required cross sectional area of the cables

Assignment Help Civil Engineering
Reference no: EM13314988

A steel plate which is 1.5 m by 1.5 m and 30 mm thick is lifted by four cables attached to its corners that meet at a point that is 2 m above the plate. Determine the required cross sectional area of the cables if the stress in them is not to exceed 20MPa.

Reference no: EM13314988

Questions Cloud

Where is the angular acceleration of meterstick a maximum : A meterstick (L = 1 m) has a mass of m = 0.217 kg. Initially it hangs from two short strings: one at the 25 cm mark and one at the 75 cm mark. Where is the angular acceleration of the meterstick a maximum
Background information and scientific rational : Vitamin D as supplement to anti-biotic therapy in treatment of latent TB - Can you write " background information and scientific rational " about this topic?
Determine the position-the velocity and the acceleration : the motion of a particle is defined by the relation x= 1.5t^4-30x^2+5t+10. where x and t are expressed in meters and seconds, respectively. Determine the position, the velocity and the acceleration of the particle when t=4s
What was the initial thrust due to the fuel : A 2110-kg test rocket is launched vertically from the launch pad. Its fuel (of negligible mass) provides a thrust force so that its vertical velocity as a function of time is given by v(t)=At+Bt^2, What was the initial thrust due to the fuel
Determine the required cross sectional area of the cables : A steel plate which is 1.5 m by 1.5 m and 30 mm thick is lifted by four cables attached to its corners that meet at a point that is 2 m above the plate. Determine the required cross sectional area of the cables
Ompare the ratio of kinetic energy to the potential energy : If a unit mass of groundwater accelerates from rest to an average linear velocity of 1 m per year and climbs a vertical distance of 1 m, compare the ratio of kinetic energy to the potential energy of the unit of groundwater.
Find the maximum height reached by the rocket : A rocket, initially at rest on the ground, accelerates straight upward from rest with constant acceleration 34.3m/s2. Find the maximum height ymax reached by the rocket
Determine what is the total energy per unit weight : A fluid in an aquifer is 23.6m above a reference datum; the fluid pressure is 4390 N/m2. The fluid density is 0.999E3 kg/m3. What is the total energy per unit mass What is the total energy per unit weight
Find the final volume in terms of the initial volume : Suppose that subsequent to this heating, 2.00 104 J of thermal energy is removed from the gas isothermally. Find the final volume in terms of the initial volume of the example

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find what is the maximum you would pay for the bond

A 10-year $2000 Bond with a coupon rate of 10% paid semi-annually is available for purchase. What is the maximum you would pay for this bond if your MARR (without inflation) is 6%, and you estimate an inflation rate of 3% annually

  Determine the velocity of slider block

Knowing that at t= 3s slider block C has moved 57 mm to the right, Determine the velocity of slider block C at t=0, (b) the acceleration of A and C, (c) the change in position of block A after 5s.

  What is the first-order rate constant for decay of bod

A 1.0 × 106 gallon reactor is used in a sewage-treatment plant. The influent biochemical oxygen demand (BOD) concentration is 100 mg/L, the effluent BOD concentration is 25 mg/L, and the flow rate through the reactor is 500 gal/min.

  What is probability that the wave height will exceed 6 meter

A nuclear facility in a coastal region is built to withstand ocean wave forces. Suppose the annual maximum wave height of the ocean waves (above the sea level) is a lognormal random variable with mean height of 4.0 meters and a c.o.v. of 0.8

  What is the original estimated duration of the project

The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.

  Compare the physical migration of workers

Compare the physical migration of workers during U.S. industrialization and present-day intellectual transition into a new type of workforce.

  Calculate the speed at impact on a large rock

A large rock became visible to a driver at a distance of 175 ft. Assuming a perception-reaction time of 0.8s, an initial speed of 42 mph, a coefficient of friction equal to 0.5, and a level roadway, calculate the speed at impact.

  Calculate the quantity of heat transferred to the water

Water is used in a heat exchange to cool 5 kg/s of air from 400 C to 200 C. Calculate (a) the minimum mass flux (kg/s) of the water and (b) the quantity of heat transferred (MJ) to the water each second.

  Calculate the water or cement ratio of the cement paste

Calculate the water/cement ratio of the cement paste in which all the cement will hydrate to leave no capillary pores. (density of cement: 3.1 g/cm3) ?

  Find the magnitude and direction of the friction force

Determine whether the block shown is in equilibrium and find the magnitude and direction of the friction force when theta=30 and P=150N

  Determine the support reactions and the force in each member

The space truss shown is supported by a ball-and-socket joint at D and by short links at A and C. Determine the support reactions and the force in each member of the space truss.

  Discuss about damp-proofing trenches

Discuss about damp-proofing trenches

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd