Determine the range of the gain for which system is unstable

Assignment Help Electrical Engineering
Reference no: EM13228164

The loop transfer function of a single-loop negative feedback system is: L(s) = Gc(s)G(s) = K(s + 2.5)(s + 3.2) / (s2(s + 1)(s + 10)(s + 30))

This system is called conditionally stable because it is stable only for a range of the gain K such that k1 < K < k2. Using the Routh-Hurwitz criteria and the root locus method, determine the range of the gain for which the system is stable.

Reference no: EM13228164

Questions Cloud

What are the values of the rise time and response time : A thermometer, initially at a temperature of 75 degrees Fahrenheit is suddenly immersed into a tank of water with a temperature of 180 degrees Fahrenheit. The time constant of the thermometer is 4 s.
Depict the structure of the alkyne : An alkyne of six carbon atoms gives the same single product in its reaction either with BH3 in THF followed by H2O2 /OH-, or with H2O/Hg2 /H3O . Draw the structure of the alkyne (containing only carbon and hydrogen atoms).
What are the determinants of health in humans : Discuss the ways that health can be conceptualized by a society - what are the determinants of health in humans?
Explain solution of the weak base amonia : 25mL of a .10M solution of the weak acid hydrofluoric acid, HF, is titrsted with .10M solution of the weak base amonia, NH3. Will the pH at the equivilance point be less than 7 equal to 7 or greater than 7? Explain. Ka for HF is 7.2e-4 and Kb for ..
Determine the range of the gain for which system is unstable : The loop transfer function of a single-loop negative feedback system is: L(s) = Gc(s)G(s) = K(s + 2.5)(s + 3.2) / (s2(s + 1)(s + 10)(s + 30)) This system is called conditionally stable because it is stable only for a range of the gain K
Discuss initial approach to designing and defining the site : A critical aspect of web design is the approach that you take to define and develop the parameters of your site. This includes your review and assessment of your own work to validate your site to make sure that it meets the needs of your client.
Determine the after-tax equivalent present worth : A certain engine lathe can be purchased for $330,000 and depreciated over three years to a zero salvage value with the SL method. This machine will produce metal parts that will generate revenues of $220,000 (time zero dollars) per year.
What is the conventional b-c ratio with present worth : A flood control project with a life of 12 years will require an investment of $300,000 and annual maintenance costs of $25,000. The project will provide no benefits for the first two years but will save $40,000 per year in flood damage
What is the maximum investment that will be allowed for dike : A state government is considering construction of a flood control dike having a life span of 15 years. History indicates that a flood occurs every 5 years, on average, and causes $600,000 in damages on each occasion.

Reviews

Write a Review

Electrical Engineering Questions & Answers

  What is its energy after the current drops to zero

1) A 1.5H inductor has a constant current of 2.5A. a) find the energy that it holds b) what is its voltage c) what is its energy after its current drops to zero and stays zero What power is dissipated when a 20 olhm resistor is connected to it

  Find real part of the network is a series rlc

Consider a network with a driving-impedance Z. (1) Find expression for P and Q. (2) Find p(t) in terms of P and Q. (3) Suppose that the network is a series RLC. Interpret the result in part (2).

  Design a critically damped series rlc circuit

Using the commonly available resistors, capacitors, and inductors, design a critically damped series RLC circuit (i.e., all three components are connected in series) with an undamped natural frequency of 20 krad/s.

  What effect does open loop voltage gain frequency response

Discuss different applications that could use non-inverting and inverting amplifier circuits. Will the actual op amp characteristics cause any challenges if used for each application

  Write down all of the frequency components

Four frequencies are applied at the input of a non-linear amplifier. Write down all of the frequency components at the output of the non-linear device. Write down only the first three harmonics.

  Determine the power produced by the turbine

A fluid flows through a turbine at the rate of 45 kg/min. Across the turbine the specific enthalpy drop of the fluid is 580 kj/kg and the turbine loses 2100 kj/min in the form of heat energy. Determine the power produced by the turbine.

  Write the assembly language program to load each number

Use the immediate addressing mode to add four to each value that is loaded to accumulator. Store the results in Locations 13-15. Let's assume that in Locations 10-12 we have the values 5, 6, and 7. After executing your code, the values in Location..

  What two points associated with the load line

Discuss the steps required in calculating the collector-emitter voltage in a VDB circuit. Why does this circuit have a very stable Q point Discuss whether transistors being used as switching circuits should be biased in the active region.

  Explain resistance of headlights

Resistance of Headlights, A 24-volt automotive battery is connected to two headlights, such that the two loads are in parallel

  What is the per-phase current

A three-phase substation transformer operating at 34.5kV is loaded to 24 MVA. What is the per-phase current? (assume balanced conditions)

  Explain how an electric shock may occur

A process worker received an electric shock when she attempted to turn off a conveyer control. The toggle switch controlled the power to a variable speed drive. An examination found that dust had accumulated on the toggle switch. Moisture on the ..

  Compute the number of clock cycles required to execute

1- Describe the function of the program. DO NOT WRITE THE OPERATION OF EACH INSTRUCTION 2- Assuming that the branch instruction is executed (the branch is taken), comput the number of clock cycles required to execute the loop (DECA or BNE AGAIN)

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!